Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063N444 + (Seismic Safety Margins Research Program:Progress Report No. 13)
- ML20128F354 + (Seismic Safety Research Program Plan)
- ML20215J005 + (Seismic Safety Research Program Plan)
- 05000265/FIN-2014003-01 + (Seismic Scaffold in Contact with Safety-Related Equipment)
- ML20211M900 + (Seismic Screening Criteria for Assessing Potential Fuel Pool Vulnerabilities at Decommissioning Plants)
- ML14111A147 + (Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights)
- ML17320A581 + (Seismic Simulation & Radiation Test Program on Seven Pressure Switches)
- ML17318A509 + (Seismic Simulation & Radiation Test Program on Seven Pressure Switches)
- ML20063E273 + (Seismic Simulation Test Program on Anticipatory Reactor Trip Sys (Arts))
- ML19255H685 + (Seismic Simulation Test Program on Efco 600 Actuator)
- ML19255H681 + (Seismic Simulation Test Program on Efco 600 Actuator Logic Cabinet)
- ML20205E481 + (Seismic Simulation Test Program on Electrical Isolation Mounting Sys of Typical Electrical Encl)
- ML20039F796 + (Seismic Simulation Test Program on Six Model W-1251 Meters)
- ML20072L360 + (Seismic Simulation Test Rept)
- A181525, Seismic Snubber Lug Info + (Seismic Snubber Lug Info)
- ML20010J169 + (Seismic Soil-Structure Interaction Analysis of Nuclear Power Plants)
- RIS 2015-13, Seismic Stability Analysis Methodologies for Spent Fuel Dry Cask Loading Stack-up Configuration + (Seismic Stability Analysis Methodologies for Spent Fuel Dry Cask Loading Stack-up Configuration)
- 05000440/FIN-2010005-05 + (Seismic Stability of Standby Liquid Control Test Tank)
- ML18051A283 + (Seismic Structural - Integrity Evaluation of Selected Electrical Equipment at Palisades Nuclear Power Plant, Rev 1)
- ML17255A605 + (Seismic Structural Evaluation of Main Control Board)
- ML20032D495 + (Seismic Structural Fragility Investigation for Zion Nuclear Power Plant.Seismic Safety Margins Research Program (Phase 1))
- ML16050A178 + (Seismic Study Meeting San Luis Obispo County)
- ML15195A534 + (Seismic Study Update Letter for July 2015 - Status Report)
- ML15132A694 + (Seismic Study Update Letter for May 2015)
- ML14252A910 + (Seismic Study Update Letter for September 2014)
- ML17311A447 + (Seismic Study of Bldg)
- ML19249A568 + (Seismic Study of Pacific Northwest Region of Us, Nov 1961-Aug 1965)
- ML20092N663 + (Seismic Survivability Study for MP-45 Diesel Generators)
- ML19274D195 + (Seismic Test Procedure for Diablo Canyon 125 Volts DC Switchgear Distribution Panel Mold Case Circuit Breakers. Reviews Mounting Methods Employed During Seismic Testing of Safety Related Electrical Equipment)
- ML20071D629 + (Seismic Test Program Performed on One CPC 1 & One CPC 2)
- 05000272/LER-2078-022-01, Seismic Test Results for NEMA 12 Enclosures + (Seismic Test Results for NEMA 12 Enclosures)
- ML20049J553 + (Seismic Test SMB-000-2/H1BC & SMB-000-5/H3BC Test Rept B0084)
- ML18018A813 + (Seismic Test SMB-000/HOBC)
- ML20062J354 + (Seismic Test of Diesel Generator Control Console:Xal 71696 - SD 3025)
- ML20205M825 + (Seismic Testing of Two Reactor Mode Switch Assemblies Part 163C1487G001 for Ge. Milam Work Records & Related Documentation Encl)
- ML20209J361 + (Seismic Testing of Typical Containment Piping Penetration Systems)
- ML033440194 + (Seismic Tremor Felt at North Anna Power Station)
- ML20266E311 + (Seismic Tube Support Span Lengths. Rev Date Incomplete)
- ML17261A831 + (Seismic Upgrading Program:Auxiliary Structures Seismic Analysis)
- ML20050C958 + (Seismic Vibration Test Program Performed on One Solenoid Valve V70900-301,Revision G,Serial 1)
- ML20073N917 + (Seismic Vibration Testing of One Hydrogen Analyzer Assembly, Test Procedure)
- ML20049J555 + (Seismic Vibration Testings of Two Limitorque Actuators for Limitorque Corp)
- ML18086A837 + (Seismic Vibration of (1)10 Inch,(1)20 Inch & (1)36 Inch Butterfly Valves for Masoneilan Intl,Inc)
- ML13130A045 + (Seismic Walkdown Audit Plan)
- ML12349A285 + (Seismic Walkdown Checklist, 1A1 Diesel Engine - Page C-150 - Page C-243)
- RS-13-097, Seismic Walkdown Checklists + (Seismic Walkdown Checklists)
- ML12349A288 + (Seismic Walkdown Checklists, 11 Containment Spray Pump - Page C-435 - Page C-504)
- ML12349A287 + (Seismic Walkdown Checklists, Engineering Safeguards Control - Page C-340 - Page C-434)
- ML12349A290 + (Seismic Walkdown Checklists, Salt Wtr Emerg Out, Page C-505 - Page C-572)
- ML12347A252 + (Seismic Walkdown Information Request for Information Pursuant to Title 10 of Code of Federal Regulations Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident 3/12/12)
- ML12328A112 + (Seismic Walkdown Report)