-_.

Proc *du'. N3

- Approv.i Vogtle Electric Generating Plant 18038-2 NUCLEAR OPERATIONS p,,,,,,n g,,

e Georgia Power a.or g.f u 2

9g s

uni, ABNORMAL OPERATING PROCEDURES l

l OPERATION FROM REMOTE SHUTDOWN PANELS PURPOSE l

Thisprocedure$rovidesoperatorinstructionsinevacuating the Main Contro Room, maintaining hot standby, and attaining cold shutdown from the remote shutdown panels.

This procedure is applicable with or without the availability of offsite power.

This procedure also i

addresses potential or actual component failures which may be induced by Control Room fire events.

SYMPTOMS The Main Control Room is or is about to become inaccessible due to fire, toxic gas, or any other unforeseen reasons.

h 30 000929 p$dOO[fjCK OSoco4p4 PNU l

mes av

e e

l 1

I i

t i

i 1

l l

l t

i i

i i

1 4

1 F

l

-WORKING COPY I

VERIFY TO LATTST CD'.TT. -_ ' ! I 7 F EV'S!CP4

'l SIGN ATUS E DATE r{iN ARIRE DATE I

I i

[

i l

.i i

I i

I l

s

)

N l

'l

PROCEDU E NO.

REVI5loN PAGE No.

VEGP 18038-2 0

2 of 47 ACTION /EXPECTELRESPdNSE RESPONSE NOT OBTAINED IMMEDIATE OPERATOR ACTIONS i

1.

Manually trip the reactor NOTE e Step 2 or 3 should be done prior to Control Room evacuation IF personnel safety is NOT hindered, e 19000-C REACTOR TRIP AND SAFETY INJECTION should NOT be implemented IF the Control Room is evacuated.

1 SUBSEQUENT OPERATOR ACTIONS 2.

11' a Control Room fire, and aI discretion of Unit Shift Supervisor THEN:

a. Shift CCP suction to RWST -
1) OPEN LV-112E and/or LV-112D
2) Shut LV-1125 and/or LV-112C
b. Shut PRZR PORY bloc'-

valvas

c. Stop RCPs 1 and 4.
d. Isolate Main Feedwater SHUT:

e MFIVs e,

BFIVs

e. Shut SG blowdown isolation valves.

' f. Shut MSIVs and bypass valves.

g. Throttle total AFW to minimum - GREATER THAN 570 gpm.

mun

PMcCEOCE NS REVISloN PAGE No.

VEGP 18038-2 0

3 of 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED i

3.

IF NOT a Control Room fire or at discretion of Unit Shift Supervisor, THEN l

a, Verify turbine trip.

r

b. Align VCT for AUTO makeup l

e HS-40001A in AUTO e

HS-400015 in AUTO-AFTER-START i

4 e

FIC-110 pot set at j

8.6.

i e

LV-112A in AUTO 1

e PV-131 in AUTO 1

i

c. Place PRZR pressure control in AUTO.

I

d. Place SG pressure control in AUTO.

e SG ARVs in AUTO.

I o

Steam Dumps in STEAM PRESSURE m(de.

e. Throttle total AFW flow I

to minimum - G UATER THAN 570 gpm.

i n

1 1

1

.l 1

I

\\

l i

j w.,

e

~

PRoCEDU..E NJ.

LEVISloN PAGE No.

VEGP 18038-2 0

4 ef 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED NOTE If at any time the Control Room becomes habitable, recovery should commet.ee at Step 65 of this procedure.

CAUTION If Control Room is evacuated due to fire, shut down Panel A controls and instrumentation may not be celiable.

Train B is preferable for Control Room fire event operation.

Fire Event qualified instrument.ition is marked in red.

4.

Send operators to the 4.

If insufficient personnel following locations to are available, use the perform applicable actions following priority:

of Steps 6 through 9:

a. Shutdown Panel B.
a. Shut down Panel B.

e Unit Shift Srpervisor e Reactor Operator e Extra Shift Personnel

b. Shut down Panel A.
b. Shut down Panel A.

e BOP Operator,

c. Shut down Panel C AFW
c. Shut down Panel C AFW Pumphouse.

Pumphouse.

e Outside Area

Operator,
d. TSC - ERF Terminal
d. TSC - ERF Terminal, e OSOS e STA 5.

Upon exiting Control Room, isolate shutdown sound-powered phone sys nn from the Control Room.

(located outside east entrance to Unit 1 Control Room) wo

PMoCEDumE No.

MEVi$loN PAGE No.

