Transmittal of Revision 23 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases
ML15152A228
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/22/2015
From: Vehec T
NextEra Energy Duane Arnold
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15152A226 List:
References
NG-15-0138
Download: ML15152A228 (2)


Text

N xTeram EN ERC,'Y'roi DUANE ARNOLD May 22, 2015 NG-1 5-0138 10 CFR 50.71(e) 10 CFR 54.37(b)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 Renewed Op. License No: DPR-49 Transmittal Of Revision 23 Of The DAEC Updated Final Safety Analysis Report And The Current DAEC Technical Specifications Bases This letter transmits the latest revision (No. 23) of the Updated Final Safety Analysis Report (UFSAR) for the Duane Arnold Energy Center (DAEC) as required by 10 CFR Section 50.71 (e). Enclosure 1 to this letter summarizes the changes included in this revision. Enclosure 2 contains the UFSAR Revision 23 changed pages and accurately represents all physical changes made to the plant and a number of changes made to the UFSAR since the previous submittal in May, 2013.

The DAEC Technical Requirements Manual (TRM) is incorporated by reference into UFSAR Chapter 16. Therefore, Enclosure 3 contains the TRM changed pages and represents all changes made to the TRM since the previous submittal in May, 2013.

The DAEC Technical Specifications Bases Control Program requires that changes to the Technical Specifications Bases (TSB) implemented without prior NRC approval be provided to the NRC on a frequency consistent with 10 CFR 50.71(e). Therefore, in accordance with Section 5.5.10.d of the DAEC Technical Specifications, Enclosure 4 contains the TSB changed pages and represents all changes made to the TSB since the previous submittal in May, 2013.

NextEra Energy Duane Arnold conducted a review of the DAEC plant changes for 10 CFR 54.37(b) applicability. No components were determined to meet the criteria for newly identified components as clarified by Regulatory Issue Summary (RIS) 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.34(b) for Holders of Renewed Licenses."

A053 NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324

May 22, 2015 NG-15-0138 Page 2 of 2 This letter contains no new commitments.

Please call Michael Davis at (319) 851-7032 with any questions regarding this submittal.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May 22, 2015.

T. A. Vehec Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Enclosures (4) cc Administrator Region Ill, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC