Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211N766 + (Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure)
- ML20247E882 + (Rev 4 to Framatome QA Program (for Us Applications))
- ML20198Q990 + (Rev 4 to Framework for AP600 Severe Accident Mgt Guidance)
- ML20149H511 + (Rev 4 to GW-GJR-100, AP600 Emergency Response Guidelines)
- ML20217Q073 + (Rev 4 to General Atomics Hot Cell Facility Decommissioning Plan)
- ML20210F304 + (Rev 4 to General Instructions for Cable Tray Hanger Analysis for Comanche Peak Steam Electric Station Units 1 & 2)
- ML20206C275 + (Rev 4 to General Mgt & Policy, TVA Employee Concerns Special Program)
- ML20083P152 + (Rev 4 to General Procedure for Inservice Testing of Pumps)
- ML20247A405 + (Rev 4 to General Test Procedure GTP-302, Inservice Testing of Valves)
- ML20133K560 + (Rev 4 to Gpu Nuclear Corp Recovery QA Plan for TMI Unit 2)
- ML18092B122 + (Rev 4 to Guide AD-2, Authors Guide for Operations Dept Documents. Comparison Records Encl)
- ML20214N960 + (Rev 4 to Health Physics Procedure RAC-010, Augering & Gamma Logging of Boreholes & Rea Soil Sampling)
- ML20249B776 + (Rev 4 to Hwm 15.1-7, Spill Prevention Control & Countermeasure Plan)
- ML20134A259 + (Rev 4 to Hydrogen Control Program Plan)
- ML20129C401 + (Rev 4 to ISI Plan for Bngs First Insp Interval)
- ML20215N665 + (Rev 4 to ISI-P-002, Preservice Insp Program)
- ML20195J919 + (Rev 4 to ISI-P-010, Preservice Insp Program Vogtle Electric Generating Plant Unit 2)
- ML20079G507 + (Rev 4 to ISI-P-014, Inservice Insp Program for Vogtle Unit 2)
- ML17157B010 + (Rev 4 to ISI-T-200.0, Sses,Unit 2,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04)
- ML20140G913 + (Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling))
- ML20151X276 + (Rev 4 to Independent Assessment Program Conduit Support Design Review Issues List for Comanche Peak Steam Electric Station - Unit 1)
- ML20154G525 + (Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan)
- ML20034C106 + (Rev 4 to Inservice Insp Program First 10-Yr Interval)
- ML17255A571 + (Rev 4 to Inservice Pump & Valve Testing Program for Jan 1981 - Dec 1990)
- ML20035F073 + (Rev 4 to Inservice Test Program (ISI-P-106) for Vogtle Electric Generating Plant,Unit 2)
- ML20138R184 + (Rev 4 to Inservice Testing Program)
- ML20079H239 + (Rev 4 to Inservice Testing Program Plan)
- ML20149E277 + (Rev 4 to Inservice Testing Program Plan for Pumps & Valves)
- ML20126M051 + (Rev 4 to Inservice Testing Program for Pumps & Valves)
- ML18087A748 + (Rev 4 to Insp Order Program)
- ML20205S924 + (Rev 4 to Insp Performance, Element Rept)
- ML20207P922 + (Rev 4 to Insp Program Scope, Element Rept)
- ML20210B026 + (Rev 4 to Instruction QA-QP-11.14-3, Insp of Structural/ Miscellaneous Steel Welding)
- ML20199E435 + (Rev 4 to Instruction QI-013, Documentation Review for Instrumentation Equipment/R-E-ININ. Related Documentation Encl)
- ML20210G892 + (Rev 4 to Instruction QI-059, Reinsp of Mechanical Equipment Installation)
- ML20198K472 + (Rev 4 to Instruction QI-QP-11.18-3, Ultrasonic Thickness Measurement. Related Documentation Encl)
- ML20136B477 + (Rev 4 to Instruction QI-QP-11.3-28, Class 1E Cable Terminations)
- ML20136A760 + (Rev 4 to Instruction QI-QP-11.3-29, Electrical Separation)
- ML20136B199 + (Rev 4 to Instruction QI-QP-11.3-40, Class 1E Electrical Post-Const Verification)
- ML20207S481 + (Rev 4 to Instruments,Matl,Equipment Re Purchasing & Requisitions)
- ML20210E726 + (Rev 4 to Interface Control Instructions)
- ML20198B888 + (Rev 4 to Isap III.a.1, Hot Functional Testing Data Packages)
- ML20141N173 + (Rev 4 to Isap III.a.4, Traceability of Test Equipment)
- ML20141N174 + (Rev 4 to Isap Iii.B, Containment Integrated Leak Rate Test (Cilrt))
- ML20141N177 + (Rev 4 to Isap Iii.C, Prerequisite Testing)
- ML20141N178 + (Rev 4 to Isap Iii.D, Preoperational Testing)
- ML20215B736 + (Rev 4 to Issue Specific Action Plan Isap Iii.D, Preoperational Testing)
- ML20215B713 + (Rev 4 to Issue Specific Action Plan Isap I.b.3, Conduit to Cable Tray Separation)
- ML20215B728 + (Rev 4 to Issue Specific Action Plan Isap I.a.4, Agreement Between Drawings & Field Terminations)
- ML20217J009 + (Rev 4 to JAF-RPT-DHR-02413, Evaluation of Decay Heat Removal Sys)
- ML20236N433 + (Rev 4 to LIS-100C, Min Required Gap Between Secondary Walls & Floors Above)