Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A585 + (Rev 0 to ADM-29.01, IST Program for Pumps & Valves)
- ML20155C958 + (Rev 0 to ADN-BFN-1006V0, Procedure for Compliance with USNRC Regulatory Guide 1.150)
- ML20248B922 + (Rev 0 to AES 98033327-1-1, Updated Probabilistic Operational Assessment for SONGS Unit 2,Second Mid Cycle Operating Period,Cycle 9)
- ML20086T103 + (Rev 0 to ALPHA-510, Panda Facility Characterization Heat Loss & Selected Sys Lines Pressure Loss Test Plan & Procedure)
- ML20096F405 + (Rev 0 to ALPHA-520, Panda Transient Tests M3 & M4 Integral Sys Test Procedure)
- ML20096F431 + (Rev 0 to ALPHA-521, Panda Transient Tests M7 Integral Sys Test Procedure)
- ML20096F441 + (Rev 0 to ALPHA-527, Panda Transient Tests M2,M10A & M10B Integral Sys Test Procedure)
- ML20096F470 + (Rev 0 to ALPHA-528, Panda Transient Tests M9 Integral Sys Test Procedure)
- ML20096F451 + (Rev 0 to ALPHA-529, Panda Transient Tests M6/8 Integral Sys Test Procedure)
- ML20113B386 + (Rev 0 to ALPHA-608, Panda Transient Tests M2 Integral Sys Test Apparent Test Results)
- ML20113E730 + (Rev 0 to ALPHA-609, Panda Steady-State Tests Data Transmittal Rept)
- ML20135D259 + (Rev 0 to ANO Unit 2 Projected End of Cycle 12 Circumferential Crack Population)
- ML20153H165 + (Rev 0 to ANO Units 1 & 2 Technical Requirements Manual)
- ML20129A649 + (Rev 0 to ANO-1 Cycle 14 Colr)
- ML20198T112 + (Rev 0 to AP-404, Loss of Decay Heat Removal)
- ML20198T135 + (Rev 0 to AP-520, Loss of RCS Coolant or Pressure)
- ML20134A590 + (Rev 0 to AP600 Engineering Data Base Access & Control)
- ML20134A606 + (Rev 0 to AP600 Plant Instrumentation & Control Sys)
- ML20134A615 + (Rev 0 to AP600 Quality Assurance Procedures Supporting NRC Review of AP600 SSAR Sections 18.2 & 18.8)
- ML20140D069 + (Rev 0 to AP600 Shutdown Evaluation Rept)
- ML20059G508 + (Rev 0 to APA-ZZ-01003, Odcm)
- ML20197H321 + (Rev 0 to AR-490, Reactor Coolant Sys Boration)
- ML20077F596 + (Rev 0 to AS-50092, QA Program for Simplified Bwr)
- ML20097G085 + (Rev 0 to ASME Code Case N-481 Evaluation of Arkansas Nuclear One Unit 1 Reactor Coolant Pumps)
- ML20141D987 + (Rev 0 to ASME Code Evaluation of Braidwood Unit 2 Nozzle F to Include Effects of Proposed Grindouts)
- ML20079G422 + (Rev 0 to ASME Code Section XI Inservice Insp & Testing Program)
- ML20154Q751 + (Rev 0 to ASME Section XI Preservice Insp Plan)
- ML20205P461 + (Rev 0 to ASME Section XI Pump & Valve Test Programs - Units 1 & 2,Second 10-Yr Interval)
- ML20206N885 + (Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval)
- ML20245B297 + (Rev 0 to ASNT-CP-IRRSP-1A, Asnt Certification Program for Industrial Radiographer Radiation Safety Personnel)
- ML19354D503 + (Rev 0 to ATWS Mitigation Sys Design for Zion Station Units 1 & 2)
- ML20155C075 + (Rev 0 to Abnormal Operating Procedures 18038-2, Operation from Remote Shutdown Panels)
- ML20077F861 + (Rev 0 to Abnormal Procedure AP-530, Natural Circulation)
- ML20210B114 + (Rev 0 to Acceptance Test Procedure 1CP-AT-27-1, Condenser Vacuum & Waterbox Priming)
- ML20134L238 + (Rev 0 to Accident Analysis)
- ML20202A833 + (Rev 0 to Accident Analysis Methods for Application to Salem Nuclear Units)
- ML20129D596 + (Rev 0 to Action Plan 10, Review of Operation of Porv)
- ML20129E164 + (Rev 0 to Action Plan 16, Rept on Main Steam Header Pressure)
- ML20129D607 + (Rev 0 to Action Plan 18, Startup Feed Valve SP-7A Problem Analysis)
- ML20129D574 + (Rev 0 to Action Plan 1C, Auxiliary Feed Pump Turbine Manual/Auto-Essential Control Problem)
- ML20129D635 + (Rev 0 to Action Plan 26, Inadvertent Auxiliary Feedwater Pump 1 Suction Supply Transfer from Condensate Storage Tank to Svc Water Supply)
- ML20116C129 + (Rev 0 to Action Plan to Address Fuel Loading Incident at Plant)
- ML20129D523 + (Rev 0 to Action Plans 5,6 & 7, Low Steam Generator Level Trip of Steam & Feedwater Rupture Control Sys)
- ML20116B601 + (Rev 0 to Addendum a to Piping Stress Rept, for Unit 1)
- ML20096D490 + (Rev 0 to Addendum to Plant-Unique Analysis Rept (Dtd 821001) on Safety Relief Valve Actuation Concurrent W/Loca (Cases C3.2 & C3.3))
- ML20100K827 + (Rev 0 to Adequacy of TMI-1 Once-Through Steam Generator Return to Svc Safety Assessment After 1984 Tech Spec Eddy Current Test Exam)
- ML20082E622 + (Rev 0 to Administrative Change Notice 01 to ES03.03, Cable & Raceway Control & Tracking Sys)
- ML20082E600 + (Rev 0 to Administrative Change Notice 02 to ES03.03, Cable & Raceway Control & Tracking Sys)
- ML20082D972 + (Rev 0 to Administrative Change Notice 03 to ES03.03, Cable & Raceway Control & Tracking Sys)
- ML20138J056 + (Rev 0 to Administrative Control Procedure ACP 6.15, Consisting of Nuclear Engineering & Operations Procedure Neo 8.02, Post-Trip & Transient Review)
- ML20206Q373 + (Rev 0 to Administrative Controls Procedure ACP 8.09, Millstone Licensed Operator Requalification Programs)