VEGP 18038-2 0

5 of 47 ACTION /EXPECTEDRESPdNSE RESPONSE NOT OBTAINED CAUTION t

If an SI actuation occurs, any components previously transferred to the Shutdown Panels must be manually 3

actuated by the operator.

Diesel Generator sequencing is also disabled for any load previously transferred to the Shutdown Panels.

All other components should realign to the safety configuration.

t 6.

Verify reactor is tripped.

6.

Trip the reactor:

e Reactor trip and bypass e

HS-40002A - Panel A breaker - OPEN.

1 e

Neutron flux - LOWERING.

e HS-40002B - Panel B

-OR-t Locally open Reactor Trip and Bypass Breakers.

(Control Building, Room RB-07)

-OR-Place the Rod Drive MG sets Motor and Generator Circuit Breakers in TRLP position.

i

[

i t

I l

r i

r GM4%

t

enocsouRE No.

REVISr$N PAQtNO.

VEGP 18038-2 0

6 of 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED i

7.

IF a Control Room fire.

7.

IF NOT a Control Room fire, TREN perform following:

IMEN place transfer switches f

to LOCAL when required by

a. At Shutdown Panel As procedural steps.

h e

ENSURE Aux. Spra, Valve HV-8145 is

shut, THEN place transfer switch to LOCAL.

e ENSURE control switches with orange I

dots are aligned properly, THEN place all transfer switches to LOCAL.

b. At Shutdown Panel B:

I e

ENSURE control switches with orange dots are aliped r

THEN place properly,fer switches all trans to LOCAL.

{

c. THEN place all transfer switches on 2AA02-00 to LOCAL.

t

d. THEN place all transfer switches on 2BA03-00 to l
LOCAL, NOTE 91000-C EMERGENCY CLASSIFICATION AND IMPLEMENTING PROCEDURE should be implemented at this time.

8.

Establish communications 8.

All stations on same between all stations,

channel, i

(Preferably sound powered telephones remote shutdown channel, red box) 70344%

m,,.,--,

-~,-- _ _ -.. _. _ __,, _ _ _ _ _-,_,, - -

, _ _ _ _. - _....., _ _ - _. - -. - -I

g 4

A '#

$0 l

+s s

'u

\\9 S'O Vd9 TEST TARGET (MT-3)

' '6 ', 't A

IMAGE EVALUATION c/f

'i e' t

\\\\\\\\\\/////i

//jr q

'y' ypq 4+

+

4e 1.0 E "> l'1 t.. "'i

-22 E ?!;

b It

[j22 j,l m

,m a ta 1522 1.25 1.4 Idem L6 sm

es 4.

150mm 4

6"

$S

/$h

' kV

, h

/$%

djlg/;d/i If

'g' q

. 4f($

Op s,'+

.I

g, p ' ' l+

lo s+.s.

6. e.

\\9 ^5 ' e'0U.,,:,^$2 TEST TARGET (MT-3)

/

/,,LP'

'A, IMAGE EVALUATION c) s

/////

/,,

e.,

\\fff7 k

k

?

4 l.0 l? "

'\\

,,,n 22 u

-1 9 s

}

l,l Lt2

!:U B 6;a I l.25 N l.4 91.6, l

\\ aan nn

.. c 4

150mm 4 --

6"

~*

D

'?

A~ 24

?:S 4'g g

zzxs e

/

eq

,4, y

o o-e y

/

A L,1, do

-v e ' c) e

't y',,, ?,, h S

IMAGE EVALUATION

\\h V -

R\\f/*S'"^"h' 4ft TEST TARGET (MT-3)

[

?

5 n 4

g, gy'/,/

4 ge

%> y

<s ~

I.0 l

"a my t.

i.

l: [. ' 1 : 2o I l 1.1 l l==

B_L8, l I.25

!e!! l.4, 91.6 imm L=

l 4

150mm -

4 6"

A 4,,e Qp v

5 s q' o)y,,

s; +

PROCEDURE No.

REVISloN PAGE No.

VEGP 18038-2 0

7 of

  • -7 ACTION / EXPECTED RESPONSE RESPONSE NOT ObTAINED CAUTION If a loss of offsite power occurs, the NSCW pump should be started immediately after the diesel generators have restored power to the bus.

9.

Locally verify AC 9.

Attempt to energize any Emergency Buses 1AA02 unenergized bus from and 2BA03 - ENERGIZED

') referred sources using by observing 4160 volt handswitch on 2AA02-00 or meter on each bus.

2BA03-00.

IF any Emergen:y Buses cannot be energized frot preferred normal source, THEN start a diesel generator on that bus using Attachment B.

l e

f j

j i

)

e PMocEDURE No.

