Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13308A328 + (Submittal of BWROG Report - Summary of Member Responses to BWROG Survey on Strainer Head Loss and Near-Field Effects, BWROG-ECCS-WP-3-1, for NRC Information and Commentary)
- ML14176A962 + (Submittal of BWROG Responses to NRC Questions Associated with BWROG Report - BWR Material Dissolution Test Plan, BWROG-ECCS-WP-4-1 R4 (BWROG-14003 Originally Submitted on January 23, 2014))
- ML14077A098 + (Submittal of BWROG Technical Reports Addressing the NRC Guidance Document on the Use of Containment Accident Pressure (CAP) in Analyzing ECCS and Containment Heat Removal System Pump Performance in Postulated Accidents - Cvic Pumps)
- ML12300A286 + (Submittal of BWROG Technical Reports Addressing the NRC Guidance Document on the Use of Containment Accident Pressure (CAP) in Analyzing Emergency Core Cooling System (ECCS) and Containment Heat Removal System Pump Performance in Postulated)
- ML23198A334 + (Submittal of BWRVIP-100, Rev. 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components)
- ML053260601 + (Submittal of BWRVIP-145: BWR Vessel and Internals Project, Evaluation of Susquehanna Unit 2 Top Guide and Shroud Using RAMA Fluence Methodology, EPRI Technical Report 1011694, October 2005)
- ML23156A225 + (Submittal of BWXT Advanced Technologies LLCs (BWXT at) Regulatory Update Slides for Public Portion of June 6, 2023 Meeting)
- ML23282A013 + (Submittal of BWXT Advanced Technologies LLCs (BWXT at) October 24, 2023 Meeting Presentation Material)
- ML043630390 + (Submittal of Bases Revision to the Kewaunee Nuclear Power Plant Technical Specifications)
- ML12111A174 + (Submittal of Batch 1 Responses to RAIs Associated with Boiling Water Reactor Owners’ Group (BWROG) Licensing Topical Report NEDC-33608P, Boiling Water Reactor Emergency Core Cooling Suction Strainer In-Vessel Downstream Effects)
- ML12144A125 + (Submittal of Batch 2 Responses to RAIs Associated with Boiling Water Reactor Owners’ Group (BWROG) Licensing Topical Report NEDC-33608P, Boiling Water Reactor Emergency Core Cooling Suction Strainer In-Vessel Downstream Effects)
- L-17-230, Submittal of Beaver Valley Power Station Emergency Preparedness Plan + (Submittal of Beaver Valley Power Station Emergency Preparedness Plan)
- L-18-144, Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report + (Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report)
- ML18331A065 + (Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report)
- EPID:L-2018-LRO-0105 + (Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report)
- RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 + (Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016)
- ML13091A022 + (Submittal of Biennial Decommissioning Financial Assurance Reports)
- ML13091A025 + (Submittal of Biennial Decommissioning Financial Assurance Reports)
- LR-N09-0014, Submittal of Biennial Decommissioning Funding Status Report + (Submittal of Biennial Decommissioning Funding Status Report)
- RA-10-010, Submittal of Biennial Decommissioning Funding Status Report Correction + (Submittal of Biennial Decommissioning Funding Status Report Correction)
- ML19157A047 + (Submittal of Biennial Report of 10 CFR 72.48 Evaluations Performed for the Nu Homs Eos System, CoC 1042, for the Period 06/07/17 to 06/06/19)
- ML24116A158 + (Submittal of Biennial Report of 10 CFR 72.48 Evaluations Performed for the NUHOMS Eos System, CoC 1042 for the Period 7/18/2023 to 4/25/2024, Docket 72-1042)
- ML18208A442 + (Submittal of Biennial Report of 10 CFR 72.48 Evaluations Performed for the Standardized NUHOMS System, CoC 1004, for the Period 07/26/16 to 07/25/18, Docket 72-1004)
- AEP-NRC-2019-10, Submittal of Biennial Report on the Status of Decommissioning Funding + (Submittal of Biennial Report on the Status of Decommissioning Funding)
- NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report + (Submittal of Biennial Review of the Fermi 1 Safety Analysis Report)
