4Progress Energy MARO032008 SERIAL: BSEP 08-0034 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324/License Nos. DPR-71 and DPR-62 Revision to Fourth 10-Year Interval Inservice Testing (IST) Program Update Submittal

Reference:

Letter from Annette H. Pope (CP&L) to Document Control Desk (NRC),

"Fourth 10-Year Interval Inservice Testing (IST) Program Update Submittal," November 13, 2007, ADAMS Accession Numbers ML073230790 and ML0732440148 Ladies and Gentlemen:

By letter dated November 13, 2007, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., submitted the fourth 10-year interval Inservice Testing Program for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. Section 5 of the IST Program Plan provided a listing of valves included in the IST Program for each BSEP unit. CP&L has determined that the HPCI E41-F079 valves for each unit (i.e., shown on pages 5-84 and 5-210 for Units 1 and 2, respectively) did not include the full open stroke exercise test. Enclosed are replacement pages 5-84 and 5-210 for the IST Program Plan which include the omitted stroke exercise test information.

No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Ms. Annette H. Pope, Supervisor - Licensing/Regulatory Programs, at (910) 457-2184.

Sincerely, 7C/, CI/

Randy C. Ivey Manager - Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.

Brunswick Nuclear Plant PO Box 10429 Southport, NC28461 AO4-7 4cc. 4

Document Control Desk BSEP 08-0034 / Page 2 WRM/wrm

Enclosure:

BNP-TR-014 IST Program Plan Replacement Pages cc (with enclosure):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator (Acting)

Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Joseph D. Austin, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)

ATTN: Mr. Stewart N. Bailey (Mail Stop OWEN 8B1) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. Jack Given, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101

BSEP 08-0034 Enclosure BNP-TR-014 IST Program Plan Replacement Pages

IST ProgramPlan Brunswick Steam ElectricPlant Fourth Interval Unit 1 IST Valve Table System: HPCI System No. 2095 Valve ID Drawing Number Coordinate Size Type Actuator Class Category Active? Normal Position Safety Positio l-E41-F079 D-25023 Sht. 2 B-1 2 GL MO 2 A , Yes 0 OC Test Frequency Procedure *Relief/Justification/Remark LLRT PB 20.3-153A ST-C Q 9.7 ST-O Q 9.7 V R 9.7 1-E41-PSE-D003 D-25023 Sht. 2 D-3 16 RD SA S D Yes C OC Test Frequency Procedure Relief/Justification/Remark INSP 5Y PMID 39412-01 V-15 I-E41-PSE-D004 D-25023 Sht. 2 E-3 16 RD SA S D Yes C OC Test Frequency Procedure Relief/Justification/Remark INSP 5Y PMID 39413-01 V-15 I-E41-V159 D-25023 Sht. 1 A-2 14 CK SA I C Yes C OC Test Frequency Procedure Relief/Justification/Remark CV-C R 20.12 RFJ- 11 CV-O R 20.12 RFJ- 1I DA SP 11.1.2.3 RFJ-I I 1-E41-V8 D-25023 Sht. 2 F-5 10 GA HO S B Yes C OC Test Frequency Procedure Relief/Justification/Remark SKID Q 9.2 I-E41-V9 D-25023 Sht. 2 F-4 10 GA HO S B Yes C 0 Test Frequency Procedure Relief/Justification/Remark SKID Q 9.2 Alion Science & Technology 5-84 PEN05.G03 Revision 2

IST ProgramPlan Brunswick Steam ElectricPlant Fourth Interval Unit 2 IST Valve Table System: HPCI System No. 2095 Valve ID Drawing Number Coordinate Size Type Actuator Class Category Active? Normal Position Safety Positio 2-E41-F079 D-2523 Sht. 2 B-8 2 GA MO 2 A Yes 0 OC Test Frequency Procedure Relief/Justification/Remark LLRT PB 20.3-153A ST-C Q 9.7 ST-O Q 9.7 V R 9.7 2-E41-PSE-D003 D-2523, Sht.2 D-6 16 RD SA S D Yes C OC Test Frequency Procedure Relief/Justification/Remark INSP 5Y PMID 39406-01 V-15 2-E41-PSE-D004 D-2523, Sht.2 E-6 16 RD SA S D Yes C OC Test Frequency Procedure Relief/Justification/Remark INSP 5Y PMID 39407-01 V-15 2-E41-V159 D-2523 Sht. 1 A-7 14 CK SA 1 C Yes C OC Test Frequency Procedure Relief/Justification/Remark CV-C R 20.12 RFJ- 11 CV-O R 20.12 RFJ-11 DA SP 11.1.2.3 RFJ-11 2-E41-V8 D-2523 Sht. 2 F-3 10 GA HO S B Yes C OC Test Frequency Procedure Relief/Justification/Remark SKID Q 9.2 2-E41-V9 D-25.23 Sht. 2 F-4 10 GA HO S B Yes C 0 Test Frequency Procedure Relief/Justification/Remark SKID Q 9.2 Alion Science & Technology 5-210 PEN05.G03 Revision 2