Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML031140480 + (Revision to Emergency Plan-Position Specific Procedure EP-PS-355, Media/Public Officials Contact)
- NL-15-0820, Revision to Emergency Plans + (Revision to Emergency Plans)
- ML17353A216 + (Revision to Emergency Preparedness Emergency Plan Implementing Procedure, IPEC-EP 17-02, Rev. 21)
- L-13-335, Revision to Emergency Preparedness Plan + (Revision to Emergency Preparedness Plan)
- L-2003-194, Revision to End of Cycle 18 Steam Generator Tube Plugging Report (L-2003-194) + (Revision to End of Cycle 18 Steam Generator Tube Plugging Report (L-2003-194))
- ML071210254 + (Revision to Entergy Response to NRC Request for Additional Information Related to Repair of the Core Shroud Stabilizer Assemblies)
- JAFP-17-0029, Revision to Entergys Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights. + (Revision to Entergys Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights.)
- CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 + (Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4)
- ML20003E778 + (Revision to Ets,App B,Allowing Discontinuance of Limit for Rate of Temp Change at Mixing Zone Boundary,Per Spec 2.1.5/3.1.5)
- RS-11-103, Revision to Exelon Fitness for Duty Performance Data Reports — Annual 2010 + (Revision to Exelon Fitness for Duty Performance Data Reports — Annual 2010)
- RS-16-214, Revision to Exelon Generation Company, LLC Fleet Commitment Relating to Maintaining Severe Accident Management Guidelines + (Revision to Exelon Generation Company, LLC Fleet Commitment Relating to Maintaining Severe Accident Management Guidelines)
- RS-16-209, Revision to Exelon Generation Company, LLC Fleet Commitment Relating to Maintaining Severe Accident Management Guidelines + (Revision to Exelon Generation Company, LLC Fleet Commitment Relating to Maintaining Severe Accident Management Guidelines)
- RS-03-061, Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure + (Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure)
- ML030930220 + (Revision to Exelon Nuclear Standardized Emergency Plan Procedures, Attachment D)
- ML25251A127 + (Revision to Exemption Request from 10 CFR 50.33(f) and 10 CFR 50 Appendix C Financial Qualification Documentation Requirements and Revision to the General and Financial Information of the Kemmerer Power Station, Unit 1, Construction Permit)
- ML11147A159 + (Revision to Expected Submittal Dates of License Renewal Applications)
- BYRON 2005-0053, Revision to Expected Supplemental Report Submittal Date for Licensee Event Report (LER) 454-2004-001-00, Reactor Containment Fan Coolers Flow Rates Below Technical Specification Requirements Due to Inaccurate Flow Indication + (Revision to Expected Supplemental Report Submittal Date for Licensee Event Report (LER) 454-2004-001-00, Reactor Containment Fan Coolers Flow Rates Below Technical Specification Requirements Due to Inaccurate Flow Indication)
- L-2011-466, Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification 5.6, Design Features - Fuel Storage - Criticality + (Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification 5.6, Design Features - Fuel Storage - Criticality)
- L-2011-409, Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification Regarding Fuel Loading Curve and Areal Density Criteria for Metamic Inserts + (Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification Regarding Fuel Loading Curve and Areal Density Criteria for Metamic Inserts)
- ML20053C617 + (Revision to Final Deficiency Rept Re Structural Steel Connections,Originally Reported on 811117.AE Responses to NRC Questions Received But Further Analysis & Clarification Required.Requested Info Will Be Provided by 820723)
- NG-11-0159, Revision to Fitness for Duty Performance Data + (Revision to Fitness for Duty Performance Data)
- NLS2016049, Revision to Flood Hazard Reevaluation Report + (Revision to Flood Hazard Reevaluation Report)
- BVY 14-011, Revision to Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima . + (Revision to Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima .)
- ML11362A394 + (Revision to Follow-Up Letter to 10 CFR 50.9, Completeness and Accuracy of Information, Notification)
- BSEP 08-0034, Revision to Fourth 10-Year Interval Inservice Testing (IST) Program Update Submittal + (Revision to Fourth 10-Year Interval Inservice Testing (IST) Program Update Submittal)
- ML19268A676 + (Revision to Fundamental Nuclear Material Control Plan)
- 0CAN110403, Revision to General Design Criterion 57 Exemption Request, Arkansas Nuclear One, Units 1 & 2 + (Revision to General Design Criterion 57 Exemption Request, Arkansas Nuclear One, Units 1 & 2)
- ML081130739 + (Revision to Generic Letter 2004-02 Response)
- ML071270372 + (Revision to Generic Letter 2004-02 Response)
- BVY 14-080, Revision to Generic Letter 89-13 Commitment Relative to Periodic Testing of ECCS Room Coolers (RRU-7 and RRU-8) + (Revision to Generic Letter 89-13 Commitment Relative to Periodic Testing of ECCS Room Coolers (RRU-7 and RRU-8))
- NG-18-0099, Revision to Generic Schedule Provided in NEI 13-12, Open Phase Condition Industry Guidance Document + (Revision to Generic Schedule Provided in NEI 13-12, Open Phase Condition Industry Guidance Document)
- ML052020360 + (Revision to Guidance Formerly Contained in NRC Generic Letter 91-18, a Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability)
- CY-05-167, Revision to Haddam Neck Plant Decommissioning Updated Final Safety Analysis Report + (Revision to Haddam Neck Plant Decommissioning Updated Final Safety Analysis Report)
- ML22033A348 + (Revision to Holtec Decommissioning International, LLC (HDI Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and 10 CFR Part 50, Appendix E for Indian Point Unit Nos. 1, 2, and 3)
- ML22035A121 + (Revision to Holtec Decommissioning International, LLC, License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition)
- ML20157A185 + (Revision to IPEC Emergency Plan)
- ML18264A013 + (Revision to IPEC Emergency Plan Procedure)
- ML18331A259 + (Revision to IPEC Emergency Plan Procedure)
- ML18026A628 + (Revision to IPEC Emergency Plan Procedures)
- TSTF-07-11, Revision to Implementation Guidance for TSTF-423, Technical Specifications End States, NEDC-32988-A + (Revision to Implementation Guidance for TSTF-423, Technical Specifications End States, NEDC-32988-A)
- ML13099A416 + (Revision to Implementation Period for Amendment No. 172)
- ML023190064 + (Revision to Improved Technical Specifications Manual Bases Unit 1)
- 3F1209-09, Revision to Industrial Wastewater Permit FL0000159 + (Revision to Industrial Wastewater Permit FL0000159)
- L-PI-10-051, Revision to Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006 Fuel Cycle 23: 11-23-2004 to 06-06-2006 and Revision to 2008 Unit 1 180-Day Steam Generator Tube Inspection Report + (Revision to Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006 Fuel Cycle 23: 11-23-2004 to 06-06-2006 and Revision to 2008 Unit 1 180-Day Steam Generator Tube Inspection Report)
- ML023100271 + (Revision to Inservice Test Program Relief Request PR-1)
- ML032731415 + (Revision to Inservice Test Program Relief Request PR-3)
- RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements + (Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements)
- ML021220437 + (Revision to Inservice Testing Program Relief Request VR-3 and VR-4)
- NLS2019036, Revision to Integrated Assessment for External Flooding Cooper Nuclear Station + (Revision to Integrated Assessment for External Flooding Cooper Nuclear Station)
- EPID:L-2018-JLD-0177 + (Revision to Integrated Assessment for External Flooding Cooper Nuclear Station)