Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151V699 + (Snoc Jm Farley Nuclear Plant Startup Test Rept Unit 2 Cycle 13. with)
- ML20054A649 + (Snow Loads for the Design of Nuclear Power Plant Structures)
- ML20210J167 + (Snp Unit 1 Cycle 8 Refueling Outage Mar-Apr 1997,Results of SG Tube ISI as Required by TS Section 4.4.5.5.b & Results of Alternate Plugging Criteria Implementation as Required by Commitment from TS License Condition 2C(9)(d))
- ML20199J244 + (Snp Unit 2 Cycle Refueling Outage Oct 1997)
- ML20077M783 + (Snps Annual Man-Rem Rept)
- ML20128P645 + (Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31))
- 05000255/LER-1982-015-03, Snubber 17 (Main Steam Line Upstream of Atmospheric Dump Valve CV-0780) Contained Insufficient Oil.Caused by Deteriorated O-rings.Snubber Replaced & Will Be Rebuilt on 5-yr Cycle + (Snubber 17 (Main Steam Line Upstream of Atmospheric Dump Valve CV-0780) Contained Insufficient Oil.Caused by Deteriorated O-rings.Snubber Replaced & Will Be Rebuilt on 5-yr Cycle)
- ML20261A873 + (Snubber Assembly 50 Kip. Sheet 17.No Rev Date.Drawing Consists of Three Aperture Cards)
- ML20261A877 + (Snubber Assembly 70 Kip. Sheet 19.No Rev Date.Drawing Consists of Three Aperture Cards)
- ML20261A881 + (Snubber Assembly 70 Kip. Sheet 20.No Rev Date.Drawing Consists of Two Aperture Cards)
- ML20155E847 + (Snubber Augmented Inservice Insp/Exam & Functional Testing Program for Perry Nuclear Power Plant,Unit 1)
- ML20126A067 + (Snubber Elimination at McGuire Nuclear Station Using Limit Stops, Interim Rept)
- RBG-47921, Snubber Examination, Testing, and Service Life Monitoring Program Plan for Fourth Inservice Testing Interval + (Snubber Examination, Testing, and Service Life Monitoring Program Plan for Fourth Inservice Testing Interval)
- NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code + (Snubber Inspection Plan Submittal in Accordance with ASME OM Code)
- ML20263P584 + (Snubber Lever Assy & Details)
- ML20263P582 + (Snubber Lever Casting Details)
- Information Notice 1994-48, Snubber Lubricant Degradation in High-Temperature Environments + (Snubber Lubricant Degradation in High-Temperature Environments)
- 05000219/FIN-2010005-01 + (Snubber Maintenance History Not Taken Into Account When Conducting Service Life Reviews)
- ML16250A549 + (Snubber Program Document - 4th Interval - Basis for Snubber Program)
- ML13294A023 + (Snubber Program Plan)
- HNP-17-040, Snubber Program Plan + (Snubber Program Plan)
- HNP-14-112, Snubber Program Plan + (Snubber Program Plan)
- RA-22-0079, Snubber Program Plan + (Snubber Program Plan)
- RA-24-0185, Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-1618 + (Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-1618)
- RA-24-0244, Snubber Program Plan Revision, AD-EG-ONS-1618, Oconee Nuclear Station Snubber Program Plan + (Snubber Program Plan Revision, AD-EG-ONS-1618, Oconee Nuclear Station Snubber Program Plan)
- L-2024-133, Snubber Program Plan Submittal + (Snubber Program Plan Submittal)
- L-2018-042, Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval + (Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval)
- BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program + (Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program)
- RA-19-0383, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program + (Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program)
- LR-N13-0257, Snubber Program Plan for Salem Unit 2, Fourth Ten-Year Interval + (Snubber Program Plan for Salem Unit 2, Fourth Ten-Year Interval)
- NL-19-0347, Snubber Program Plan for the Fifth Ten Year Inservice Testing Interval + (Snubber Program Plan for the Fifth Ten Year Inservice Testing Interval)
- ND-16-1437, Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval + (Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval)
- NL-17-1646, Snubber Program Plan for the Fourth Ten Year Inservice Testing Interval + (Snubber Program Plan for the Fourth Ten Year Inservice Testing Interval)
- PLA-7179, Snubber Program Plan for the Fourth Ten-Year Inservice Inspection Interval, PLA-7179 + (Snubber Program Plan for the Fourth Ten-Year Inservice Inspection Interval, PLA-7179)
- MNS-17-033, Snubber Program Plan for the Fourth Ten-Year Inservice Testing (IST) Interval + (Snubber Program Plan for the Fourth Ten-Year Inservice Testing (IST) Interval)
- CNS-16-042, Snubber Program Plan for the Fourth Ten-Year Inservice Testing Interval + (Snubber Program Plan for the Fourth Ten-Year Inservice Testing Interval)
- GO2-15-166, Snubber Program Plan for the Fourth Ten-Year Inservice Testing Interval + (Snubber Program Plan for the Fourth Ten-Year Inservice Testing Interval)
- LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030 + (Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030)
- ML110320646 + (Snubber Program Relief Request RR-SNUB-1 - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2)
- ML21341A552 + (Snubber Program for the Fourth 10-Year Testing Interval)
- NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval + (Snubber Program for the Fourth 10-Year Testing Interval)
- ML20155F454 + (Snubber Reduction Program for Nuclear Piping Sys,Lasalle County Nuclear Station Units 1 & 2)
- ML022050194 + (Snubber Relief Request)
- ML20084J231 + (Snubber Repair Activities During Spring 1973 Refueling Outage, Summary Rept)
- ML20084G663 + (Snubber Rept Response to NRC Insp Repts 50-280/83-32 & 50-281/83-33)
- 05000346/LER-1983-051-03, Snubber SR-4-R-3 Found W/Oil in Reservoir.Caused by Cracked O-ring in Fluid Reservoir.Snubber Replaced W/Spare.Insp Interval Reduced from 18 to 12 Months + (Snubber SR-4-R-3 Found W/Oil in Reservoir.Caused by Cracked O-ring in Fluid Reservoir.Snubber Replaced W/Spare.Insp Interval Reduced from 18 to 12 Months)
- ML19256A249 + (Snubber Sensitivity Study. Analysis Sensitivity of Mech & Hydraulic Snubber Parameters to Sys Displacements,Stresses & Forces & Acceptable Parameter Ranges Are Established)
- ML20009D348 + (Snubber Sensitivity Study.Final Report)
- 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval + (Snubber Testing Program for Fifth Inservice Test Interval)
- 2CAN110904, Snubber Testing Program for Fourth Inspection Interval + (Snubber Testing Program for Fourth Inspection Interval)
- 1CAN050805, Snubber Testing Program for Fourth Inspection Interval + (Snubber Testing Program for Fourth Inspection Interval)