| Q | CCA | Title |
---|
05000219/FIN-2010002-01 | 2010Q1 | P.6 P.3(c) | Adjustments to Maintenance Rule System Performance Criteria not made after Biannual Evaluation |
05000219/FIN-2010002-02 | 2010Q1 | H.13 | Failure to Declare the Rod Worth Minimizer Inoperable At the Time Operability Criteria Was Not Met and Enter The Correct Technical Specification Action Statement |
05000219/FIN-2010402-01 | 2010Q1 | | Security |
05000219/FIN-2010003-03 | 2010Q3 | H.14 | Failure to Notify the NRC within the Time Requirements of 10 CFR 50.72 |
05000219/FIN-2010003-04 | 2010Q3 | H.14 | Core Spray ASME Code Compliance Issues |
05000219/FIN-2010008-02 | 2010Q3 | H.6 | EDG Low Voltage Control Cable Submergence |
05000219/FIN-2010008-03 | 2010Q3 | | 1A2 and 1B2 480 V Load Center Transformer Cooling Fan Testing |
05000219/FIN-2010008-04 | 2010Q3 | P.1 | Core Spray System I Pump Room Degraded Ball Float Drain Valve |
05000219/FIN-2010008-01 | 2010Q3 | H.8 | Scaffold Installation Procedure Not Properly Implemented |
05000219/FIN-2010007-01 | 2010Q3 | P.2 | Inadequate Corrective Actions Associated With the Reactor Building to Torus Vacuum Breaker Trip Valve Failures |
05000219/FIN-2010007-02 | 2010Q3 | H.8 | Failure to Follow Preventative Maintenance Procedure Leading to Incomplete Fire Diesel Maintenance |
05000219/FIN-2010003-01 | 2010Q3 | H.4 H.5 | Preconditioning of Isolation Condenser Valves Prior to ASME In-service Test |
05000219/FIN-2010003-02 | 2010Q3 | P.3 | Failure to Provide Adequate Compensatory Actions for the RAGEMS Being Out Of Service |
05000219/FIN-2010005-02 | 2010Q4 | H.7 | Failure to Conduct Representative Sampling of Stack Efffluents |
05000219/FIN-2010005-03 | 2010Q4 | H.8 | Failure to Implement Procedures Resulting in Reactor Scram |
05000219/FIN-2010005-01 | 2010Q4 | P.2 | Snubber Maintenance History Not Taken Into Account When Conducting Service Life Reviews |