MEVISloN PAGE No.

VEGP 18038-2 0

8 of 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED i

CAUTION Shutting SG ARVs by opening 2AY2A or 2BYC1 and 2

shutting MSIVs and MSBVs by opening 2AD12 or 2BD12 will require secondary pressure control using Main Steam Code safeties unless initiating Attachment G l

f to locally control SG pressure, I

l 10.

IF a Control Room fire, THEN send operator to:

a. Trip the following 4

breakers in Table:

f Bre aker No.

Location Significant Equipment Actions l

2BD12-08 Control Bldg., RB-36 e Shuts MSIVs e Shuts MFIVs e Shuts BFIVs i

2BD12-03 Control Bldg., RB-36 e Shuts MSBVs e Isolates RMW to VCT blender 2AD12-06 Control Bldg., RB-29 e Shuts MSIV o Shuts MFIVs e Shuts BFIV 2AD12-03 Control Bldg.. RB-29 e Shuts MSBVa e Isolates RMW to VCT blender 2BYC1-10

, Control Bldg., RB-18 e Shuts SG ARV PV-3010 i

2BYCl-12 Control Bldg., RB-18 o Shuts SG ARV PV-3020 s

b. Transfer switches on following SWGR to LOCAL:

e 2BB06 (Control Bldg, RB-18) e 2BB07 (Control Bldg RB-18) e 2AB05 (Control Bldg RB-04) j e

2AB04 J

(Control Bldg. RB-04) e 21B16

]

(Control Bldg. R223) e 2AB15 (Aux. Bldg, RD-104) 7C3441

Pf4oCEDUME No.

REVISION PAGE No.

VEGP 18038-2 0

9 of 47 ACTION /EXPECTEDRESPdNSE RESPONSE NOT OBTAINED

c. Trip the following breakers in Table Breaker No.

Location Significant Equipment Actions 2AY2A-17 Aux. Bldg., R149 e Shuts SG ARV PV-3000 2AY2A-18 Aux Bldg., R149 e Shuts SG ARV PV-3030 i

CAUTION Train B is the preferred pressure train.-

l 11.

Control PRZR pressure 11.

IF pressure less than 2220

~ ig AND lowering between 2220 and 2260 ps psig:

WEN:

i

a. Operate backup heaters
1) Verify PRZR PORVs PV-455A on Panel A or Panel B.

on Panel A and PV-456A on Panel B - SHUT

b. Operate PRZR sprays t

on Panel A.

IF NOT, THEN manually I

shut,
c. Ensure at least one PRZR PORV block valve IF any valve can NOT be HV-8000A on Panel A or
sEut, MV-80008 on Panel B -

THEN manually shut its j

OPEN.

SIock valve.

HV-8000A on Panel A or i

HV-8000B on Panel B.

I

-OR-Trip Breaker 4 on 2ADlM i

for PV-455A or Breaker 4 on 2BDlM for PV-456A.

(located in Control Bldg.,

4 Room RB-29, RB-36) 1 p

PftOCEDtf.E No.

CEVISloN PAGE No.

VEGP 18038-2 0

10 of 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED

2) Verify PRZR spray valves on Panel A - SHUT IF NOT, THEN manually shut.

IF valve can NOT be shut, THEN stop RCP supplying TEITed valve.

RCP 1 for PV-45SC or RCP 4 for PV-455B on Panel A.

3) Energize PRZR heaters
4) IF PRZR pressure - LESS TRAN 1870 psi or f

continuestofower, THEN perform the following to restore PRZR pressure l

between 2220 and 2260 psig and PRZR level 50% to 707.

1

a. Start additional ECCS
pumps, 4

i

b. Align CCPs to RWST suction.
c. Shut LV-112B or a

LV-1120.

d. OPEN BIT isolation valves.

IF pressure greater than 7760 psig j

THEN:

1) De-energize PRZR heater on Panel A and Panel B.

l

2) Control pressure using normal sprays on Panel A.

I IF normal PRZR spray NOT

- ~ ~ ~

ii7ailable, AND letdown is in service, TREN use auxiliary spray HT1145 on Panel A.

IF auxiliary spray NOT Ivailable, l

THEN use PV-455 on Panel A Br PV-456A on Panel B.

  • c3a45
  • MocEDUZE No.

QEVID8N PAGE No.

VEGP 18038-2 0

11 of 47 ACTION /EXPECTEDRESPdNSE RESPONSE NOT OBTAINED

. CAUTION The AFW pumps and throttle valves will NOT respead to automatic signals after control has been transferred.

12.

