Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Rev 0 to Operational QA Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML033490529  + (Rev 0 to Oconee, Unit 1, Fourth Ten-Year Inservice Inspection Interval Plan, General Requirements, ISI Examination Listing and Schedule)
  • ML18036A591  + (Rev 0 to Odcm)
  • ML20098D945  + (Rev 0 to Off-Normal (on) Procedure ON-123, Mispositioned Control Rod)
  • ML20098D950  + (Rev 0 to Off-Normal (on) Procedure ON-123 Bases, Mispositioned Control Rod)
  • ML20087L774  + (Rev 0 to Offsite Dose Calculation Manual)
  • ML20079J942  + (Rev 0 to Offsite Dose Calculation Manual)
  • ML20116E607  + (Rev 0 to Offsite Dose Calculation Manual)
  • ML20137M271  + (Rev 0 to Offsite Dose Calculation Manual)
  • ML20138F337  + (Rev 0 to Offsite Dose Calculation Manual)
  • ML20245L765  + (Rev 0 to Offsite Dose Calculation Manual)
  • PY-CEI-NRR-0196, Rev 0 to Offsite Dose Calculation Manual  + (Rev 0 to Offsite Dose Calculation Manual)
  • ML18155A229  + (Rev 0 to Offsite Dose Calculation Manual)
  • ML18038A135  + (Rev 0 to Offsite Dose Calculation Manual. W/Two Oversize Figures &)
  • ML20235R248  + (Rev 0 to Offsite Dose Calculation Manual for TU Electric Comanche Peak Steam Electric Station)
  • ML20117L005  + (Rev 0 to Operability Assessment for Transient Conditions in Pbnp Svc Water Sys During Coincidental LOCA & Loop,Safety Related)
  • ML20140J234  + (Rev 0 to Operability Determination Processing)
  • ML13310A926  + (Rev 0 to Operating Instruction SO1-4-33, Post-Accident RCS Vent Sys Operation)
  • ML20064N328  + (Rev 0 to Operating Parameter Uncertainties for Byron/ Braidwood Revised Thermal Design Procedure)
  • ML17301A052  + (Rev 0 to Operating Procedure 0030119, Post-Trip Review)
  • ML20207C324  + (Rev 0 to Operating Procedure OP 262, Unit 1 Verification Program)
  • ML20207E454  + (Rev 0 to Operating Procedure OP 263, Unit 1 Validation Program)
  • ML20141G818  + (Rev 0 to Operating Procedure OP 3263, Unit 3 Duty Officer Requirements After Trip or ESF Actuation)
  • ML20212P860  + (Rev 0 to Operating Procedure Ogr 1.0, Coordinating Group Charters & Meetings)
  • ML20045C790  + (Rev 0 to Operating Procedure TVA-EOP-6, Insp of Intermediate Deck Doors)
  • ML20216E329  + (Rev 0 to Operation of Alpha Radiation Survey Meter)
  • ML20091A694  + (Rev 0 to Operations Dept Procedure ODP-ZZ-00015, Reactor Trip Review)
  • ML20203M798  + (Rev 0 to Operations Engineering Procedure OEP-9.04Q, Personnel Certification Procedure for Visual Exam Per ASME Boiler & Pressure Vessel Code,Section XI)
  • ML20203M800  + (Rev 0 to Operations Engineering Procedure OEP-9.05Q, VT-3 Visual Exam of Component Supports)
  • ML20203M804  + (Rev 0 to Operations Engineering Procedure OEP-9.06Q, VT-4 Visual Exam of Component Supports)
  • ML20133H799  + (Rev 0 to Operations Manual PAP-1309, Shipment of Radwaste for Disposal)
  • ML20126C071  + (Rev 0 to Operations Manual,Section H7.3, Integral Welded Attachment Evaluation Criteria for Prairie Island Nuclear Generating Plant)
  • ML20073E917  + (Rev 0 to Operations Plan for Marine Transportation of Fuel Shipment from Shoreham,Ny to Eddystone,Pa)
  • ML20140G962  + (Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded)
  • ML20140G974  + (Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded)
  • ML20236E291  + (Rev 0 to Organization or Operations Procedudesign Responsibility Field Vs Ofc, TVA Employee Concerns Special Program)
  • ML20113B367  + (Rev 0 to Outage ISI Exam Results (H1RFO 06,Rev 2) Completed Components First Interval,Third Period,Second Outage for May 1996)
  • ML20216J412  + (Rev 0 to Outage ISI Exam Results (H2RFO 7) XCSAYKPPJHNO2TDRMLEB Status Component First Interval,Third Period,Third Outage)
  • ML20113D327  + (Rev 0 to Outline for Sampling,Preparation & Testing of Spot-Welded Superstrut Members for Diablo Canyon Power Plant)
  • ML20079E792  + (Rev 0 to Overpressure Protection Rept)
  • ML20079E779  + (Rev 0 to Overpressure Protection Rept)
  • ML20101F181  + (Rev 0 to Overtemp Delta Temp Scaling,Westinghouse NSSS Process Control Sys)
  • ML20209A713  + (Rev 0 to Oyster Creek Core Spray Sys Insp Program)
  • ML19324B811  + (Rev 0 to Oyster Creek Cycle 12R Outage IGSCC Activities)
  • ML20128B742  + (Rev 0 to Oyster Creek Nuclear Generating Station Structural Evaluation of Spent Fuel Pool)
  • ML16222A521  + (Rev 0 to Oyster Creek Nuclear Generating Station Containment Spray Sys Assessment Re Postulated Collapse of Reactor Bldg Southeast Stairwell Masonry Walls)
  • ML20072Q425  + (Rev 0 to Oyster Creek Nuclear Generating Station Sea Turtle Surveillance,Handling & Reporting Instructions for Operations Personnel)
  • ML17229A514  + (Rev 0 to PCM 97055, St Lucie Unit 1,Cycle 15 Colr)
  • ML17229A946  + (Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr)
  • ML20070F072  + (Rev 0 to PCS-GSR-001, AP600 Passive Containment Cooling Sys Design Basis Analysis Model & Margin Assessment)
  • ML20216B817  + (Rev 0 to PE-9778-1, Test Rept-Grinnell Hydraulic Snubber Freedom of Motion Test Under Duke Powers McGuire Nuclear Station MSLB Accident Temp Condition)