Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Submits Responses to Draft Comments of Kansas Final 10CFR20 Rule". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20217E752  + (Submits Responses & Clarifications to Requesting Mods to Proposed Sampling Criteria for Conduit & Cable Tray Support Calculations & MOV Calculations)
  • ML20207T106  + (Submits Responses Re Rev 13 to ETR-1001, Nuclear QA Program Manual, for Consideration,Per NRC & 870312 Meeting.Revised Pages to Rev 7 to Section QA-I-2 of Nuclear Qaz Program Encl)
  • ML19305A367  + (Submits Responses Re Startup Testing Requested by NRC 790109 & 790118 Telcons & .Current Schedule Calls for Refueling Shutdown to Begin 790323.Requests Issuance of Cycle 4 Tech Specs)
  • ML19289G301  + (Submits Responses by New Bedford Gas & Edison Light Co,New England Power Co & Montaup Electric Co to NRC 790717 Request for Addl Financial Info.Affidavits,Sec Form 10-Q for 1978-79 & Testimony of E Cheney & R Wright Encl)
  • ML20198N794  + (Submits Responses to & 970922 & 0923 Telcons Re RAI Concerning EDG Upgrade Project)
  • ML18153A587  + (Submits Responses to 14 Anomalies Identified in 941020 Se. Informs TR Complete & TAC Numbers M93931 & M93932 Complete)
  • ML19242A265  + (Submits Responses to 760614 Questions.Proposed Embankment Will Not Be Overtopped by 100-yr & 1/2 PMF Precipitation Events.In Event of Dam Failure,Flood Waters Will Be Out of Channel Banks for Max Distance of 3 Miles Downstream)
  • ML19248C607  + (Submits Responses to 790619 Questions Re Reactor Vessel Supports)
  • ML19269E541  + (Submits Responses to 790619 Telcon Inquiries Re Reactor Vessel Support Structures.One Oversized Drawing Encl)
  • ML19294C153  + (Submits Responses to 790831 Questions Re 790816 Rept, Significance of Recent Snubber Failures)
  • ML18139A822  + (Submits Responses to 800731 Comments on Draft EIS Re Steam Generator Repair Program.Comments Received After 800731 Issuance of Fes)
  • TXX-3666, Submits Responses to 811112-14 Requests at ACRS 259th Meeting Re Containment Hydrogen Purge Sys Filters & Control Room Occupancy Vs Containment Leakage Rate  + (Submits Responses to 811112-14 Requests at ACRS 259th Meeting Re Containment Hydrogen Purge Sys Filters & Control Room Occupancy Vs Containment Leakage Rate)
  • ML20125D018  + (Submits Responses to 840907 Memo Re Suggested Commission Actions to Minimize Potential for Delay in Plant Case.Secy Action on COMJA-84-7 Complete)
  • A851900, Submits Responses to 851011 Questions Re QA Organization,Qa Topical Rept & QA Program Controls.Changes Will Be Incorporated Into Next Rev to QATR-1  + (Submits Responses to 851011 Questions Re QA Organization,Qa Topical Rept & QA Program Controls.Changes Will Be Incorporated Into Next Rev to QATR-1)
  • ML18038A085  + (Submits Responses to 851011 Questions Re QA Organization,Qa Topical Rept & QA Program Controls.Changes Will Be Incorporated Into Next Rev to QATR-1)
  • ML20213F484  + (Submits Responses to 860204 Memo Re 851126 Investigation for Inclusion in Overall Response.Emergency Notification Sys Used for Data Passage.Use as Counterpart Link Not Harmful If No Data to Be Passed)
  • NSD-NRC-96-4841, Submits Responses to 961003 Telcon Re NRC Mechanical Engineering Branch Questions Related to Qa,Reactor Vessel Internal Vibration,Crdms & Equipment Seismic Qualification  + (Submits Responses to 961003 Telcon Re NRC Mechanical Engineering Branch Questions Related to Qa,Reactor Vessel Internal Vibration,Crdms & Equipment Seismic Qualification)
  • A07937, Submits Responses to AEOD Survey on NRC Backfitting Process. Table Listing Costs of Imposed Backfits in 1988 Encl  + (Submits Responses to AEOD Survey on NRC Backfitting Process. Table Listing Costs of Imposed Backfits in 1988 Encl)
  • ML19262B500  + (Submits Responses to ASLB 791130 Order,Paragraphs 4 & 5. Completion & Filing of Safety Evaluation for Proposed Control Bldg Mod Anticipated on 800214.Time Limit on Length of Interim Operation Not Needed.Prof Qualifications Encl)
  • ML20153B966  + (Submits Responses to ASLB Suggestions for Improvement Re Offsite Radiological Emergency Preparedness Issues,Per 811214 Partial Initial Decision.Revised Plans Received for 36 Risk Municipalities)
  • ML19296A911  + (Submits Responses to Actions Requested in Re IE Bulletin 79-18.Forwards Proposed Mods for Evacuation Announcement Sys & Alarms.Schedule for Completion of Proposed Corrective Actions Will Be Submitted by 800131)
  • ML19318A523  + (Submits Responses to Addl TMI-2 Related Requirements Per 800507 Request)
  • ML20076K635  + (Submits Responses to Administrative Ltr 94-12, Operator Licensing Natl Exam Schedule)
  • ML20004D396  + (Submits Responses to Be Included in FSAR Amend 36 for Submittal on 810608)
