Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19003A325 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Figures 248-End)
- ML19003A344 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 279-303)
- ML19003A329 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering)
- ML19003A324 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Figures 226-247)
- ML19003A361 + (To Integrated Final Safety Analysis Report, Chapter 3, Appendix 3B, Leak-Before-Break Evaluation of the AP1000 Piping)
- ML19003A304 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering)
- ML19003A301 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.2, Nearby Industrial, Transportation, and Military Facilities)
- ML19003A367 + (To Integrated Final Safety Analysis Report, Chapter 3, Appendix 3G, Nuclear Island Seismic Analyses)
- ML19003A307 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.3, Probable Maximum Flood on Streams and Rivers)
- ML19003A317 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.11, Low Water Considerations)
- ML19003A302 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.3, Meteorology)
- ML19003A309 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.5, Probable Maximum Surge and Seiche Flooding)
- ML19003A409 + (To Integrated Final Safety Analysis Report, Chapter 18, Human Factors Engineering)
- ML19003A363 + (To Integrated Final Safety Analysis Report, Chapter 3, Appendix 3D, Methodology for Qualifying AP1000 Safety-Related Electrical and Mechanical Equipment)
- ML19003A340 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.6, Combined License Information)
- ML19003A360 + (To Integrated Final Safety Analysis Report, Chapter 3, Appendix 3A, HVAC Ducts and Duct Supports)
- ML19003A320 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Appendix 2AA, Transducer Data)
- ML19003A364 + (To Integrated Final Safety Analysis Report, Chapter 3, Appendix 3E, High-Energy Piping in the Nuclear Island)
- ML19003A306 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.2, Floods)
- ML19003A322 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Appendix 2CC, Groundwater Model Development and Analysis)
- ML19003A408 + (To Integrated Final Safety Analysis Report, Chapter 17, Quality Assurance)
- ML19003A352 + (To Integrated Final Safety Analysis Report, Chapter 3, Section 3.5, Missile Protection)
- ML19003A357 + (To Integrated Final Safety Analysis Report, Chapter 3, Section 3.10, Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment)
- ML19003A326 + (To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.13, Accidental Releases of Radioactive Liquid Effluents in Ground and Surface Waters)
- ML19003A298 + (To Integrated Final Safety Analysis Report, Chapter 2, Table of Contents)
- ML19003A347 + (To Integrated Final Safety Analysis Report, Chapter 3, Table of Contents)
- ML19003A373 + (To Integrated Final Safety Analysis Report, Chapter 4, Reactor)
- ML19003A378 + (To Integrated Final Safety Analysis Report, Chapter 8, Electric Power)
- ML19003A379 + (To Integrated Final Safety Analysis Report, Chapter 9, Auxiliary Systems)
- ML20053B415 + (To Interim Deficiency Rept DER-81-43 Re Steam Generators Loose Internal Nuts & Couplings.Technical Evaluation Currently Underway by Bechtel & C-E.Final Rept Expected by 820921)
- ML20063K955 + (To Interim Deficiency Rept Re Implementation of Outdated C-E Procedures for Instrument Calibr Due to Bechtel Supplier Document Register Errors.Initially Reported on 820421.C-E Reviewing Register.Final Rept Expected by 821020)
- ML20040F255 + (To Interim Deficiency Rept Re Inability of Turbine Driven Pump to Provide Feedwater Flow within 10-s, Initially Reported 810605.Initial Flow Requirement Will Be Reanalyzed to Establish Correct Timing.Next Rept by 820603)
- ML20062N595 + (To Interim Reliability Evaluation Program, Browns Ferry Team Fault Tree Guide)
- ML19347B106 + (To Introduction of Suppl 1, Environ Qualification Data Packages)
- ML20041G271 + (To Inventory,Status & Control of SNM)
- ML20009F243 + (To Jm Farley Nuclear Plant - Unit 1 Inservice Testing Program)
- ML20066A844 + (To Jm Farley Nuclear Plant Unit 1 Inservice Testing Program)
- ML16025A093 + (To Joint Information Center (JIC) Operations, EP-PI-261)
- ML16015A011 + (To Joint Information Center (JIC) Operations, EP-PI-261)
- ML19025A304 + (To K. Hays Georgia Draft Periodic Meeting Summary on December 10,2018)
- ML051530311 + (To Keep You Apprised of Changes in the Kewaunee Nuclear Power Plant Organization)
- CPSES-200201678, To LAR 02-02 Provides Revised Section 5.1 Which Includes Administrative Change + (To LAR 02-02 Provides Revised Section 5.1 Which Includes Administrative Change)
- 05000346/LER-1979-057, To LER 79-057/01T-1:on 790518,determined Some Hydraulic Snubbers May Not Have Fulfilled Functional Requirements.Caused by Improper Installation & Restrictive Performance Limits + (To LER 79-057/01T-1:on 790518,determined Some Hydraulic Snubbers May Not Have Fulfilled Functional Requirements.Caused by Improper Installation & Restrictive Performance Limits)
- ML15233A095 + (To LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions)
- ML20038B856 + (To LaSalle County Station Offsite Dose Calculation Manual)
- CPSES-200200481, To License Amendment Request (LAR) 01-011, Revision to Technical Specification (Ts), TS 4.2.1, Fuel Assemblies + (To License Amendment Request (LAR) 01-011, Revision to Technical Specification (Ts), TS 4.2.1, Fuel Assemblies)
- ML053340311 + (To License Amendment Request (LAR) Associated with Lee Combustion Turbine (Lct) Testing Program, TSC Number 2004-14)
- TMI-18-100, To License Amendment Request - Proposed Changes to Technical Specifications Sections 1.0, Definitions, and 6.0, Administrative Controls for Permanently Defueled Condition + (To License Amendment Request - Proposed Changes to Technical Specifications Sections 1.0, Definitions, and 6.0, Administrative Controls for Permanently Defueled Condition)
- DCL-02-020, To License Amendment Request 01-04 Revision to Technical Specifications 3.9.4 Containment Penetrations + (To License Amendment Request 01-04 Revision to Technical Specifications 3.9.4 Containment Penetrations)
- DCL-04-022, To License Amendment Request 01-08, Credit for Automatic Actuation of Pressurizer Power Operated Relief Valves + (To License Amendment Request 01-08, Credit for Automatic Actuation of Pressurizer Power Operated Relief Valves)
- DCL-03-095, To License Amendment Request 03-05, Revision of Technical Specification (TS) 3.7.10, Control Room Ventilation System (Crvs). TS 3.7.12. Auxiliary Building Ventilation System (Abvs). TS 3.7.13 + (To License Amendment Request 03-05, Revision of Technical Specification (TS) 3.7.10, Control Room Ventilation System (Crvs). TS 3.7.12. Auxiliary Building Ventilation System (Abvs). TS 3.7.13)