- ML16084A616 + (Submittal of Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant, Units 1 and 2 in St. Lucie County, Florida)
- ML18023A157 + (Submittal of Blind Sample Error Investigation Report)
- JAFP-09-0077, Submittal of Blind Sample Error Investigation Report + (Submittal of Blind Sample Error Investigation Report)
- W3F1-2010-0024, Submittal of Blind Sample Investigation Report + (Submittal of Blind Sample Investigation Report)
- ULNRC-05575, Submittal of Blind Sample Test Results + (Submittal of Blind Sample Test Results)
- ML13183A017 + (Submittal of Boiling Water Reactor Owners Group Licensing Topical Report BWROG-TP-11-023-A, Revision 0, Linear Elastic Fracture Mechanics Evaluation of General Electric Boiling Water Reactor Water Level Instrument Nozzles for Pressure-Tempe)
- ML13277A557 + (Submittal of Boiling Water Reactor Owners Group Topical Report BWROG-TP-11-022-A, Revision 1, Pressure-Temperature Limits Report Methodology for Boiling Water Reactors)
- ML110140479 + (Submittal of Boiling Water Reactor Owners Group (BWROG) - Licensing Topical Report, Boiling Water Reactor Emergency Core Cooling Suction Strainer In-Vessel Downstream Effects NEDC-33608P)
- ML100120241 + (Submittal of Braidwood Station Site-Specific Safstor Decommissioning Cost Estimate)
- ML21300A075 + (Submittal of Braidwood Unit 2 - Pressure and Temperature Limits Report (PTLR) Revision 8)
- ML21300A074 + (Submittal of Braidwood Unit 2 - Pressure and Temperature Limits Report (PTLR) Revision 8)
- ML022610243 + (Submittal of Browns Ferry Nuclear Plant Units 1, 2, & 3, American Society of Mechanical Engineers (ASME) Section XI, Inservice Testing (IST) Program for Third Ten-Year Interval)
- ML21277A123 + (Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw Evaluation)
- EPID:L-2021-LRO-0054 + (Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw Evaluation)
- ML062920154 + (Submittal of Browns Ferry, Units 1, 2 & 3 - Technical Specifications Changes TS-431 & TS-418 Extended Power Uprate (EPU) - NPSH Requirements - Pump Vendor Report)
- ML042610122 + (Submittal of Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models)
- ML23212A008 + (Submittal of CFPP LLC, Carbon Free Power Project (CFPP) Application for Limited Work Authorization)
- ML15093A421 + (Submittal of CNEI-0400-281, Revision 0, Core Operating Limits Reports for Cycle 21 Reload Core, Calculation CNC-1553.05-00-0621)
- ML13154A049 + (Submittal of CS Innovations Documents and Revised Software Configuration Management Plan for the License Amendment Request for Digital Process Protection System Replacement)
- DCL-13-087, Submittal of CS Innovations Documents for the License Amendment Request for Digital Process Protection System Replacement + (Submittal of CS Innovations Documents for the License Amendment Request for Digital Process Protection System Replacement)
- ML033650368 + (Submittal of Calculations Discussed During December 17, 2003, Regulatory Conference on Preliminary White Finding, NRC Integrated IR 055000440-03-006)
- RCF 15-01, Submittal of Calendar Year 2014 (CY2014) Operation Report of the Rensselaer Polytechnic Institute (RPI) Reactor Critical Facility (RCF) to the U.S. Nuclear Regulatory Commission (NRC) and the RPI Management + (Submittal of Calendar Year 2014 (CY2014) Operation Report of the Rensselaer Polytechnic Institute (RPI) Reactor Critical Facility (RCF) to the U.S. Nuclear Regulatory Commission (NRC) and the RPI Management)
- ML25085A002 + (Submittal of Callaway Plant Decommissioning Funding Status Report)
- ML25085A001 + (Submittal of Callaway Plant Decommissioning Funding Status Report)
- ULNRC-06280, Submittal of Callaway Unit 1 Fitness for Duty Program Performance Data for 2015 + (Submittal of Callaway Unit 1 Fitness for Duty Program Performance Data for 2015)
- ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report + (Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report)
- ML24122A113 + (Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report)