Control SG 1evel(s) at 12.

Initiate Attachment A, l

50% NR (60% WR) on all Turbine Driven AFW pump

SGs, operation from Panel C.
a. On shutdown Panel A:

Go to step 13.

e Start MD-AFW Pump A 5

e Throttle TV-5139 and FV-5137 4

e Verify miniflow FV-5155 - OPEN.

l

b. On shutdown Panel B:

3 e

Start MD-AW Pump B e

Throttle TV-5134 and FV-5132 1

e Verify miniflow l

FV-5154 - OPEN.

13.

At the discretion of the Unit Shift Supervisor, locally shue air supply to

~i SGBD solenoid rack and open air supply drain valve to shut SGBD valves.

(Aux.

Bldg. Penetration Room, 2

RB-130) e HV-7603A l

e HV-76035 e

HV-7603C j

e HV-7603D 14.

IF both MDAFW pumps are available, THEN locally stop the TDX?W pump using Attachment A.

)

9 1

t 4 344%

F ROCEDU.-.E NO.

REVISloN PAGE No.

VEGP 18038-2 0

12 of 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED l

l CAUTION Shutting MSBV's by opening 2AD12-03 and 2BD12-03 will isolate RMW to VCT blender.

15.

Verify RCS temperature.

15.

IF temperature is less than STABLE AT OR TRENDING TO 557'T and lowering 557'F.

THEN:

1) Verify SGARVs on Panel A and Panel B are SHUT.

IF.NOT, THEN manually shut.

IF any valve can NOT be Eanually shut.

THEN control RCS 4

3 temperature by initiating Attachment G, Local Operation of the S/G Atmospheric Relief Valves With e Loss of all AC J

Power.

-OR-i Ensure SGARV shut by opening its breaker:

Aux. Bldg. Room R149:

I e

17 on 2AY2A for i

PV-3000 e

18 on 2AY2A for PV-3030 Control Bldg. Room RB18:

i e

10 on IBYCl for PV-3010 t

j; e

12 on 1BYCl for PV-3020 l

l I

i i

mun

PRoCEDUit N3 REVISloN PAGE No.

VEGP 18038-2 0

13 of 47 ACTION /EXPECTEDRESPdNSE RESPONSE NOT OBTAINED

2) IF cooldown continues.

THEN throttle AFW flows to a minimum of 570 gpm until at least one SG level is above 5% NR

3) IF cooldown continues.

TREN shut MSIV's and MSBVs by opening Breakers 8 and 3 on 1AD12 and IBD12.

i

.l (Control Bldg. Rooms RB-29 and RB-36)

IF temperature greater than i

337'F and rising 1

THEN control temperature using SGARVs en Panel A or i

Panel.B.

-OR-Control RCS temperature by initiating Attachment G.

Local Operation of the S/G Atmospheric Relief Valves 4

With a Loss of All AC Power.

e

?

I I

i

)

i 1

.u.,

PROCEDUCE No.

QEvt$loN PAGE No.

VEGP 18038-2 0

14 of 47 i

ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED i

1 NOTE If an SI'ictuation occurs, TSC consultation may be necessary after it is staffed.

4 i

)

16.

IF an SI actuation occurs, j

THEN perform the following

a. Check if ECCS flow
a. Do not reduce ECCS flow.

]-

should be reduced:

Consult TSC when it is l

1 e

RCS subcooling -

staffed.

j GREATER THAN 24*F l

using T-hot and RCS Go to Step 18.

4 i

pressure i

)

e RCS pressure - STABLE 4

OR RISING e

PRZR level - GREATER r

THAN 9%

e Secondary heat sinks Total feed flow to SGs -

l GREATER THAN 570 gpm l

.OR-SG NR level - GREATER THAN 5%

i 1

j i

~

3 s

I l

1 4

1 l

nu.s 1

I PROCEDURE NO.

REVISION PAGE NQ, VEGP 18038-2 0

15 of 47 i

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE Train B'id the preferred charging train when operating from remote shutdown panels.

b. Reduce ECCS flow by stopping the following equipment.

4 e

1 CCP 4

L e

PDP by locally (Aux.

Bldg. C level Room RC-229) tripping Breaker 2NB21-08.

e S1 Pumps e

RHR Pumps

c. IF preferred normal power is supplying Emergency 4160V Bus, l

THEN stop Emergency DTisel Generators using local emergency stop pushbuttons.

1 i

i l

1 I

l t

I l

l l

1 i

i l

j nun

PROCEDURE No.

MVISioN PAGE No.

