Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19274D562 + (Submits Addl Info Re Containment Shell Buckling Criteria & Application.Requests Concurrence W/Approach Before Inclusion in Rept)
- ML18082A746 + (Submits Addl Info Re Containment Sump Model Test Program. Objective Is to Confirm Existing Sump Design Or,If Improvements Are Indicated,To Develop Suitable Mods.Check Testing of Final Design Will Be Performed)
- ML19347D807 + (Submits Addl Info Re Contamination of Portion of Railroad right-of-way Adjacent to Lynchburg Research Ctr. Contamination Leakage Originated from Work in Hot Cell Facility.Oversize Drawing Encl.Aperture Card Will Be in PDR)
- ML20150C228 + (Submits Addl Info Re Contractor & Util Instrument Technician Work on QA Manual & Work Request Program)
- ML20235B221 + (Submits Addl Info Re Control 11607,per 820709 Request. Description of Facilities & Equipment & Name of Company Providing Servicing Operations Among Items Addressed)
- 3F0588-10, Submits Addl Info Re Control Room Habitability Conformance to NUREG 0737,Item III.D.3.4,per NRC 880329 Request.Util Performs Quarterly Calibr on Local SO2 Tank Detectors in Response to 880419 Telcon + (Submits Addl Info Re Control Room Habitability Conformance to NUREG 0737,Item III.D.3.4,per NRC 880329 Request.Util Performs Quarterly Calibr on Local SO2 Tank Detectors in Response to 880419 Telcon)
- ML20214K479 + (Submits Addl Info Re Control of Tools & Equipment Necessary to Accomplish Fire Actions,Per Gr Rivenbark 861117 Request. Tools & Equipment Will Be Stored in Locked Gang Boxes & File Cabinets Located within Plant)
- ML20083D010 + (Submits Addl Info Re Core Shroud Mod)
- ML20032D283 + (Submits Addl Info Re Correction of Variances in Control Bldg Ventilation Sys Per NUREG-0737 Requirements & in Response to SRP 6.4,Reg Guides 1.78 & 1.95.Further Details Will Be Provided by 811215)
- ML19340A211 + (Submits Addl Info Re Costs for Station Const Through Oct 1971,job Shutdown for Half Yr for Oconee & Associated Transmission Lines & Predicted Const Expenditures for Half Yr for Station & Transmission Lines)
- ML20090L849 + (Submits Addl Info Re Cracked Studs on Recirculation Pumps. Info Reviewed During Insp on 740716-18)
- ML20004C814 + (Submits Addl Info Re Criticality Concerns of Submerged Demineralizer Sys,In Response to NRC Request.Demineralizer Will Not Become Location for Critical Mass of U Dioxide. Required Geometry Cannot Exist Concurrently W/Moderator)
- ML20141L026 + (Submits Addl Info Re Current Amend to License,Per Request. Telegram Stating That Licensee Not Source Distributor But Transfer Agent Between Amersham Corp & Client Plant Installations Confirmed.Record of 830712 Telcon Encl)
- ML19257A872 + (Submits Addl Info Re Current Status & Projection of Const Efforts.Limited Portions of Underground Piping & Electrical Duct Banks Continue to Be Installed Along W/Subfoundations of Emergency Svc Water Pump House)
- ML17326A421 + (Submits Addl Info Re Current Status of Four Requirements of NUREG-0578 Concerning Direct Indication of Safety Valve Position,Subcooling Meter,Sys Integrity for High Radioactivity & post-accident Sampling)
- ML17320A300 + (Submits Addl Info Re Cycle 4 Reload & Uprate.Info Incorporates Conclusion Concerning Effects of Uprating on Various Plant Safety Sys,Components & Structures)
- ML19341C908 + (Submits Addl Info Re Cycle 5 Startup W/Five Failed Fuel Assemblies.Util Is Continuing Work W/B&W to Determine Cause of Failed Fuel During Cycle 4 Operation.Util Will Submit Progress Rept within 6 Months)
- ML17326B114 + (Submits Addl Info Re Daily App R Fire Insp Program Per 840314 Request.Procedure Detailing Listed Items Will Be Written)
- NLS8400283, Submits Addl Info Re Debris Strainers & Standby Gas Treatment Sys Use While Purging,Per NRC Request.Evaluation of Effect on Standby Gas Treatment Sys from LOCA Flow Through Isolation Bypass Valve Encl + (Submits Addl Info Re Debris Strainers & Standby Gas Treatment Sys Use While Purging,Per NRC Request.Evaluation of Effect on Standby Gas Treatment Sys from LOCA Flow Through Isolation Bypass Valve Encl)