  • ML20069P627  + (Submits Responses to Chemical Engineering Branch Open Items. Addl Info on Secondary Water Chemistry Requested to Complete Review)
  • ML20199G889  + (Submits Responses to Draft Comments of Kansas Final 10CFR20 Rule)
  • ML20198F509  + (Submits Responses to EPA Comments on Radwaste Section of Environ Statement,Per W Regan 721026 Request)
  • ML19305B848  + (Submits Responses to Encl 3,Items 6 & 7 of NRC Re Evaluation of 800226 Event)
  • ML19350C768  + (Submits Responses to Encl NRC Questions Re Low Temp Overpressurization Mods)
  • ML20070L985  + (Submits Responses to FSAR Open Items in SRP 13.5 Re Procedures & Tests,Per 821014 Memo.Revs to Be Incorporated in Upcoming FSAR Amend)
  • ML20217H263  + (Submits Responses to Final Impep follow-up Review Rept.For Recommendation 3,senior Staff Conducted in-svc for Field Inspectors Which Emphasized Need to Include Supporting Documentation for Violations Noted in Insp Repts)
  • NSD-NRC-97-5018, Submits Responses to Four NRC Open Items Re Piping Identified as Action W in Encl 7 of NRC .Responses & Associated SSAR Revs Permit Staff to Close Out Open Items in Section 3.12 & Provide FSER Input  + (Submits Responses to Four NRC Open Items Re Piping Identified as Action W in Encl 7 of NRC .Responses & Associated SSAR Revs Permit Staff to Close Out Open Items in Section 3.12 & Provide FSER Input)
  • ML20217E926  + (Submits Responses to Four RAIs Received During 980325 Conference Call W/Nrc Granting Regional Enforcement Discretion for Applicability,Surveillance Requirements)
  • ML19224C289  + (Submits Responses to IE Bulletin 79-06A.Program Initiated to Assure That All Licensed Operators,Plant Mgt & Supervisors W/Operational Responsibilities Will Be Familiar W/Tmi Incident)
  • ML19309H391  + (Submits Responses to IE Bulletin 80-02 Concerning QA of Reactor Feedwater Spargers.No Feedwater Sparger Matl Currently Installed.Mod Utilizing Matl in Progress for Unit 2 & Being Planned for Unit 3 Refueling Outage)
  • ML19338G434  + (Submits Responses to Info Request Re Fuel Flooding Sys Flow Rates.Fuel Flooding Sys Utilizes Single Reservoir Supply Lines to Containment Bldg.Lines Split Leading to Reactor Core & Canal Fuel Storage Tanks)
  • ML13322A850  + (Submits Responses to Items 1,2 & 3 of NRC Re Failure of Saltwater Cooling Sys.Response to Item 4 Will Be Submitted by 800804)
  • ML19290F027  + (Submits Responses to Items 1-5 in NRC Re Facility 800226 Event.Provides Description of Event,Summary of Previous Power Upset Events & Plant Susceptibility to Event Occurrences.Believes Continued Operation Acceptable)
  • ML20129K275  + (Submits Responses to Items 4 & 5 of TAR from Region Iii,)
  • ML20129K276  + (Submits Responses to Items 4 & 5 of TAR from Region Iii,Dtd 960906)
  • ML20138Q907  + (Submits Responses to Listed Comments Re Testing Period for Inservice Diesel Generators,Accessibility of Generators to Crossties & Capability of Vital Bus Auto Load Shedding,Per 851018 Telcon)
  • ML19289F591  + (Submits Responses to NRC 790607 Questions Re Gaseous Effluent Monitoring Sys)
  • ML19326D729  + (Submits Responses to NRC 800506 Request for Addl Info Re Adequacy of Station Electrical Distribution Sys Voltages)
  • ML19320B331  + (Submits Responses to NRC 800616 Draft Questions Concerning Containment Purge Valves.Comparison of Facility Purge Sys W/ Branch Technical Position Csb 6-4 Encl)
  • ML20004D701  + (Submits Responses to NRC 810224 Questions Re post-test Analyses of S-07-10D & L3-1 Tests.Present Small Beak LOCA Analysis Techniques Are in Agreement W/Test Data When Actual Test Conditions Are Considered)
  • ML20062J038  + (Submits Responses to NRC 820513 Request for Addl Info Re OL Antitrust Review,Per Util .Related Correspondence Encl)
  • ML20235J724  + (Submits Responses to NRC 870820 Request for Addl Info Re Settlement Monitoring Program.Encl Proprietary Sketch SK-2-C-330 Provides Plan View of Major Power Block Structures.Sketch Withheld)
  • ML20206P318  + (Submits Responses to NRC 970828,0927 & 1023 Requests for Addl Info on Cushing Site Decommissioning Plan.Revised Portion of Section 3 of Subj Plan Encl)
  • ML13317B132  + (Submits Responses to NRC Concerns Identified in Re Main Steam Line Break Analysis,Nonlinear Analysis of Masonry Walls & Seismic Upgrading Schedule)
  • ML20040H109  + (Submits Responses to NRC Concerns Re Target Rock Safety/ Relief Valves Raised at 811218 Meeting.Analyses,Insp & Testing Indicate That Target Rock Valves Issue Should Not Affect Resumption of Power Operation)
  • 0CAN099303, Submits Responses to NRC GL-89-10,Suppl 5, Inaccuracy of MOV Diagnostic Equipment, .Planned Actions Include Obtaining Estimate Inaccuracy Factor by 931020  + (Submits Responses to NRC GL-89-10,Suppl 5, Inaccuracy of MOV Diagnostic Equipment, .Planned Actions Include Obtaining Estimate Inaccuracy Factor by 931020)