ML20066C208
| ML20066C208 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/31/1990 |
| From: | Clark K, St Clair R DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20066C203 | List: |
| References | |
| NUDOCS 9101090358 | |
| Download: ML20066C208 (3) | |
Text
-
_ =.
CNNE-1553.05-00-0009 Page 1 (Rey, 1)
QA CONDITION 1 Catawba Nuclear Station COLR Duke Power Company Catawba L51t 2 Cycle 4 i
Core Operating Limits Report Revision 1 December 1990 Prepared by:ITI b Checked by: M if#
Approved by: M7 kd 9101090358 910103 PDR ADOCK 05000414 P
PDR c -
, v. r I
d CNNE-1553,05-00-0009 Page 2 (Rev. 1)
Catawba 2 Cycle 4 Core Operating Limits Report i
REVISION LOG Revision Effective Date Effective Pages Original Issue August 01, 1990 Pages 3,4,6-16 Revision 1 Decembe r 14, 1990 Pages 1,2,5 9
f 4
0
- ~.
,,m-,.
m
,y.,
,,,.r,n..wyy
-, - - -.v--.-
-e,,----w.3c--
i a
CN NE.1663,05 00 0009 Page 5 (Rev.1) t 4
i Catawba 2 Cycle 4 Core Operating Limits Report 1.0 0.9" Unacceptable
~
Operation 0.0-C 0.7,
tm 4
0.6-g E
Acceptable Operation 1
0.5-Y.
W
{
0.4 -
S 0.3-a 0.2-0.1-0.0 0
10 20 30 40 50 60 70 80 90 100
-% of Rated Thermal Power FIGURE 1
-MODERATOR TEMPERATURE COEFFICIENT VS. POWER LEVEL
_ _.