Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N03-0533, Revised Core Operating Limits Report, Cycle 12 + (Revised Core Operating Limits Report, Cycle 12)
- NL-09-047, Revised Core Operating Limits Report, Cycle 16 + (Revised Core Operating Limits Report, Cycle 16)
- NL-06-069, Revised Core Operating Limits Report, Cycle 18 + (Revised Core Operating Limits Report, Cycle 18)
- NL-10-034, Revised Core Operating Limits Report, Cycle 20 + (Revised Core Operating Limits Report, Cycle 20)
- NL-10-070, Revised Core Operating Limits Report, Mid-Cycle Revision + (Revised Core Operating Limits Report, Mid-Cycle Revision)
- ML18151A655 + (Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2)
- ML20044C155 + (Revised Corporate Organization for Nuclear Incidents (Coni) Procedure,Including Rev 14 to Coni 4.01,Rev 20 to Coni 4.02, Rev 10 to Coni 8.04,Rev 1 to Coni 10.04 & Rev 1 to Coni 10.05)
- ML20035E545 + (Revised Corporate Organization for Nuclear Incidents (Coni) Procedure Manual,Including Rev 73 to Table of Contents,Rev 23 to Coni 5.01, On-Call Technical Support Team & Rev 26 to Coni 10.01, Corporate EOC Equipment & Erds..)
- ML20247H337 + (Revised Corporate Organization for Nuclear Incidents (Coni) Procedure Manual Including Rev 15 to CONI-1.01, Preparation,Issuance & Control Procedures, Rev 30 to CONI-1.02, Coni & Rev 19 to CONI-1.03, Alerting ..)
- ML20127B537 + (Revised Corporate Plan Implementing Procedures (Cpips), Including Rev 37 to Cpip Index & Rev 12 to Cpip 1.3, Activation & Operation of EOF,)
- ML20216D712 + (Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2)
- ML18094A384 + (Revised Corrected Monthly Operating Rept for Feb 1989 for Salem Unit 2)
- ML18094A385 + (Revised Corrected Monthly Operating Rept for Mar 1989 for Salem Unit 2)
- ML14309A255 + (Revised Corrected Motion to Regroup Oral Arguments Contentions)
- ML21028A388 + (Revised Correction of Amendment Nos. 308 and 253 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements)
- ML083230637 + (Revised Corrections to Amendments 188 and 175, Relocate Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (Risk-Informed Initiative 5-b))
- ML19305D938 + (Revised Corrective Actions to 800213 Final Deficiency Rept. Buttered Edges on Reactor Pressure Vessel Pedestal Examined & Repaired.Vendor Film Quality Sufficient to Produce Repair Overlays)
- ML17053C724 + (Revised Cover Page to IE Health Physics Appraisal Rept 50-220/80-11)
- IR 05000289/1985029 + (Revised Cover Page to Insp Rept 50-289/85-29,renumbering Exam Rept 50-289/85-19 as 50-289/85-29)
- IR 05000275/1985009 + (Revised Cover Page to Insp Repts 50-275/85-09 & 50-323/85-10,correcting Transposed Insp Rept Numbers)
- ML15264A157 + (Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21)
- ML20043B265 + (Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7,Rev 26 to CMIP-8, Rev 33 to CMIP-9,Rev 2 to CMIP-14 & Rev 10 to CMIP-16)
- ML093521435 + (Revised Criticality Analysis - Revision to Technical Specification 4.3.1.1.a Concerning K-infinity)
- ML20206F559 + (Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997)
- ML110590748 + (Revised Cyber Security Plan - Request for Additional Information)
- DCL-13-064, Revised Cycle 18 Core Operating Limits Reports + (Revised Cycle 18 Core Operating Limits Reports)
- ML11307A485 + (Revised D. C. Cook, Units 1 & 2, RAI on the Alloy 600 Aging Management Program)
- ML20113F755 + (Revised DAEC Emergency Action (EAL) Technical Basis Document)
- ML030560668 + (Revised DAEC Physical Security Plan, Revision 45)
- ML20212A938 + (Revised DOE Rept Doe/Id 10523, Analysis of Melt Spreading in AP600-Like Cavity)
- ML19253B879 + (Revised Daily Plant Power Output Sheet for June 1974)
- ML032380285 + (Revised Damage Control Team Coordinator: Emergency Plan-Position Specific Procedure)
- ML032461236 + (Revised Damage Control Team Coordinator: Emergency Plan - Position Specific Procedure)
- 05000302/LER-1981-036, Revised Data Sheet for Item 5 of LER 81-036/03L-0,correcting Units of Radioiodine Measure & Including Data for First Sample of Event + (Revised Data Sheet for Item 5 of LER 81-036/03L-0,correcting Units of Radioiodine Measure & Including Data for First Sample of Event)
- ML14365A349 + (Revised Date for Permanent Capability to Perform Offsite Dose Assessment During an Event Involving Multiple Release Source)
- ML022400273 + (Revised Davis-Besse IMC 0350 Oversight Panel Charter)
- ML022070669 + (Revised Davis-Besse IMC 0350 Oversight Panel Charter)
- ML021840651 + (Revised Davis-Besse IMC 0350 Oversight Panel Charter)
- ML20136H095 + (Revised Davis-Besse Reactor Protection Sys Single Failure Analysis)
- ML042400005 + (Revised Decay-in-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material)
- RIS 2004-17, Revised Decay-in-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material + (Revised Decay-in-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material)
- ENOC-09-00034, Revised Decommissioning Funding Assurance Plan + (Revised Decommissioning Funding Assurance Plan)
- ML20056G448 + (Revised Decommissioning Funding Plan for Commercial Nuclear Fuel Plant)
- L-02-067, Revised Decommissioning Funding Report for 2001 + (Revised Decommissioning Funding Report for 2001)
- NG-07-0481, Revised Decommissioning Funding Status Report + (Revised Decommissioning Funding Status Report)
- ML20203F958 + (Revised Decommissioning Plan)
- ML13226A206 + (Revised Decommissioning Plan and Post-Shutdown Decommissioning Activities Report)
- E910-04-017, Revised Decommissioning Report for the Saxton Nuclear Experimental Corporation and Financial Test Information + (Revised Decommissioning Report for the Saxton Nuclear Experimental Corporation and Financial Test Information)
- ML17300A779 + (Revised Deficiency Evaluation Repts DER 84-30 & 86-25 Re U-2 Diesel Generator Valves & Kaman Radiation Monitors, Respectively.Changes to Reported Info or Corrective Actions Noted)
- ML19262A048 + (Revised Deficiency Rept 78-03 on Reactor Containment Liner Overlay Pad Fillet Weld Crack.Found 1-ft Crack Along Toe of Bottom Horizontal Fillet Weld.Cracked Area of Liner Plate Removed.Will Be Replaced Using Approved Procedures)
- PLA-1928, Revised Deficiency Rept Re Anchor/Darling Valve Co Globe Valves Used in Throttling Svc within RHR Sys.Initially Reported on 811112.Listed Interim Measures Adequate Until Permanent Mods Implemented + (Revised Deficiency Rept Re Anchor/Darling Valve Co Globe Valves Used in Throttling Svc within RHR Sys.Initially Reported on 811112.Listed Interim Measures Adequate Until Permanent Mods Implemented)