Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051300346 + (Special Report 2-SR-2005-001)
- ML053040067 + (Special Report 2-SR-2005-002, Boron Deposit at Control Element Drive Mechanism Vent)
- ML053040064 + (Special Report 2-SR-2005-003-00)
- ML093240131 + (Special Report 2-SR-2009-001-00)
- ML18306A762 + (Special Report 2-SR-2018-001-00 for Palo Verde Nuclear Generating Station (Pvngs), Unit 2, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional)
- ULNRC-04595, Special Report 2001-02 for Callaway Plant Unit 1 Re Results of the Twelfth Steam Generator Tube In-Service Inspection + (Special Report 2001-02 for Callaway Plant Unit 1 Re Results of the Twelfth Steam Generator Tube In-Service Inspection)
- ML021860205 + (Special Report 2002-001. Digital Metal Impact Monitor System Has One Channel Which Has Been Inoperable in Excess of 30 Days)
- ML030080299 + (Special Report 2002-002)
- ULNRC-04649, Special Report 2002-002 Re Primary Meteorological Tower 10 & 60 Meter Wind Speed Indications Inaccurate Due to Electrical Interference + (Special Report 2002-002 Re Primary Meteorological Tower 10 & 60 Meter Wind Speed Indications Inaccurate Due to Electrical Interference)
- ML020850603 + (Special Report 2002-01 GT-RT-21B Radiation Monitor Inoperable)
- ULNRC-04778, Special Report 2002-04 Inservice Inspection Results for Steam Generator Tube Inspections - Number of Tubes Plugged or Repaired + (Special Report 2002-04 Inservice Inspection Results for Steam Generator Tube Inspections - Number of Tubes Plugged or Repaired)
- WO 03-0024, Special Report 2003-001 for Wolf Creek Re Unavailability of Post Accident Monitoring Equipment + (Special Report 2003-001 for Wolf Creek Re Unavailability of Post Accident Monitoring Equipment)
- GNRO-2003/00063, Special Report 2003-001, Invalid Actuation of High Pressure Core Spray (HPCS) + (Special Report 2003-001, Invalid Actuation of High Pressure Core Spray (HPCS))
- ML031760544 + (Special Report 2003-01 Regarding RMG-18, Reactor Building High Range General Area Radiation Monitor (Channel a) Being Declared Inoperable Due to Intermittent Spiking During the Electronic Source Check on May 16, 2003)
- ML031490492 + (Special Report 2003-01 from McGuire, Unit 2 Regarding Groundwater Level Monitoring System, Problem Investigation Process Number M-03-01377)
- WO 04-0056, Special Report 2004-001 Re Inoperability of the a Train of Reactor Vessel Level Indicating System for Greater than 30 Days + (Special Report 2004-001 Re Inoperability of the a Train of Reactor Vessel Level Indicating System for Greater than 30 Days)
- RC-04-0171, Special Report 2004-002 + (Special Report 2004-002)
- ML041480149 + (Special Report 2004-1 for University of California, Davis Mcclellan Nuclear Radiation Ctr Regarding Missed Surveillance Requirement)
- RC-05-0099, Special Report 2005-001 + (Special Report 2005-001)
- GNRO-2008/00052, Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System + (Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System)
- NL-08-0659, Special Report 2008-001-00, Inoperable Radiation Monitor R-29B + (Special Report 2008-001-00, Inoperable Radiation Monitor R-29B)
- NL-08-0756, Special Report 2008-002-00, Inoperable Radiation Monitor R-60B + (Special Report 2008-002-00, Inoperable Radiation Monitor R-60B)
- RC-10-0074, Special Report 2010-001, Steam Generator Tube Report for RF18 + (Special Report 2010-001, Steam Generator Tube Report for RF18)
- NL-10-1536, Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-006 + (Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-006)
- NL-10-0195, Special Report 2010-001-00, Inoperable Radiation Monitor R-60A + (Special Report 2010-001-00, Inoperable Radiation Monitor R-60A)
- NL-10-0308, Special Report 2010-002-00 Re Inoperable Radiation Monitor R-15C + (Special Report 2010-002-00 Re Inoperable Radiation Monitor R-15C)
- NL-11-0626, Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-006 + (Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-006)
