ML20107C150

From kanterella
Jump to navigation Jump to search
Rev 9 to Procedure AP-880, Fire Protection
ML20107C150
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/10/1996
From:
FLORIDA POWER CORP.
To:
References
AP-880, NUDOCS 9604170245
Download: ML20107C150 (8)


Text

.

l o

1 Document Transmittat #: 44126 Date: 4/10/96 i

-Tc:

NRC (DC DESK)

MAC: N/A D0stination:

==

Description:==

l.

Copy Copy Totals j

Document:

Revision:

Comment:

INFO CNTL MSTR AP0880 09' 7

1 0

0 l

i i

1 I

)

l l

I f

i I

l i

i l

l Instructions to the Addressee:

Please verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.

The signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated transmittal to Document Control viithin 20 days at mail code:

NA1C Florida Power Corporation 9604170245 960410 Document Control, NA1C PDR ADOCK 05000302 Crystal River Energy Complex F

PDR 15760 W. Power Line St.

Crystal River, FL 34428-6708 I.

Signature of Addressee:

Date:

i independent Verification:

Date:

)

(Control Room documents only)

i 1-FP REV 9 DATE AP-880

/-)

rw.

f-Document secticn f

NFORM ATION ONL YI l

l l

c FIRE (PROTECTION r l

1.0 ENTRY CONDITIONS lE notified of a fire, THEN use this procedure.

1 2.0 IPMEDIATE ACTIONS l

Note There are no immediate actions in this procedure.

llO l

l l

t 1

l i

)

This Procedure Addresses Safety Related Components n

i Approved by MNPO [d

/

Date 1/I/d6

/

(

AP-880 PAGE 1 of 7 FP j

2 I

N I

l

O BLANK PAGE O

AP-880 REV 9 PAGE 2 0F 7 FP s

3.0 FOLLOW-UP ACTIONS i

ACTIONS DETAILS l

3.1 E affected area is l

protected by fire l

protection systems, TE N ensure fire protection systems are operating.

l l

3.2 E the fire is already out i

OR the Fire Team Leader l

determines that additional fire brigade response is not required, JE H GO TO Step 3.7 in l

this procedure l 3.3 Notify plant personnel of 1

Depress " FIRE ALARM" pushbutton.

i fire location.

2 Notify plant personnel over PA of:

o Fire location

-l 0 Required response 3

Repeat PA announcement.

l 3.4 Notify additional lo STA personnel of plant conditions as required.

l0 Plant operators o

SSOD to evaluate plant conditions for potential entry into the Emergency Plan i

i a

4 O

AP-880 REV 9 PAGE 3 0F 7 FP f

N

l Table 1: AH Fans In Various Fire Locations

~

O Note The fans associated with this table are being stopped to support the proper operation of fire dampers which are designed to close under no flow conditions.

I CONTROL POWER FIRE LOCATION AFFECTED FAN LOCATION SUPPLY Unit 4160 or Unit 480 volt AHF-49 I&C Cal Lab Turb MCC 3A switchgear room 145' TB Unit 3D l

IB 95'or 119' elevation

__ AHF-29A HVAC panel ES MCC 3Al AHF-24A rear MCB Unit 13C &

13D ES MCC 382-AHF-29B Unit 4B &

AHF-24B 6C l

Any elevation of CC AHF-17A HVAC panel ES MCC 3A2 AHF-19A rear MCB Unit 4B &

2B AHF-17B ES MCC 382 1

Unit 3D AHF-198 ES MCC 383 Unit 3KN AHF-54A ES MCC 3A3 Unit 3KN l

AHF-54B ES MCC 383 Unit IKN l

95' elevation AB:

AHF-20A HVAC panel ES MCC 3Al AHF-44A rear MCB Unit 8B &

o Nuclear sample room 9D o PASS valve alley AHF-20B ES MCC 381 o PASS sample room Unit 98 AHF-44B ES MCC 382 l

Unit 1C AHF-30 Vent MCC 3A Unit 2D Hot machine shop welding AHF-34A Hot machine Mach shop hood AHF-41A shop on the MCC Unit ID north wall

& 1E O

AP-880 REV 9 PAGE 4 0F 7 FP s

u

l4 l

l 3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS l

Note The CR-3 Pre-fire plan lists equipment, power supplies and f

special fire concerns for each location of the plant.

l 3.5 Establish continuous Maintain communications using:

l communications.

o Plant line 1 o Portable radios l

l 3.6 Repeat fire location and fire brigade response i

location over the PA = 2 l

minutes after initial l

notification.

1 3.7 JE fire has radiological Refer to EM-206, Emergency Plan Roster implications, and Notification.

IHG notify Health Physics, and Radiation Emergency Team.

A l 3.8 IE the fire location is See Table 1, AH Fans In Various Fire listed on Table 1, Locations THEN stop AH fans in the affected area.

l 3.9 Determine potential impact Refer to OP-880, Fire Service System, on Appendix 'R' safe, Appendix 'R' Post-Fire shutdown equipment.

Safe Shutdown Information l 3.10 Jf fire is in AB, THEN establish RB cooling units on SW cooling within e-1 hr.

j (

j AP-880 REV 9 PAGE 5 0F 7 FP 4

L m

4

,e 4

4

.-+

c.

J 6

h f

i I

4 l

l l

l l

BLANK PAGE 1

l i

AP-880 REV 9 PAGE 6 0F 7 FP

i A

' 3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS 3.11

_If fire is in AB, o Notify available operator to close M isolate hydrogen HYV-34, Auxiliary Building Supply supply to AB Isolation, located 119' TB near west wall of air shaft.

3.12 WHEN fire is out, M establish firewatch per Fire Team Leader's instructions.

3.13 IE initial PA announcement 1

Notify plant personnel over the was made in Step 3.3, PA.

M notify plant personnel that fire is 2

Repeat PA announcement.

out.

l 3.14 Notify SSOD of fire damage Os and status of fire protection system.

l 3.15 Notify Facilities Service Supervisor to restore fire brigade equipment to a state of readiness.

l 3.16 Restore fire protection systems to standby.

l 3.17 Notify the SS0D to ensure The information from the Problem that a Problem Report is Report will be used by the Nuclear initiated per CP-111 to Fire Protection staff to file FPC form document the fire 908 110(S), System Fire Report.

incident.

AP-880 REV 9 PAGE 7 0F 7 (LAST PAGE)

FP

_