NL-09-1692, Transmittal of Revision 8 to Security Plan

From kanterella
Jump to navigation Jump to search
Transmittal of Revision 8 to Security Plan
ML093160119
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 10/19/2009
From: Stinson L
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-09-1692
Download: ML093160119 (2)


Text

L. M. Stinson (Mike)

Southern Nuclear SAFEGUARDS INFORMATION Vice President Operating Company, Inc.

(THIS PAGE IS DECONTROLLED Fleet Operations Support 40 Inverness Center Parkway IF DETACHED FROM SGI PAGES Post Office Box 1295 Birmingham, Alabama 35201 IN ENCLOSURE 2)

Tel 205992.5181 Fax 205.992.0341 SOUTHERN 4

October 19, 2009 COMPANY Energy to Serve Your WorldsM Docket Nos:

50-321 50-348 50-424 NL-09-1692 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Southern Nuclear Operating Company Security Plan, Revision 8 Ladies and Gentlemen:

In accordance with the provisions of 10 CFR 50.54(p), Southern Nuclear Operating Company (SNC) hereby submits Revision 8 of the SNC Security Plan for the Edwin I. Hatch Nuclear Plant, the Joseph M. Farley Nuclear Plant, and the Vogtle Electric Generating Plant, effective October 1, 2009. SNC has reviewed the changes incorporated into Revision 8 in accordance with the provisions of 10 CFR 50.54(p)(2) and determined that this revision does not decrease the safeguards effectiveness of the SNC Security Plan.

In accordance with 10 CFR 50.4(b)(4), the appropriate copies are being provided to the Document Control Desk and the Region II office. Enclosure 1 provides a summary of the changes incorporated into the SNC Security Plan, Revision 8, and page removal/insertion instructions. Enclosure 2 provides the changed pages associated with Revision 8 of the SNC Security Plan.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY L. M. Stinson Vice President Fleet Operations Support LMS/TWS/

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE 2)

(7)

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE 2)

U. S. Nuclear Regulatory Commission NL-09-1692 Page 2

Enclosures:

1. Summary of the SNC Security Plan, Revision 8 Changes and Page Removal/Insertion Instructions
2.

SNC Security Plan Revised Pages (Note: Contains Safeguards Information) cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Ms. P. M. Marino, Vice President - Engineering Mr. T. E. Tynan, Vice President - Vogtle Mr. D. P. Burford, Fleet Security & EP Manager Mr. K. C. Dyar, Security Manager - Plant Vogtle Ms. L. B. Hogg, Security Manager - Plant Farley Mr. J. M. Merritt, Security Manger - Plant Hatch Mr. K. D. Wooten, Project Coordinator, Nuclear Security SNC Document Services RType: CFA04.054; CHA02.004; CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Ms. D. N. Wright, NRR Project Manager - Hatch Ms. D. N. Wright, NRR Project Manager - Vogtle Mr. M. Cain, Senior Resident Inspector - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch (letter only)

(letter only)

(letter only)

(letter only)

(letter only)

(letter only)

(Contains Safeguards)

(Contains Safeguards)

(Contains Safeguards)

(Contains Safeguards)

(Contains Safeguards)

(letter only)

(Contains Safeguards)

(letter only)

(letter only)

(letter only)

(Contains Safeguards)

(Contains Safeguards)

(Contains Safeguards)

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE 2)