VEGP 18038-2 0

16 of 47 l

1 ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION i

)

e LV-112B, 1120, 112D, 112E will NOT reposition on VCT low-low level after they have been transferred to the j

shutdown panels, e PRZR heaters will NOT cut off on low PRZR level after 1

their control has been transferred to the shutdown l

panels.

e When operating from the shutdown panels, Train B is the preferable charging train.

e Shutting MSBVs by opening 2AD12-03 and 2BD12-03 will f

isolate RMW to VCT blender, l

j 17.

Control PRZR level 50% to 70%

j

a. Check CCP suction aligned
a. Align CCP Suction to RWST:

to VCT.

1) At Panel B I

e LV-1125 on Panel A I

OPEN e

OPEN LV-112E l

e LV-112C on Panel B e

SKUT LV-112C OPEN e

LV-112D on Panel A

-OR-j SHUT i

j e

LV-112E on Panel B

2) At Panel A t

SHUT e

Letdown in service e

OPEN LV-112D i

(FI-132B on PSDA) e SHUT LV-1125 Go to Step 17b.

I J

b. OPEN charging isolation valves e

HV-8105 (Panel F) e NV-8106 (Panel A) l l

1 i

j

,w,

PROCEDUCE No.

REVIStoN PAGE NO.

VEGP 18038-2 0

17 of 47 4

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED t

c. IF SI actuated, THEN at discreti'on of i

EhTft stipervisor shut BIT isolation valves i

e HV-8801A (Panel A) e HV-8801B (Panel B) l l

d. Start CCP B on Panel B or CCP A on Panel A l
e. Sto PDP by locally tri ping breaker 2NB l-08 (Aux. Bldg.

Lev.il C Room RC-229),

i l

4 E

}

r

[

1 i

f i

t t

}

l i

i 4

I i

i i

4 l

I i

t j

muss

PRocEDUaE No.

i4Vl51oM PAGE No.

VEGP 18038-2 0

18 of 47 4

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED

f. Send an operator to
f. IF instrument air not 2-FHC-0121 (loca'ted available, outside*PD Pump Room in THEN control PRZF level Aux. Bldg. RC-110) to using either of the maintain PRZR level following:

between 50% and 70%

e Throttle Charging

1) With CCP B running using 2-FHC-0121.

a) Verify mini-flow e

Control seal injection path by shutting 2-1208-U6-134 and e HV-8110 on Panel A throttling OPEN 2-1208-U6-136.

e HV-8111B on Panel B OPEN b) SHUT HV-8438 CCP discharge cross connect on Panel B c) SHUT HV-8485B. CCP B discharge on Panel B d) OPEN KV-8801B. BIT l

discharge on Panel B e) Throttle open MV-01905 (safety grade charging) on l

Panel B as necessary f) At Unit Shift Supervisor's discretion, throttle 2-1208-U6-151. CCP B d!.sch, to seal inj.

filter (located in i

CCP B Valve Gallery).

(flows can be monitored locally on FI-0144B l

or FI-0145B A-level l

Train B Piping Penetration Rooms) i

-OR-NM4%

PRoCEDUmE NO, 4.EVISloN PAGE No.

VEGP 18038-2 0

19 of 47

)

7 i

i e

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED

2) With CCP A running a) Verify mini-flow path e HV-8110 on Panel A OPEN e HV-8111A on Panel B OPEN j

b) SNUT KV-8485A and MV-8106, CCP A discharge valves on Panel A.

c) OPEN HV-8105 charging isolation on Panel B d) OPEN HV-8116, MV-0190A isolation on Panel A f

4 e) Throttle open HV-0190A on Panel A 1

I as necessary, j

f) At Unit Shift Supervisor's discretion, throttle 5

2-1208-U6-152, CCPs disch. to ser,1 inj.

filter (located in CCP A Valve Gallery) t (flows can be monitored locally on FI-01448 or FI-0145B A-level Train B j

Piping Penetration Rooms).

l 4

f i

t 1

i suo

PROCEQQRE No.

REVillON PAGE No.

VEGP 18038-2 0

20 of 47 4

ACTION / EXPECTED RESP 0NSE RESPONSE NOT OBTAINED l

t

g. IF PRZR level can NOT be i

Emintained less'than f

i 88%,

THEN open the following until PRZR level lowers less than 701:

l

[

o Train B head vents i

i e

NV-80958 l

e HV-80965 e

HV-04425 i

1 e

Train A head vents 3

l 1

e NV-8095A I

e HV-8096A j

e NV-044 2A 4

l J

18.

Locally verify at least 18.

Stop all RCPs.

f one ACCW pump - RUNNING.

