Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Rev 1 to Colr,Cycle 8". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20069G965  + (Rev 1 to Catawba 1 & 2,Procedure for Selection of Type of Piping Branch Connection,Duke Classes B,C,E,F,G)
  • ML20198J407  + (Rev 1 to Catawba Nuclear Station Diesel Engine 2A Component Revalidation Insp)
  • ML20066C208  + (Rev 1 to Catawba Unit 2 Cycle 4 Core Operating Limits Rept)
  • ML20137S501  + (Rev 1 to Catawba Unit 2 Inservice Testing Program for Pumps & Valves)
  • ML20155C145  + (Rev 1 to Cement Solidification Sys Run Plan for Decontaminated Supernatant)
  • ML20207C034  + (Rev 1 to Change 1 to Inservice Insp IGSCC Program for Millstone Unit 1,Applicable To:Rcpb Weld Exam Selection for 1989 Refueling Outage)
  • ML20085D923  + (Rev 1 to Change Request 16 to Application for Amend to License DPR-4,revising Safeguards Rept)
  • ML20077J557  + (Rev 1 to Chapter 17 of QA Program for Station Operation)
  • ML20151R882  + (Rev 1 to Characterization of Intergranular Attack in TMI-1 Once-Through Steam Generator Tube Samples)
  • ML20151N788  + (Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation)
  • ML20147D698  + (Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2)
  • ML20207P653  + (Rev 1 to Chemical & Radiological Procedures)
  • ML20029A767  + (Rev 1 to Chemistry Procedure CP 607, Offsite Dose Calculation Manual)
  • ML20196K577  + (Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass)
  • ML18033A196  + (Rev 1 to Civil Engineering Branch Instruction CEB-CI 21.100, Brown Ferry Nuclear Class I HVAC Duct & Duct Support Seismic Qualification Interim Operability Acceptance Criteria)
  • ML18033A191  + (Rev 1 to Civil Engineering Branch Instruction CEB-C1.102, Operability Criteria for Miscellaneous Steel)
  • ML18033A188  + (Rev 1 to Civil Engineering Branch Instruction CEB-CI 21.97, Operability Criteria for Pipe & Pipe Supports on TVA Class I Seismic Piping - Browns Ferry)
  • ML20196J290  + (Rev 1 to Civil Engineering Technical Rept 0005, Differential Settlement Between Svc Bldg & Unit 2 Main Steam Valve House)
  • ML20212H103  + (Rev 1 to Civil/Structural Design:Structural Steel Connection Design)
  • ML20098E106  + (Rev 1 to Clinton Power Station Core Operating Limits Rept, Reload 3,Cycle 4)
  • U-600487, Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program  + (Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program)
  • ML20086E814  + (Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers)
  • ML18087A742  + (Rev 1 to Cold Shutdown to Hot Standby)
  • ML17264A678  + (Rev 1 to Colr)
  • ML20248H115  + (Rev 1 to Colr,Cycle 6 for Fermi 2)
  • ML20202B848  + (Rev 1 to Colr,Cycle 9 for Songs,Unit 2)
  • ML20202B862  + (Rev 1 to Colr,Cycle 9 for Songs,Unit 3)
  • ML20210T925  + (Rev 1 to Comanche Peak Plan for Completion of Outstanding Regulatory Actions)
  • ML20238A883  + (Rev 1 to Comanche Peak Rept Review Group Task 2 Rept for 870120-0227)
  • ML20199E142  + (Rev 1 to Comanche Peak Response Team Action Plan,Item V.E, Installation of Main Steam Pipes)
  • ML20199E130  + (Rev 1 to Comanche Peak Response Team Action Plan,Item V.C, Design Consideration for Piping Sys Between Seismic Category I & Non-Seismic Category I Bldg)
  • ML18004C003  + (Rev 1 to Comanche Peak Response Team Issue-Specific Action Plan Isap VII.a.9, Adequacy of Purchased Safety-Related Matl & Equipment)
  • ML20237K942  + (Rev 1 to Comanche Peak Response Team Issue Specific Action Plan VII.a.4, Audit Program & Auditor Qualification)
  • ML20212H398  + (Rev 1 to Comanche Peak Response Team Results Rept Isap VII.a.3, Document Control)
  • ML20214V803  + (Rev 1 to Comanche Peak Response Team Results Rept Issue Specific Action Plan VII.a.2, Nonconformance & Corrective Action Sys)
  • ML20212H332  + (Rev 1 to Comanche Peak Response Team Results Rept Issue- Specific Action Plan I.a.1, Heat-Shrinkable Cable Insulation Sleeves)
  • ML20237H250  + (Rev 1 to Comanche Peak Response Team Results Rept Issue- Specific Action Plan Iii.C, Prerequisite Testing)
  • ML20212E143  + (Rev 1 to Comanche Peak Response Team Results Rept ISAP:VII.b.1, Onsite Fabrication)
  • ML20234E370  + (Rev 1 to Comanche Peak Response Team Results Rept for Issue-Specific Action Plan-VII.C,Const Reinsp Documentation Review:Vol IV-E,Support Population Repts & Miscellaneous Apps,(Apps 25-35))
  • ML20198T104  + (Rev 1 to Comanche Peak Response Team Results Rept Isap VII.a.4, Audit Program & Auditor Qualification)
  • ML20235S177  + (Rev 1 to Comanche Peak Response Team Results Rept Isap:Vi.B, Polar Crane Shimming)
  • ML20215B742  + (Rev 1 to Comanche Peak Response Team Results Rept Isap I.a.4, Agreement Between Drawings & Field Terminations)
  • ML20207E184  + (Rev 1 to Comanche Peak Response Team Results Rept Isap: I.b.1, Flexible Conduit to Flexible Conduit Separation)
  • ML20207E163  + (Rev 1 to Comanche Peak Response Team Results Rept Isap: I.b.2, Flexible Conduit to Cable Separation)
  • ML20234E348  + (Rev 1 to Comanche Peak Response Team Results Rept for Issue-Specific Action Plan-VII.C,Const Reinsp/Documentation Review:Vol IV-C,Mechanical Population Repts,(Apps 8-17))
  • ML20215B741  + (Rev 1 to Comanche Peak Response Team Results Rept Isap Ii.B, Concrete Compression Strength)
  • ML20198T084  + (Rev 1 to Comanche Peak Response Team Results Rept Issue- Specific Action Plan I.a.3, Butt-Splice Qualification)
  • ML20234E343  + (Rev 1 to Comanche Peak Response Team Results Rept for Issue-Specific Action Plan-VII.C,Const Reinsp/Documentation Review:Vol IV-B,Electrical Population Repts,(Apps 1-7))
  • ML20214V787  + (Rev 1 to Comanche Peak Response Team Results Rept Issue Specific Action Plan VII.a.1, Matl Traceability)
  • ML20215B749  + (Rev 1 to Comanche Peak Response Team Results Rept Isap I.b.3, Conduit to Cable Tray Separation)