- ML20106J332 + (Submits Addl Info Re Decommissioning of Facility,Per .Radiation Safety Officer,Deputy & Health Physicist Present During Defueling Process.Integral Neutron Exposures Obtained from Film Badges)
- ML19260C898 + (Submits Addl Info Re Defective Top Cover Gaskets in Namco EA-180 Limit Switches.Determines That No Problem Exists Since Normal Ambient Temp in Reactor Containment Bldg Less than 175 F.Not Deemed Reportable Deficiency)
- ML20041B505 + (Submits Addl Info Re Defects Detected at or Above Top of Tubesheet Resulting from Steam Generator Insp Per 820127 Meeting.Summary of Crevice Indications After Adjustment for Time of First Detection Encl)
- ML19225A805 + (Submits Addl Info Re Degraded Grid Voltage,In Response to NRC 790620 Request.Thirteen Oversized Drawings Available in Central Files)
- ML19209A260 + (Submits Addl Info Re Degraded Grid Voltage,In Response to NRC 790619 Request)
- ML20011A780 + (Submits Addl Info Re Degraded Grid Voltage in Response to NRC 810717 Request.Schedule for Installation of Hardware Necessary to Provide Second Level of Undervoltage Protection Will Be Submitted When Design Is Finalized W/Nrc Approval)
- ML20134C473 + (Submits Addl Info Re Demand)
- ML13308B821 + (Submits Addl Info Re Description of Shift Technical Advisor Training Program & Plans for Requalification Training Per 791031 Request)
- AECM-82-490, Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl + (Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl)
- RBG-30504, Submits Addl Info Re Design Configuration of Roofs Re Drainage of Rain Water Into Gutter Sys,Per 890309 Request. Diesel Generator Bldg Has two-level Roof Arrangement. Radwaste & Auxiliary Bldgs Do Not Have Curbing Along Edges + (Submits Addl Info Re Design Configuration of Roofs Re Drainage of Rain Water Into Gutter Sys,Per 890309 Request. Diesel Generator Bldg Has two-level Roof Arrangement. Radwaste & Auxiliary Bldgs Do Not Have Curbing Along Edges)
- ML19338F772 + (Submits Addl Info Re Design Details of Scram Discharge Header Monitoring Instrumentation in Response to IE Bulletin 80-17 Re Failure of Control Rods to Insert During Scram at BWR)
- ML20087K366 + (Submits Addl Info Re Design of Hydrogen Recombiners Per Section 6.2.5 of Ser.Hydrogen Recombiners Operate in Parallel,Utilizing Same Suction & Exhaust Piping for Each Containment.Diagram Encl)
- ML18018B845 + (Submits Addl Info Re Detailed Control Room Design Review (Dcrdr) in Response to SER Open Item 14,SSER 1 (NUREG-1038) & .Dcrdr Summary Rept Will Be Submitted by 850330. Actions Currently Underway Discussed)
- ML20099H834 + (Submits Addl Info Re Diesel Generator Commitments,Per a Ungaro Request.Until 850426 Delivery of Equipment for Design Mod,Diesel Will Be Accelerated Automatically within 10 Period to Synchronous Speed & Machine Loaded Slowly)
- 3F0688-07, Submits Addl Info Re Diesel Generator Room Air Temp.Lower Efficiency Filters Ordered & Will Be Installed Prior to Completion of Mod.Addl Airflow Through Branch Duct Will Decrease Back Pressure in Main Duct + (Submits Addl Info Re Diesel Generator Room Air Temp.Lower Efficiency Filters Ordered & Will Be Installed Prior to Completion of Mod.Addl Airflow Through Branch Duct Will Decrease Back Pressure in Main Duct)
- ML20116L087 + (Submits Addl Info Re Draft SER Open Item 112 Concerning Groundwater,Including Revs to Groundwater Suppl, Per NRC 850329,0411 & 17 Requests.W/Two Oversize Drawings.Aperture Cards Available in PDR)
- ST-HL-AE-1595, Submits Addl Info Re Draft Ser/Fsar Items Re NUREG-0737, Item II.B.3 on post-accident Sampling Sys.Instrumentation Will Be Calibr Every 6 Months.Frequency May Be Revised Based on Evaluations of Industry Experience + (Submits Addl Info Re Draft Ser/Fsar Items Re NUREG-0737, Item II.B.3 on post-accident Sampling Sys.Instrumentation Will Be Calibr Every 6 Months.Frequency May Be Revised Based on Evaluations of Industry Experience)
