Revision to Final Deficiency Rept Re Structural Steel Connections,Originally Reported on 811117.AE Responses to NRC Questions Received But Further Analysis & Clarification Required.Requested Info Will Be Provided by 820723
ML20053C617
Person / Time
Site: Satsop
Issue date: 05/21/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, G3-82-525, G3-82-52555E, GO3-82-525, NUDOCS 8206020388
Download: ML20053C617 (1)


Text

jdy

}n.}Fa Washington Public Power Supply Sy~ stem Box 1223 Elma, Washington 98541 (206)482#442s 2R Docket Numbers 50-508 and 50-509

,,, O n

~

S May 21, 1982 Edat'..,.

G03-82-525 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention:

Mr. B. H. Faulkenberry Acting Chief, Reactor Construction Projects Branch

Subject:

PROJECT NOS. 3 AND 5 REPORTABLE 10CFR50.55(e) DEFICIENCY STRUCTURAL STEEL CONNECTIONS - UNITS 3 AND 5 (D/N #019)

References:

1.

G03-81-2756, dated November 17, 1981, Mr. R. S.

Leddick to Mr. B. H. Faulkenberry, Final Report of Potential 10CFR50.55(e), Structural Steel Connections -

Unit No. 5 (D/N #019).

2.

G03-82-101, dated January 29, 1982, Mr. R. S.

Leddick to Mr. B. H. Faulkenberry, Final Report of Potential 10CFR50.55(e), Structural Steel Connections -

Unit No. 3 (D/N #019 and 021).

3.

NRC Letter, dated April 21, 1982, Docket No. 50-508/509, Mr. T. W. Bishop to Mr. R. S. Leddick, same subject.

References 1 and 2 provided your office with the final reports for the subject 10CFR50.55(e) condition. Upon review of the reports, your staff determined that additional information was required to complete the anal-ysis and evaluation of the deficiencies and corrective action. Accord-ingly, Reference 3 outlined NRC questions that had arisen and directed the Supply System to provide a response.

The Supply System has received the AE's response to the NRC questions; however, prior to forwarding it to your office, it has been determined that further analysis and clarification is required. Consequently, the requested information will be provided by July 23, 1982.

Should you have any questions or desire further information, please con-tac directly'.

s

. S. Le dick, 7 0 Program Director, WNP-3 DRC/tt cc:

J. Adams - NESCO l

D. Smithpeter - BPA Ebasco - New York WNP-3/5 Files - Richland 8206020388 820521 PDR ADOCK 05000508 Jp S

PDR 13 3