ML20045E577
| ML20045E577 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/25/1993 |
| From: | SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | |
| Shared Package | |
| ML20045E576 | List: |
| References | |
| NUDOCS 9307020215 | |
| Download: ML20045E577 (6) | |
Text
.r.
^
6 SOUTII CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION CORE OPERATING LIMITS REPORT CYCLE 8 Revision 1 June 25,1993 V. C. Summer Nuclear Station -
Core Operating Limits Report 9307020215 930625 Cycle 8, Revision 1
-ADOCK'0500g5
- PDR P-
LIST OF EFFECTIVE PAGES Page
-Revision i
1 ii 0-9 1
0 2
0 t
3 0'
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 1
19 0
20-1 21-
-0 22 1
23 0
+
24 1
V. C. Summer Nuclear Station Core Operating Limits Report
- Cycle 8, Revision 1 1
' 1l',
iv cisumusa CYCLE 8
. SCE4G.
Data for Figure 9 Baseload W(z) at 150 MWD /MTU'-
V. C. Summer - Cycle 8 l
~
Core Heicht 1(D
. Core Height --
W
..1%)
.0000 1.0000 6.0800.
1.0522-
.1600 1.0000 6.2400
-1.0500
.3200 1.0000:
6.4000 1.0478 ~
.4800:
.1.0000
-6.5600
'l.0454
.6400 1.0000 6.7200 1.0426~
'8000 1.0000 6.8800 1.0399'
.9600-1,0000 7.0400 -
1.0391 1.1200~
1.0000-7.2000 1.0398.
1.2800 1.0000 7.3600 1.0415 1.4400 1.0000 7.5200 1.0430 -
1.6000
'1.0000.
7 6800 1.0444
~,
1.7600-1.0970
.7.8400 1.0458 1.9200 1.0966 8.0000 1.0472-2.0800 1.0959 8.1600'
!.0485 2.2400 1.0951 8.3200-1.0497L 2.4000 1.0941 8.4300 1.0509 2.5600 1.0929 8.6400-1.0521 2.7200 1~0915-8.8000
.1.0532 2.8800 1.0899 8.9600' 1.0544 3.0400 1.0882 9.1200 l1.0558 3.2000-1.0862-9.2800
.l.0576 3.3600 1.0841 9.4400 1.0596 i
3.5200 1.0818 9.6000.
1.0613 3.6800 1.0797 9.7600-
'l.0630' 3.8400 1.0779 9.9200 1.0647.
~4.0000 1.0763-10.0800 1.0662
^
4.1600-1.0748 10.2400.
1.0675 4.3200-1.0732-10.4000 1.0000 -
1 4.4800' l.0715
-10.5600 1.0000 4.6400-
- 1. % 96 10.7200:
l.0000~
I
'4.8000
- 1. % 76 10.8800 1.0000
~
~i 4.9600 1.0655-11.0400' l.0000 :
5.1200-
-1.0632 11.2000 1.0000 5.2800 1.0609 11.3600 1.0000.
5.4400 1.0589
.I1.5200
'1.0000.
-j 5.6000-1.0575 11.6800-1.0000 U
- 5.7600-1.0559.
I1.8400
'l.0000 1
.5.9200 1.0541 12.0000-1.0000=
V. C. Summer Nuclear Station -
Core _ Operating Limits Report 18 Cycle 8, Revision 1 -
1
____,__::c l
' V. C. SUMMER CYCLE 8 scuo Data for Figure 10 Baseload W(z) at 8000 MWD /MTU V. C. Summer - Cycle 8 Core Heicht
.._(Z)
Core Heicht
.%'[ZJ W
.0000 1.0000 6.0800 1.0490
.1600 1.0000 6.2400 1.0465
.3200 1.0000 6.4000-1.0452
.4800 1.0000 6.5600 1.0457
.6400 1.0000 6.7200 1.0462
.8000 1.0000 6.8800 1.0467
.9600 1.0000 7.0400 1.0481 1.1200 1.0000 7.2000 1.0497 1.2800 1.0000 7.3600 1.0508 1.4400 1.0)00 7.5200 1.0519 1.6000 1.f'J00 7.6800 1.0529 1.7600 1.1087 7.8400 1.0537 1.9200 1.1074 8.0000 1.0545 2.0800 1.1058 8.1600 1.0557 2.2400 1.1039 8.3200 1.0578 2.4000 1.1017 8.4800 1.0603 2.5600 1.0992 8.6400 1.0628 2.7200 1.0965 8.8000 1.0653 2.8800 1.0935 8.9600 1.0677 3.0400 1.0902 9.1200 1.0700 3.2000 1.0867 9.2800 1.0721 3.3600 1.0829 9.4400 1.0740 3.5200 1.0797 9.6000 1.0759 3.6800 1.0774 9.7600 1.0776 3.8400 1.0762 9.9200 1.0792 4.0000 1.0750 10.0800 1.0807 4.1600 1.0736 10.2400
.l.0821 4.3200 1.0722
'10.4000 1.0000 4.4800 1.0707' 10.5600 1.0000 4.6400 1.0690 10.7200 1.0000 4.8000 1.0672 10.8800 1.0000 4.9600 1.0653 11.0400 1.0000 5.1200 1.0632 11.2000 1.0000 5.2800 1.0611 11.3600 1.0000 5.4400 1.0589 11.5200 1.0000 5.6000 1.0565 11.6800 1.0000 5.7600 1.0542 11.8400 1.0000 5.9200 1.0517 12.0000 1.0000 V. C. Summer Nuclear Station Core Operating Limits Report 20 Cycle 8, Revision 1
9 f :...