Isolate letdown by closing LV-459 and LV-460 (Panel A).

i 1

j l

1 i

i i

i i

f 1

)

l i

l r

l r

i M

NNO 1. - -. -

I PMoCEDUnENo.

REVISION PAGE No.

VEGP 18038-2 0

21 of 47 l

4 ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 1

NOTE

(

RCP 4 or RCP 1 should be run preferentially to provide normal PRZR sprays.

19.

Verify at least one 19.

IF offsite power is available RCP - RUNNING, and at least one ACCW pump is in service, THEN:

1

a. Start the RCP Oil Lift Pump.

b Verify PRZR spray valves i

SHUT.

c. After about 2 minutes start the selected RCP.-

IF offsite powet NOT available OR_ ACCW pump NOT in service

.I THEN:

Verify that the RCS is being cooled by natural

]

circulations e

RCS subcooling greater than 50'F.

e SG pressures stabl6 or

lowering, e

RCS hot leg temperatures stable or lowering.

t i

e RCS cold leg temperatures at saturation for SG pressure.

Refer to Attachment F RCS Pressure - Temperature Limits.

Deel

PRoCEDUmE NC.

REVISloN PAGE No.

VEGP 18038-2 0

22 of 47 ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 20.

IF a Control Room fire, TREN pravent spurious actions from occurrf.igt e

Secure Containment Sprays by racking out:

l e

2AA02-14 i

l e

2BA03-14 j

l 5

21.

At the discretion of the l

Unit Shift Supervisor,

[

locally trip SGFPTs at its front standard.

22.

At the discretion of the Unit Shift Supervisor, shut 1

down the following by depressing TRIP on their breakers:

e Both Heater Drain Pumps I

(Turb. Bldg. Level 1) e 2NA04 Brkr 13 e

2NA01 Brkr 12 l

e All but one Condensate Pump (Turb. Bldg. Level l

2) 1

)

e 2NAA Brkr 6 i

e 2NAA B,rkr 5 e

2 NAE Brkr 4 i

t e

All but one Circulating Water Pump (Turb. Bldg.

l level 2) e 2NAA Brkr 4 j

e 2 NAB Brkr 5 7

)

e All River Water Makeup 1

Pumps not required l

l considering requirements of both units.

(River j

Intake) i l

j

$NA01ABrkr2 e

e i

e ANA01A Brkr 3 l

o ANA01B Brkr 11 e

ANA01B Brkr 12 i

i mms

PROCEDURE N8 REVl81oN PAGE No, VEOP 18038-2 0

83 of 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED 23.

At the discretion of the Unit Shift Supervisor, isolate BTRS:

Locally open Brkr 14 on e

2ND32.

(Control Bldg.

Room RB-28) e Locally opsn Brkr 8 on 2ND31.

(Control Pldg.

Room RB-28) 24.

Borate the RCS to a Hot Standby Xenon Free concencrations

a. Detersfne required RCS shutdown margin using Attashment C.
b. Determine actual RCS
b. Go to Step 25.

shutdown margin using 14005, SHUTDOWN MARGIN CALCULATION-LESS THAN REQUIRED.

c. Start Boric Acid Transfer Pump on Panel A or Panel B.
d. Open Emergency
d. If emergency boration Boration Valves path NOT available N N sEIft CCP suction o

HV-8104 - Panel A to RWST to borate RCS:

-OR-Open LV-112D on Panel A or LV-112E on Panel B.

e HV-8439 - Panel B NOTE With one boric acid transfer pump running and flow through HV-8104, RCS boron concentration will increase about 8 ppm / min. Flow through HV-8A39 will increase RCS boron concentration at about 2 pps/ min.

Flow from RWST will increase RCS baron concentration about 1 ppm / min,

e. Term'inate boration when required shutdown margin is reached or PRZR level reaches 852.

,u.,

PAoCEDt ME No.

QEvilloN PAGE NO.

VEGP 18038-2 0

24 ef 47 I

l i

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED l

i e

t

{

r 4

j 25.

IF SI not actuated.'THEN 25.

Return to Step 24.

Eave Chemistry sample TCS

]

and PRZR for boron -

GREATER THAN REQUIRED.

y NOTE l

If boration was stopped due to high FRZR level THEN l

j continue boration as PRZR level lowers during cooTdown.

6 j

)

l 26.

Comnence a cooldown to 26.

Maintain Hot Standby.

l cold shutdown if any ONE Return to Step 12.

l of the fo11 swing occur:

+

}

1 e

Both CST levels lower to less than 340,000 gal (66%) as read on l

LI-5100 (5115).

