Docket Nos. 50-528/529/530
~
50 55(e) Report ADIEEM3fa F!3FRMD SDLGR7t(DTJ3 @@3HPEST STA.
P.o. box 21666 - -
PHOENIX. ARIZONA 85036 February 1, 1982 ANPP-20043-GIID/BSK '
A U. S. Nuclear Regulatory Commission
' Region V 3
,b creekside Oaks Office Park
~
w 1450 Maria Lane - Suite 210 7/
/
! %>% ?
3 9
'D 7
Walnut Creek, California 94596-5368 9
Attention:
Mr. B. H. Faulkenberry, Chief
\\,
[A..} kd 4
Reactor Construction and
,\\
'D N&g":p
,p Engineering Support Branch
/;,,l((gf-
Subject:
Interim Report, Revision 1 - DER 81-15 A 50.55(e) Potentially Reportable Deficiency Relating to Turbine Driven Pump May Not Provide Auxiliary Feed-water Flow Within Ten (10) Seconds in Case of Motor Driven Pump Failure File: 82-019-026 D.4.33.2
Reference:
(A) Telephone Conversation between J. Eckhardt and B. S. Kaplan on June 5, 1981 (B) ANPP-18289, dated June 26, 1981 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A),and an Interim Report was transmitted by Reference (B). At that time, it was estimated,that a Final Report would be available by February 1, 1982.
Due to the extensive investigation and evaluation required, a revised Interim Report is attached.
It is now expected that this information will be finalized by June 3, 1982, at which time a complete report will be submitted.
Very truly y urs, CLLt dn@ (m E. E. Van Brunt, Jrp cl l
APSVicePre.cidenty Q
l Nuclear Projects 3
m
}lj ANPP Project Director cag EEVBJr/CHD:ske I
9 Attachment w
Q cc: See Attached Page 2 8202090013 820201 PDR ADOCK 05000528 S
PDR JSR -29
- U. S. Nuc1 car Ragulatory Commission
' Attention:
Mr. B. H. Faulkenberry, Chief
.'ANPP-20043-GHD/BSK February 1, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G.'C.
Andognini F. W. Hartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W'. J. Stubblefield W. G. Bingham R. L..Patterson R. W. Welcher' R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503
-Ms. Patricia Lee Hourihan 6413 South 26th Street
~
j Phoenix, Arizona 85040 l
W T
1 I
r i..
(
1
r:
4 INTERIM REPORT, REVISION 1 - DER 81-15 POTENTIAL REPORNBLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1, 2 and 3 I.
POTENTIAL PROBLEM Combustion Engineerlag (CE) auxiliary feedwater interface requirement to initiate flow within ten (10) seconds is to ensure that auxiliary feedwater reaches the steam generators before the steam generators boil dry. With off-site power
'and a single failure of the motor-driven pump, the turbine-driver may not initiate flow within ten (10) seconds.
II.
APPROACH TO AND STATUS OF PROPOSED RESOLUTION CE will reanalyze the ten (10) second initial flow requirement to establish the correct time. A quick-start test on the tur-bine, to verify supplier's verbal belief that start time can be reduced by adjustment of the turbine governor, has been approved and scheduled ~for January, 1982. CE will begin analysis in April, 1982.
III.
PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE FINAL REPORT Evaluation of this condition and submittal of the Final Report is forecast to be completed by June 3,1982.
L