Submittal of Callaway Plant Decommissioning Funding Status Report
ML25085A002
Person / Time
Site: Callaway 
Issue date: 03/26/2025
From: Elwood T
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML25085A001 List:
References
ULNRC-06931
Download: ML25085A002 (1)


Text

Callaway Plant su TAmeren Mtssount March 26,2025 ULNRC-0693I U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 cFR 50.75(0(1)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT I]IIIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF.3O STATUS OF PLANT DECOMMISSIONING F'UNDING In accordance with the requirements of 10 CFR 50.75(0(l), which requires reporting of the status of reactor decommissioning fi.rnding, Union Electric Company (Ameren Missouri) hereby submits its Callaway Plant Decommissioning Funding Status Report. This report is required to be submittedat2-year intervals in accordance with 10 CFR 50.75(0(l), which states in part:

Each power reactor licensee shall report, on a calendar-year basis, to the NRC by March 31, 1999, and at least once every 2 years thereafter on the status of its decommissioningfunding...

The report is provided as Enclosure 1 to this letter.

This letter does not contain any new commitnents. If you have any questions on this report, please contact the undersigned at (314) 225-1905.

Sincerely, W,B.&A Thomas B. Elwood Manager, Regulatory Affairs 8315 County Road 459 : Steedman, MO 65077 : AmerenMissouri.com

ULNRC.O6931 March 26,2025 Page2 of 4 Enclosure I Enclostre 3 NRC Plant Decommissioning Funding Status Report -2025 Minimum Decommissioning Cost per 10 CFR 50.75 Formula Process -

December2024 Decommissioning Cost Analysis for the Callaway Energy Center - September 2023 Book and Market Summary - 31 December 2024 Amended Application for Acceptance of Decommissioning Cost Estimates for Callaway Energy Center, Including Independent Spent Fuel Storage Installation, and Approval of Funding Levbl forNuclear Decommissioning Trust Fund Ameren Nuclear Decommissioning Trust Results of Asset/Liability Study and Funding Adequacy Analysis - F all 2023 Non-Unanimous Stipulation and Agreement

ULNRC.O6931 March 26,2025 Page 3 of4 cc: Mr. John Monninger Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 7601 l-4511 Senior Resident Inspector Callaway Resident Offi ce U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop OSBIA Washington, DC 20555-0001

ULNRC-06931 March 26,2025 Page 4 of4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth,TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)