Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065Q160 + (Rev 9 to Inservice Testing Program Plan for Valves)
- ML20024H404 + (Rev 9 to Inservice Testing Program Plan for Valves)
- ML20100G320 + (Rev 9 to Inservice Testing Program for Pumps & Valves)
- ML20236F743 + (Rev 9 to Inservice Testing Program,Callaway Nuclear Plant)
- ML20151M789 + (Rev 9 to Inservice Testing Program,Vermont Yankee, Including Description,Program,Testing Schedules & Relief Requests)
- ML20205Q607 + (Rev 9 to Instruction CP-EI-4.6-1, Field Design Change Control Instructions)
- ML20210B058 + (Rev 9 to Instruction QI-QP-11.14-3, Insp of Structural/ Miscellaneous Steel Welding. Supporting Documentation Encl)
- ML20136A768 + (Rev 9 to Instruction QI-QP-11.3-29.1, Verify Electrical Separation)
- ML20136B422 + (Rev 9 to Instruction QI-QP-11.3-40, Class 1E Electrical Post-Const Verification)
- ML20094J242 + (Rev 9 to Ja Fitzpatrick Nuclear Power Plant IST Program for Pumps & Valves Second Interval)
- ML20134G574 + (Rev 9 to MCEI-0400-47, McGuire Unit 2,Cycle 11 Colr)
- ML20202G960 + (Rev 9 to MP 702.1, Rv Steam Dryer & Moisture Separator Removal & Replacement, Do Not Use Status)
- ML20215N407 + (Rev 9 to Maint Instruction MI-10.20, 6900 & 480 Volt Motor Insulation Resistance Test)
- ML20205M501 + (Rev 9 to McGuire Nuclear Station Pump & Valve Inservice Testing,Unit 1)
- ML20095J379 + (Rev 9 to McGuire Unit 1 Cycle 11,Core Operating Limits Rept, for Dec 1995)
- ML17056B984 + (Rev 9 to Nine Mile Point Nuclear Station Unit 1 Odcm)
- ML20134P133 + (Rev 9 to Nuclear QA Program Manual)
- ML17264A888 + (Rev 9 to ODCM for Ginna Station)
- ML20138K387 + (Rev 9 to OI 22D, Changing Seal Water Injection Filters (F39A&B))
- ML20078Q521 + (Rev 9 to OPMP04-ZG-0003, General Valve Repacking)
- ML20094S575 + (Rev 9 to OT-100 Bases, Reactor Low Level - Bases)
- ML20094S593 + (Rev 9 to OT-100 Reactor Low Level)
- ML20107C310 + (Rev 9 to Odcm)
- ML20090B037 + (Rev 9 to Odcm)
- ML20056F997 + (Rev 9 to Odcm)
- ML20034F023 + (Rev 9 to Odcm)
- ML20138D979 + (Rev 9 to Offsite Dose Assessment Manual for Gaseous & Liquid Effluents)
- ML20092K684 + (Rev 9 to Offsite Dose Calculation Manual)
- ML20153F336 + (Rev 9 to Offsite Dose Calculation Manual)
- ML20205T727 + (Rev 9 to Offsite Dose Calculation Manual)
- ML20238A866 + (Rev 9 to Offsite Dose Calculation Manual)
- ML20212D941 + (Rev 9 to Offsite Dose Calculation Manual. Marked-up Rev 9 to Manual Encl)
- ML20114C385 + (Rev 9 to Offsite Dose Calculation Manual for Wolf Creek Generating Station)
- ML20078M809 + (Rev 9 to Offsite Dose Calculation Manual for Braidwood, Consisting of Chapters 7.2 & 8.0)
- ML20100R296 + (Rev 9 to Operating Procedure AR-602, Tgf M Annunciator Response)
- ML20094D295 + (Rev 9 to Operations QA Plan)
- ML20138K455 + (Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device Unit 1)
- ML20138K499 + (Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device for Unit 2)
- ML20138K465 + (Rev 9 to Ort 50, PRT to Gas Analyzer Sample Line Unit 1)
- ML20138K528 + (Rev 9 to Ort 72, Electrical Penetration Leak Test for Unit 2)
- ML20101P156 + (Rev 9 to Oyster Creek Nuclear Generating Station Pump & Valve IST Program)
- ML20138K626 + (Rev 9 to Pc 77,Part 1, Refueling Interval Automatic Fire Protection Sys Valve Trip-Test & Alarm Verification Test Unit 1)
- ML20107L670 + (Rev 9 to Point Beach Nuclear Plant Unit 1 & 2 Odcm)
- ML20199E151 + (Rev 9 to Prerequisite Test Instruction XCP-EE-8, Control Circuit Functional Testing)
- ML20155C087 + (Rev 9 to Procedure 12006-C, Unit Cooldown to Cold Shutdown)
- ML20151D697 + (Rev 9 to Procedure 29.023.01, Reactor Pressure Vessel Control Emergency Procedure. W/One Oversize Encl)
- ML20211N687 + (Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program)
- ML17255A519 + (Rev 9 to Procedure A-401, Control of Procurement Documents Prepared at Ginna Station)
- ML20107C150 + (Rev 9 to Procedure AP-880, Fire Protection)
- ML20216D062 + (Rev 9 to Procedure B.2, Uftr Operating Procedure)
- ML20210U066 + (Rev 9 to Procedure CEI-20, Installation of Hilti Drilled- in Bolts. Supporting Documentation Encl.W/Two Oversize Illegible Drawings)
- ML20195F554 + (Rev 9 to Procedure CP-EI-4.0-13, Control of Stress Analysis for Pipe Support Engineering)
- ML20081M197 + (Rev 9 to Procedure DAP 07-05, Operating Logs & Records)
- ML20204H451 + (Rev 9 to Procedure OP-9A, Liquid Waste Process Sys Operation)