ML20094D295

From kanterella
Jump to navigation Jump to search
Rev 9 to Operations QA Plan
ML20094D295
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/26/1991
From: Hall D, Jordan T
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20094D290 List:
References
NUDOCS 9112200157
Download: ML20094D295 (3)


Text

~'

3 n

=-,-

sm 734 (os/so) 7f SOUTH-TEXA8 PMOJECT ELECTRIC GENERATING-8 TAT 10N """

o OPERATIONS Q11ALITY ASSURANCE PLAN pg y

[AY 12-20-91

  1. /#7/f/

Approved by1 Date D. P.,Hali, Group Vice President Nuclear h

Approved byt V

Date: _// d

/

Nuc(p#ar Assurancej'.Jdbfan,-General Manager

/- /

T.

1 i

9112200157 911213 PDR ADOCK 05000498 P

-PDR

3 l

sm 724 (c2/00) i SOUTH TEXAS PROJECT 5LECTRIC GENERATING 8 TAT 10N E

Table of Contents 9

OPERATIolis Q' ALITY ASSURAl!CE PIA}{

PACC 1&

2 UT LCTIVE I

TABLE OF C01tTENTS D ATE -

12-20-91 1

Chapters Requiring NRC Approval l

Chapter Title of Effective Effective Number chapter Revision No.

Date Definitions 5

12-21-90 1.0 Organization 5

12-21-90

. r 2.0 Program Description 7

12-20-91

'3.0 Conduct of Plant Operations 6

12-20-91 4.0 Qualification, Training, and 4

12-21-90 Certification of Personnel 5.0 Maintenance, Installation of 4

12-21-90 Modifications, and Related Activities i

6.0

. Design and Modification Control 5

12-21-90

7. 0, Procuremont

'5 12-21-90 8.0 Control and Issuance of 4

12-21-90' Documents 9.0 Control of Material 5

12-20-91

.10. 0 -

Inspection 6

12-21-90 11.0 Tebt Control 5

22-21-90 12.0 Instrument and Calibration

- 5 12-21-90 l

control i

-13.0 Deficiency control 5

12-20-91 "14.0

' Records Control

- 4 12-21-90 15.0 Quality Assurance Audit 4

12-21-90 and-Surveillance f

5 F

=

.,g-9-eug'y a r

-qt + W 4y :h =4 -$":W-t y-**sr-rhh7e s,e-W er -WM4"Mtr---w"T*M'""**wM*ewir wa'-

p*EwtJrSNN=-

4'

-d----:-

- - - = ' '

  • t STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Table

_of Contenis 4

OPERATIONS QUALITY ASSURANCE PLAN PACE Or y

irricmt i

TABLE OF CONTENTS DAR 12-29-91._

Chapters Not Requiring NRC Approval Chapter Titfo of Effectivo Effectivo 1[qab_gr chanter

.._ Revision No.

Date 16.0 Nuclear Fuel Management 3

12-21-90 17.0 ASME Codo Section XI Repairo 4

12-21-90 and Replacements 18.0 ASME Code Sect!.on XI - Inservico 4

12-21-90 Inspection and Testing