~
- 4
= V. C. SUMMER CYCI.E 8 scuo I
' 1 Data for Figure 11
' Baseload W(z) at 16000 MWD /MTU
+
V. C. Summer J Cycle 8 -
Core Heicht
. {Z)
. Core Heigh't WCQ W
.0000 1.0000 6.0800-1.0598
.1600 1.0000
~ 6.2400 -
1.0617-
'.3200 1.0000 6.4000
,1.0632<
j
.4800 1.0000-6.5600 1.0645'
.6400 1.0000.
'6.7200 1.0656-
.8000.
-1.0000 6.8800 -
1.0664 -
.9600" 1.0000
.7.0400 1.0669 1.1200 1.0000.
7.2000 -
- 1. % 72 i
1.2800 1.0000-7.3600 1.%73 -
1.4400
= 1.0000 7.5200 1.0674' 1.6000 1.0000 -
7.6800 '
1.0668'
]
-1.7600
'l.1438 7.8400
'l.0661:
,1.9200 1.1394 8.0000
- 1.0681-2.0800 1.1344.
8.1600-
.1.0720.
-l 2.2300-1.1289 8.3200 1.0759-2.4000 1.1228
-8.4800-1.07% :
2.5600 1.I164 8.6400
-1.0832 2.7200-1.1094-8.8000 1.0867:
1 2.8800
~1.1022
.8.9600 1.0894 3.0400 -
1.0949 9.1200 1.0933 c 3.2000 1.0869 9.2800 1.0974
.3.3600 1.0794 9.4400 1.1017 l
3.5200 1.0766 9.6000 1.1054~
i 3.6800
-1.0760 9.7600
-1.1088
- i 3.8400 1.0751 9.9200 '
l.Ii19 -
J L 4.0000 -
1.0741 10.0800
.1.1145 4.1600 1.0730 10.2400 1.I166 -
4.3200 -
1.0718
-10.4000 1.0000 4.4800.
1.0704 10.5600 1.0000-4.6400
-1.0688.
10.7200
-100001
. :j
'4.8000.
1.0671 10.8800
-1.00001 l
~ 4.9600.
1.0653 11.0400 1.0000 -
-5.1200 1.0633 11.2000-1.0000
'.5.2800 1.0613
.I1.3600=
1.0000 i
5.4400-1.0588 11.52001
- 1.0000 L 4
-5.6000' l.0563-111.6800.
1.0000 j
5.7600~
1.0561.
11.8400'-
1.0000-y 5.9200 1.0577 12.0000 1.0000:
y 1
1 i
V. C. Summer Nuclear StationL-d Core Operating Limits Report f
22 Cycle 8, Revision 1
~
c-.
J-
i V. C. SUMMER CYCLE 8 SCEAQ 4
Figure 12 RCS Total Flow Rate vs. R for Three Loop Operation V. C. Summer - Cycle 8 MEASUREMENT UNCERTAINTIES OF 2.1% FOR FLOW AND 4.0% FOR INCORE MEASUREMENT OF F"a ARE INCLUDED IN THIS FIGURE 29 i
~
28.8 h
ACCEPTABLE UNACCEPTABLE
^g OPERATION REGION OPERATION REGION
~
h 28.6 -
w h
100 %
~
d (1.00.28 46) '
p gg 4 99 5 % RTP q
(1.00.28.39)
M 99 0% RTP
[
(1.00,28 32) 9a s% aTP SEE NOTE y
(1.00,28.25) g 28.2 sa n m (1.00.28.18)
U
~
(1.00,28.11) s
~
Qll 28
~
37,g i
.9
.95 1
1.05 1.1 R = F"w/F""all.0+ PF (1.0-P)]
a NOTE: When operating within this region, the following is requiredt 1.
The restreeted power level shall be considered to be 100% of rated thermal power (RTP) for L
Twhnu mi Specification ngure 2.1 1 and the Rod Group Insertion Limits defined in Section 2.3 of the COLR.
2.
Nortnal T, at the restricted power level shall be considered T,., at RTP for the OTAT and OPAT trips and rod contrui.
3.
Imp ATs shall indicate 100% st the restricted power level.
V. C. Summer Nuclear Station Core Operating Limits Report 24 Cycle 8, Revision 1
.