- NL-11-0853, Special Report 2011-001-01, Inoperable Radiation Monitor 1 RE-0006 + (Special Report 2011-001-01, Inoperable Radiation Monitor 1 RE-0006)
- NL-12-0324, Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-0006 + (Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-0006)
- ULNRC-05824, Special Report 2011-01 for Callway, Unit 1 Regarding Inoperability of a Seismic Instrument for Greater than 30 Days + (Special Report 2011-01 for Callway, Unit 1 Regarding Inoperability of a Seismic Instrument for Greater than 30 Days)
- ML12188A542 + (Special Report 2012-001)
- ULNRC-05895, Special Report 2012-01 - Inoperability of Post Accident Monitoring (PAM) Instrument for Greater than 30 Days + (Special Report 2012-01 - Inoperability of Post Accident Monitoring (PAM) Instrument for Greater than 30 Days)
- ML13009A329 + (Special Report 2012-01 Per Technical Specification 5.6.6, Problem Investigation Process No.: O-12-13808)
- ULNRC-05932, Special Report 2012-02 - Pam Report: Inoperability of a Post Accident Monitoring (PAM) Instrument for Greater than 30 Days + (Special Report 2012-02 - Pam Report: Inoperability of a Post Accident Monitoring (PAM) Instrument for Greater than 30 Days)
- NL-13-2090, Special Report 2013-002-00. Nonfunctional Radiation Monitor R-60C + (Special Report 2013-002-00. Nonfunctional Radiation Monitor R-60C)
- ULNRC-06002, Special Report 2013-02: Inoperability of a Seismic Instrument for Greater than 30 Days + (Special Report 2013-02: Inoperability of a Seismic Instrument for Greater than 30 Days)
- RC-14-0085, Special Report 2014-002 for V.C. Summer, Degraded Conditions Lasting Longer than Seven Days + (Special Report 2014-002 for V.C. Summer, Degraded Conditions Lasting Longer than Seven Days)
- RC-14-0084, Special Report 2014-003 for V.C. Summer, One or More Required Meteorological Monitoring Channels Being Inoperable for More than Seven (7) Days + (Special Report 2014-003 for V.C. Summer, One or More Required Meteorological Monitoring Channels Being Inoperable for More than Seven (7) Days)
- ULNRC-06139, Special Report 2014-01 - PAM Report Inoperability of a Post Accident Monitoring (PAM) Instrument + (Special Report 2014-01 - PAM Report Inoperability of a Post Accident Monitoring (PAM) Instrument)
- ULNRC-06151, Special Report 2014-03: Inoperability of a Seismic Instrument for Greater than 30 Days + (Special Report 2014-03: Inoperability of a Seismic Instrument for Greater than 30 Days)
- ULNRC-06157, Special Report 2014-04: Inoperability of a Seismic Instrument for Greater than 30 Days + (Special Report 2014-04: Inoperability of a Seismic Instrument for Greater than 30 Days)
- ULNRC-06162, Special Report 2014-05 Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Day + (Special Report 2014-05 Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Day)
- NL-15-0080, Special Report 2015-001-00 + (Special Report 2015-001-00)
- NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C + (Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C)
- RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability + (Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability)
- NL-16-0945, Special Report 2016-003-00, Nonfunctional Radiation Monitor R-60A + (Special Report 2016-003-00, Nonfunctional Radiation Monitor R-60A)
- ULNRC-06304, Special Report 2016-01: Inoperability of a Seismic Instrument for Greater than 30 Days + (Special Report 2016-01: Inoperability of a Seismic Instrument for Greater than 30 Days)
- ULNRC-06306, Special Report 2016-02, Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Days + (Special Report 2016-02, Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Days)
- ULNRC-06309, Special Report 2016-03: Inoperability of a Seismic Instrument for Greater than 30 Days + (Special Report 2016-03: Inoperability of a Seismic Instrument for Greater than 30 Days)
- NL-17-0539, Special Report 2017-001-00, Nonfunctional Radiation Monitor R-60D + (Special Report 2017-001-00, Nonfunctional Radiation Monitor R-60D)
- NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B + (Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B)