ML031140480

From kanterella
Jump to navigation Jump to search
Revision to Emergency Plan-Position Specific Procedure EP-PS-355, Media/Public Officials Contact
ML031140480
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/17/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031140480 (5)


Text

r- Apr. 17, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-19901 USER INFORMATION:

GERL SE M EMPL#:28401 CA#: 0363 Addres UCSA2 Phon  : 25 3194 TRANSMITTAL INFORMATION:

TO: SEnD4LnROSE 1 04/17/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER

'NUCSA-2)

QJHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

355 - 355 - MEDIA/PUBLIC OFFICIALS CONTACT:

EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 02/26/2003 ADD MANUAL TABLE OF CONTENTS DATE: 04/16/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-355 REPLACE: REV:ll REPLACE: REV:ll REMOVE: PCAF 2001-1176 REV: N/A ADD: PCAF 2001-1176 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

.,X, 013

( ( (

Tab 2 EP-PS-355-2 EMERGENCY ORGANIZATION CONTROL ROOM EMERGENCY DIRECTOR (SHIFT MANAGER) l EMERGENCY PLAN SHIFT TECHNICAL OPERATORS COMMUNICATOR ADVISOR (STA)

EP-AD-000-406, Revision 15, Page 1 of 3

(v ( (

Tab 2 EP-PS-355-2 TSC ORGANIZATION

  • EMERGENCY I

DIRECTOR

  • Operations Coordinator
  • Denotes minimum staffing.

Rev. 41, 03/03 .

Susquehanna Steam Electric Station Units I and 2 Emergency Plan TSC ORGANIZATION FIGURE 6 2 EP-AD-000-406, Revision 15, Page 2 of 3

Tab 2 EP-PS-355-2 EOF ORGANIZATION

EP-AD-000-406, Revision 15, Page 3 of 3

9 Tab Tab 9 EP-PS-355-9 PREVIOUS EMERGENCY DECLARATIONS AT SUSQUEHANNA DATE CLASSIFICATION DESCRIPTION 09/22/82 ALERT A small electrical fire in the ESW pump house on the plant site.

The fire was out within 10 minutes. The emergency was downgraded to UNUSUAL EVENT an hour later and ended 30 minutes after that. This event occurred before the plant went l__ _ commercial.

06/22/83 UNUSUAL EVENT Bomb threat phoned to plant security. A thorough search l_ _ turned up no explosives. The event lasted nine hours.

07/26/84 UNUSUAL EVENT Failure of diesel generators to start during a planned test on Unit 2. The unit was in start-up testing and had not begun commercial operation. A problem in the electrical system was l _ corrected, and power restored. The event lasted 40 minutes.

03/21/86 UNUSUAL EVENT Injured and contaminated worker.

05/24/86 ALERT Erosion discovered in pumps for one of the ESW loops. A second ESW loop was operable. PPL shut down the plant to inspect all ESW pumps. The alert lasted 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> while the units were being shut down.

09/23/87 UNUSUAL EVENT A main steam line plug dislodged during a Unit 1 refueling outage. The plug was suspended over the reactor core by three air hoses. Plant crews placed a net under the plug and l__ removed it from the reactor vessel. The event lasted 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.

01/13/88 UNUSUAL EVENT Injured and contaminated worker.

04/10/89 UNUSUAL EVENT Injured and contaminated worker.

02/03/90 ALERT Loss of a shutdown cooling system on Unit 1 resulted in an increase in reactor water temperature. An alternate system was used to stabilize the water temperature until PPL could restore a circuit breaker that disabled the cooling system. The alert lasted six hours.

01/18/92 UNUSUAL EVENT A small hydrogen explosion in the basement of the plant's turbine building injured two workers, one of whom was contaminated with radioactive dust. The event lasted about an l_ hour and a half.

8/23/01 UNUSUAL EVENT An unarmed individual scaled the outer perimeter fence and was apprehended by plant security. The individual did not enter l_ the Protected Area. The event lasted about 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 10/03/02 UNUSUAL EVENT A fire in the Unit two start-up transformer. The fire was extinguished by an automatic fire suppression system. The I_ event lasted about 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

1/29/03 UNUSUAL EVENT Monitors briefly detected a higher than normal radioactive gas release from the Unit 1 turbine building vent. The event lasted about five hours.

EP-AD-000-480, Revision 4, Page 1 of 1