A e

PRZR level can NOT be controlled less than i

i 85%,

i i

i l

1 I

t

)

l i

1 l

l i

I t

t I

I l

PROCEDURE NO.

REV151oN PAGE NO.

VEGP 180?9-2 0

25 of 47 1

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED I

27.

Borata the RCS to Cold Shutdown Xenon-Free' concentration l

a. Determine required RCS shutdown margin using i

Attachment D.

b. Determine actual RCS
b. Go to Step 28.

l shutdown margin using

)

14005, SKUTDOWN l

MARGli;- CALCULATION-l LESS TRAN REQUIRED.

I j

c. Start Boric Acid I

Transfer Pump on 1

Panel A or Panel B.

i

d. Open Emergency
d. IF emergency boration Boration Valves path NOT available t

r U EN sEfft CCP suction 1

e KV-8104 - Panel A to RWST to borate RCS:

i i

I

)

-OR-Open LV-112D on Panel A l

or LV-112E on Panel B.

e KV-8439 - Panel B.

e. Terminate boration when required shutdown margin is reached or PRZR level j

reaches 85%,

l 28.

IF RCP 1 or i running TREN slightly open one PRZR i

spray valve to equalize i

i boron between RCS and l

1 PRZR.

f i

1, a

l

)

i 1

l I

TMOI i

l 1

PROCEDURE NO.

REVIStoN PAGE No.

VEGP 18038-2 0

26 of 47 ACTION /EXPECTEDRESPbNSE RESPONSE NOT OBTAINED 29.

Raise PRZR level to about 70% using control establish'ed in Step 17.

30.

Turn off all PRZR heaters:

a. Locally open e

2NB08 - Brkr 12 (Control Bldg. RB-33) e 2NB09 - Brkr 05 (Control Bldg. RB-33)

b. Tern off heaters e

HS10459B Panel A e

HS10470B Panel B 31.

Open SGARVs to establish 31.

Locally open SGARVs to a 50'F/hr RCS cooldown establish 50'F/hr RCS rate on the SGs which are cooldown rate using provided with ATW flow.

Attachment G.

32.

Using PRZR spray 32.

IF letdown is in service,

~

depressurize RCS by op'en CVCS Auxiliary Spray using Recommend Heat-up/

W-814 5.

Cooldown Path *25'T curve on Attachment F.

IF letdown is out of service, TREN use one PRZR PORV.

J I

IF PRZR PORV's out of

service, THEN use Rx Head Vents.

I 33.

Adjust AFW flow as 33.

Locally operate AFW pump and 2

required to maintain SG throttle valvas to control J

1evel 881 to 90% actual WR.

SG 1evel using Attachment A.

l (Refer to PTDB Tab 3.4 for ind.'.cated WR and NR l

temperature correlation.)

I Train A Train B l

l e

HV-5134 e

HV-5134 i

e HV-5137 e

HV-5132

)

i

)

men

PR C

.-.E No.

t.Eyl$loN FAGE No.

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 34.

Adjust charging flow to maintain PRZR level' between 50% and 70%.

35.

Monitor and document cooldown using Attachments E and F at least every 30 minutes.

(Convert PRZR pressure to saturation temperature using Attachment F and calculate subcooling using Attachment E.)

36.

At RCS pressure of 1970 psig

a. Block PRZR pressure SI:

e HS-40012B - Panel A HS-40013B - Panel B w

b. Block Steamline Pressure SI:

e HS-40068B - Panel A e

HS-40069B - Panel B NOTE RCP 4 or RCP 1 should be run preferably to provide normal PRZR sprays.

37.

At RCS temperature of 450*F, reduce running RCPs to two:

a. Verify RCPs 1 and 4 -
a. Go to step 38.

RUNNING

b. Stop PCP 2 and 3
  • 14 4 %

j

~PmoctouRE NO.

REVi$loN PAGE No.

VEGP 18038-2 0

28 ef 47 l

t I

1 ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED J

l 38.

Stabilize RCS press,ure l

at 950 psig

a. Vent accumulators by opening the following:

I Train A j

i e

HV-8875A i

e HV-83755 e

HV-8875C 4

e HV-8875D e

HV-0943A l

- OR -

j I

Train B J

e HV-8875E j

e HV-8875F e

HV-88750 o

HV-8875H e

HV-09435 j

j 39.

Continue cooldown using i

sprays and SCARVs:

l i

i l

a. Stabilize RCS pressure l

l at 365 pais.

I

b. Stabilize RCS t

i temperature at less l

l than 350*f.

t

)

f 40.

