Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML042790512 + (Sport Fishing Index (Sfi) - a Method to Quantify Sport Fishing Quality)
- ML13210A224 + (Spot Check for Susquehanna Steam Electric Station Unit 1 Allegheny Electric Cooperative, Inc)
- ML13210A231 + (Spot Check for Susquehanna Steam Electric Station Unit 1, PPL, Susquehanna, LLC)
- ML13210A226 + (Spot Check for Susquehanna Steam Electric Station, Unit 2 PPL Susquehanna, LLC)
- ML20058E428 + (Spray Additive Elimination Analysis for South Texas Project)
- ML20154L699 + (Spray Additive Tank Deletion Analysis for San Onofre Nuclear Generating Station Units 2 & 3)
- ML060270318 + (Spray Pond Additive for Antimicrobial Control)
- ML20262H710 + (Spray Pond Area Foundation Plan for Pipe Supports)
- ML093290070 + (Spray Pond Chemical Additive Request NPDES Permit No. PA 0051926)
- ML042390457 + (Spray Pond Dredging)
- Regulatory Guide 1.72 + (Spray Pond Piping Made from Fiberglass-Reinforced Thermosetting Resin)
- ML20260J589 + (Spray Pond:Finish Grades)
- ML20260J598 + (Spray Pond:Plan & Details of Liner in Spray Bank Area)
- ML20260J551 + (Spray Pond:Plan of Liner Svc Road & Trenches for Piping)
- ML20260J576 + (Spray Pond:Sections & Details)
- ML042790373 + (Spreadsheet - BFN Circulating Cooling Water Flows)
- ML042790378 + (Spreadsheet - BFN Groundwater Elevations/Well Level Data)
- ML042790374 + (Spreadsheet - BFN Heat Rejection)
- ML042790380 + (Spreadsheet - BFN Well Physical Description)
- ML062860432 + (Spreadsheet File of Instructions, Materials Conversions, Results Table, Releases by Material, & Precipitate by Material, Reports)
- LIC-06-0116, Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables + (Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables)
- ML19253A380 + (Spring 1979 Quarterly Rept, for Apr-June 1978)
- ML20010G125 + (Spring 1981 Quarterly Rept,Bailly Nuclear-1 Site Encompassing Apr-June 1981)
- ML17227A609 + (Spring 1992 Refueling Outage ISI Rept)
- ML20072D450 + (Spring 1994 Inservice Exam of Selected Class 1,2 & 3 Components at Calvert Cliffs Nuclear Power Plant,Unit 1, Final Rept)
- NRC 2005-0085, Spring 2004 Unit 2 (U2R27) Steam Generator Examination Report + (Spring 2004 Unit 2 (U2R27) Steam Generator Examination Report)
- NRC 2007-0083, Spring 2007 Unit 1 (U1R30) Steam Generator Tube Inspection Report + (Spring 2007 Unit 1 (U1R30) Steam Generator Tube Inspection Report)
- ML081490152 + (Spring 2008 Refueling Outage Steam Generator Tube Inspections)
- NRC 2008-0045, Spring 2008 Unit 2 (U2R29), Steam Generator Tube Inspection Report + (Spring 2008 Unit 2 (U2R29), Steam Generator Tube Inspection Report)
- ML092360407 + (Spring 2009 - 180 Day Steam Generator Report - Engineering Information Record)
- ML111822717 + (Spring 2011 - 180 Day Steam Generator Report)
- ML11208C216 + (Spring 2011 Refueling Outage Steam Generator Tube Inservice Inspection Conference Call Summary)
- ML12221A225 + (Spring 2012 - 180 Day Steam Generator Report)
- NRC 2013-0067, Spring 2013 Unit 1(U1R34) Steam Generator Tube Inspection Report + (Spring 2013 Unit 1(U1R34) Steam Generator Tube Inspection Report)
- ML15124A775 + (Spring 2014 Steam Generator Tube Inspection Report, Unit 1)
- ML15314A079 + (Spring 2015 - 180 Day Steam Generator Report)
- ML15239A292 + (Spring 2015 - 180 Day Steam Generator Report)
- ML16243A478 + (Spring 2016 - 180 Day Steam Generator Report)
- NRC 2016-0044, Spring 2016 U1R36 180-Day Steam Generator Tube Inspection Report + (Spring 2016 U1R36 180-Day Steam Generator Tube Inspection Report)
- NRC 2017-0046, Spring 2017 (U2R35) Steam Generator Tube Inspection Report + (Spring 2017 (U2R35) Steam Generator Tube Inspection Report)
- ML19200A029 + (Spring 2019 - 180 Day Steam Generator Report)
- EPID:L-2019-LRO-0061 + (Spring 2019 - 180 Day Steam Generator Report)
- ML22119A171 + (Spring 2019 Outage Steam Generator Tube Inspection Report - Correction of Administrative Error)
- NRC 2019-0038, Spring 2019 Unit 1 (U1 R38) Steam Generator Tube Inspection Report + (Spring 2019 Unit 1 (U1 R38) Steam Generator Tube Inspection Report)
- ML20314A164 + (Spring 2020 180-Day Steam Generator Report (EPID-L-2020-LRO-0049))
- ML20080M857 + (Spring 2020 Gimics Report Enclosure)
- ML20080M859 + (Spring 2020 Gimics Report Memo)
- ML21083A279 + (Spring 2021 Generic Issue Management Control System (Gimcs) Report Enclosure)
- ML21083A280 + (Spring 2021 Gimcs Report Memo)
- ML22038A220 + (Spring 2022 Gimcs Summary Status of Active Generic Issues Report Enclosure)
- ML22089A146 + (Spring 2022 Gimcs Summary Status of Active Generic Issues Report Enclosure 2)