- ML20028B555 + (Submits Addl Info Re Draft Technical Evaluation Rept for Control of Heavy Loads,Per 821116 Telcon.Diagram of Load Paths Handled by Reactor Bldg Crane Encl)
- ML20127N516 + (Submits Addl Info Re ECCS Analysis to Supplement Info Submitted on 750709)
- ML17354A244 + (Submits Addl Info Re ECCS Valve Position Per . Plant Change/Mod Package Providing Single Continuous Position Indication for Valves Will Be Prepared. Implementation Schedule for Changes Will Be Provided)
- W3P86-3335, Submits Addl Info Re Effect of Lower Boric Acid Makeup Tank Boron Concentrations on Conclusions in Fsar,Particularly Section 9.3.4 Covering Chemical & Vol Control Sys + (Submits Addl Info Re Effect of Lower Boric Acid Makeup Tank Boron Concentrations on Conclusions in Fsar,Particularly Section 9.3.4 Covering Chemical & Vol Control Sys)
- ML19316A106 + (Submits Addl Info Re Effectiveness of Mgt Control Sys to Suppl 741219 Response to IE Insp Repts 50-269/74-10, 50-270/74-08 & 50-287/74-11)
- ML19296A935 + (Submits Addl Info Re Electric Sys Reliability to Provide Further Basis for Request for Extension Until 800315 to Implement Lessons Learned Task Force short-term Recommendations.Implementation Completed by 800215)
- B10450, Submits Addl Info Re Electrical Protection of Motor Operated Valves,In Response to NRC Evaluations of SEP Topic III-10.A, Thermal Overload Protection for Motors of Motor Operated Valves.Ieee Article Encl + (Submits Addl Info Re Electrical Protection of Motor Operated Valves,In Response to NRC Evaluations of SEP Topic III-10.A, Thermal Overload Protection for Motors of Motor Operated Valves.Ieee Article Encl)
- ML18004B624 + (Submits Addl Info Re Electrical Separation at Facility, Clarifying Sser 4 Concerning Fire Wrap Used as Electrical Separation Barrier.Revised FSAR Page,Clarifying Types of Wraps Used,Encl)
- ML20211C191 + (Submits Addl Info Re Electrical Separation Criteria & Commitments to Reg Guide 1.75,per 860610 Request.Proper Electrical & Physical Separation Exists Between safety- Related & nonsafety-related Equipment)
- ML18022A417 + (Submits Addl Info Re Electrical Separation Verification Testing to Support Compliance W/Reg Guide 1.75,Rev 1.Wyle Test Rept 47879-06 & Revised FSAR Pages,Defining Acceptable Barriers for Installation,Encl.Concurrence Requested)
- ML18022A418 + (Submits Addl Info Re Electrical Separation Verification Testing to Support Compliance W/Reg Guide 1.75,Rev 1.Wyle Test Rept 47879-06 & Revised FSAR Pages,Defining Acceptable Barriers for Installation,Encl.Concurrence Requested)
- 3F0284-19, Submits Addl Info Re Emergency Feedwater Sys Program.Gilbert Assoc Hired to Investigate Emergency Feedwater Turbine Concern.Detailed Rept Will Be Available by 840630 + (Submits Addl Info Re Emergency Feedwater Sys Program.Gilbert Assoc Hired to Investigate Emergency Feedwater Turbine Concern.Detailed Rept Will Be Available by 840630)
- W3P83-4180, Submits Addl Info Re Emergency Feedwater (EFW) Control Sys, Per 831118 Request.Description of Contact States for Priority Close & Priority Open Actuation of EFW Control Valves Encl + (Submits Addl Info Re Emergency Feedwater (EFW) Control Sys, Per 831118 Request.Description of Contact States for Priority Close & Priority Open Actuation of EFW Control Valves Encl)
- 1CAN068202, Submits Addl Info Re Emergency Feedwater Sys Upgrade,Per NUREG-0737,Items II.E.1.1 & II.E.1.2.Equipment Scheduled for Installation During Refueling Outage Listed + (Submits Addl Info Re Emergency Feedwater Sys Upgrade,Per NUREG-0737,Items II.E.1.1 & II.E.1.2.Equipment Scheduled for Installation During Refueling Outage Listed)
- 2CAN028206, Submits Addl Info Re Emergency Feedwater Sys in Response to NRC .Requested Change to Tech Specs Includes Mods to Steam Driven Emergency Feedwater Pump Surveillance Requirements.Change Will Be Finalized by 820421 + (Submits Addl Info Re Emergency Feedwater Sys in Response to NRC .Requested Change to Tech Specs Includes Mods to Steam Driven Emergency Feedwater Pump Surveillance Requirements.Change Will Be Finalized by 820421)