Pacific Gas and Electric Company.
Gregory M. Rueger US Mail:
Senior Vice President-Mail Code 832 Generation and Pacific Gas and Electric Company Chief Nuclear Officer PO Box 770000 March 18, 2004 San Francisco. CA 94177-O001 Overnight Mail:
Mail Code 832 PG&E Letter HBL-04-003 Pacific Gas and Electric Company 77 Beale Street, 32nd Floor San Francisco. CA 94105-1814 U.S. Nuclear Regulatory Commission 415.973.4684 ATTN: Document Control Desk Fax: 415.973.2313 Washington, DC 20555-0001 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 Revision 5 to the Defueled Safety Analysis Report, Revision 14 to the SAFSTOR Quality Assurance Plan, and Revision I to the Technical Specifications Bases
Dear Commissioners and Staff:
Pursuant to 10 CFR 50.71 (e), Pacific Gas and Electric Company (PG&E) is enclosing the Humboldt Bay Power Plant (HBPP) Defueled Safety Analysis Report (DSAR), Revision 5, in accordance with 10 CFR 50.4(b)(6).
The changes contained in Revision 5 of the DSAR include plant modifications performed since DSAR, Revision 4, was submitted to the NRC (Reference PG&E Letter HBL-02-016, dated August 23, 2002), and reflect current plant configuration and organization, as well as an overall reformatting of the DSAR that was implemented to eliminate redundancies and provide better organization of DSAR information. Enclosure A contains Revision 5 of the DSAR in its entirety, including revision bars for the technical changes.
Enclosure B contains Revision 14 to the SAFSTOR Quality Assurance Plan that is being submitted in accordance with 10 CFR 50.54(a)(3). Changes are noted with revision bars.
Enclosure C contains Revision 1 to the HBPP Technical Specifications Bases that is being submitted in accordance with HBPP Technical Specification 5.6.2.d. Changes are noted with revision bars.
go n5D(
Document Control Desk March 18, 2004 Page 2 PG&E Letter HBL-04-003 If you have any questions regarding this submittal, please contact Mr. David Sokolsky at (707) 444-0801.
Si cerely, G Wry M.
'er Senior Vice President - Generation and Chief Nuclear Officer Enclosures cc:
cc/enc:
Marna Colcun William C. Huffman Chuck Mackey Bruce S. Mallett David Sokolsky PG FossilGen HBPP Humboldt Distribution
PG&E Letter HBL-04-003 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
PACIFIC GAS AND ELECTRIC COMPANY)
)
Docket No. 50-133 Facility Operating License No. DPR-7 Humboldt Bay Power Plant Unit 3
)
I AFFIDAVIT 1, Gregory M. Rueger, first being duly sworn, depose and say: that I am Senior Vice President - Generation and Chief Nuclear Officer, Pacific Gas and Electric Company, the licensee herein; that I have full power and authority to execute this oath and file with the Nuclear Regulatory Commission the enclosed Defueled Safety Analysis Report, Revision 5, and the enclosed SAFSTOR Quality Assurance Plan, Revision 14, on behalf of said company; that I am familiar with the contents thereof; and that the facts stated therein are true and correct to the best of my knowledge, information, and belief.
Grebo M. Rue'ger Senior ice President - Generation and Chief Nuclear Officer Subscribed and sworn to before me this 18th day of March, 2004.