Rack out the breaker for

(

the non-operating CCP.

i o

Train A, CCP 2AA02 Brkr 13

(

- OR -

o Train B CCP 2BA03 l

l Brkr 13

[

l 1

I i

f mms r

i

Revision PAQs No.

Paccsov,.a No.

1 VEGP 18038-2 0

29 of 47

)

l ACTION /EXPECTEDRESPdNSE RESPONSE NOT OBTAI?!ED s

41.

Rack out the breaker for both SIPS:

l e

Train A SIP 2AA02 Brkr j

16 l

h e

Train 3 SIP 25A03 Brkr f

j 17 i

i NOTE j

S

]

RCP 4 or RCP 1 should be run preferably to provide j

normal PRZR sprays.

I t

q j

42.

Stop all but one RCP.

{

1, l

43.

Locally ensure NV-8804A 43.

Locally open Breaker 5 on l

and HV-8804B are SHUT bus - 2ABB and 2BhB, (located in RHR Mx Rooms T

N locally shut MV-8804A 1

RC-25 and RC-26) an

-88045.

THEN open Breaker 5 on I

F-2ABB and 2858.

(located in Aux. Bldg.

i Room R149 and R147)

[

[

44.

Ensure RRR vent valves HV-10465 and HV-10466 are SHUT by opening Breaker 8 2

on 2ND31.

(located in Control Bldg. Room RB-28) l 45.

Verify two CCW pumps.

45.

Start two CCW pumps.

RUNNING.

(Preferably j

l on Trata B.)

46.

Verify two MSCW pumps 46.

Start two MSCW punips.

l RUNNING.

(Preferably on Train B.)

g 1

47.

Start NSCW cooling tower

)

fan as needed to support RCS cooldown.

l l

DN

PAoCEDURE No.

RsVIElON PAQt No.

j d

VEGP 18038-2 0

30 of 47 I

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 48.

Ensure NSCW tower valves 48.

Manually open valves.

HV-1668A on Panel A and (located in NSCW towers)

HV-1669A'oh Panel B -

OPEN

)

I CAUTION l

a The RHR Loop 1 ard Loop 4 Inlet Isolations (HV-8701A, 87015, 8702A, 87025) will NOT auto close on high RCS i

pressure after control is transferred to the shutdown panels.

I t

NOTT When operating from the shutdown panels, Train B is the preferable RHR train.

i 49.

Establish one train of RHR:

49.

If any preferred RHR train I

ecuipment cannot be placed i

in service, repeat Step 49 l

to place alternate train RER i

J in service.

l l

If no RHR train can be placed i

in service, verify RCP running or maintain natural circulation as in Step 19 j

RNO.

Continue attempts to i

j establish RNR and to to Step 50.

j

]

a. Place RHR Loop Inlet Isolation inverters in l

1 service by initiating 13405, 125V DC 1E i

ELECTRICAL DISTRIBUTION i

SYSTEM:

e 2DD116 - Train B J

(Contcel Bldg. RB-31) l e

2CD115 - Train A i

(Control Bldg. RB-26) j

~,.,

}

M oceovatNo.

neveoN PAQs No.

f VEGF 18038-2 0

31 of 47 7

r ACTION /EXPECTEDRESPdNSE RESPONSE NOT OBTAINED l

i I

i

b. Unlock and close inverter AC output breaker:

e 2DD1I6 - Train B l

e 2CD115 - Train A i

(

c. Unlock and close RHR isolation starter input f

breaker.

1 l

e NV-8702A - Train R e

HV-87015 - Train A l

d. Unlock and close RHR 1

isolation valve breakers 1

(In Control Eldg. Roca t'

i RA-79):

i e

2BRE-13 Train B 1

e 235E-13 Train B (In Control Bldg. Room i

RB-01):

L e

2ABE-15 Train A

(

e 2ABE-15 Train A t

e. Shut RHR Meat Exchanger l

Outlet e

HV-0607 - Train B e

HV-0606 - Train A i

I

f. Shut RHR Heat Exchanger i

)

Bypass:

t i

e TV-0619 - Train B l

e TV-0618 - Train A 1

3

3. Close RHR suction from I

l

)

RWST:

l e

MV-88125 - Train B e

HV-8812A - Train A l

t

h. Open RMR Hot Les Suction:

I l

e NV-8702A - Train B e

NV-87025 - Train 5 t

l e

MV-8701A - Train A e

HV-87015 - Train A

)

)

l

1. Start the RHR pump on f

the selected train.

I<

l i

i j

i t

l7 1

4 l

PROCEDumtNo.

REVllioN PAQt No.

i VEGP 18038-2 0

32 of 47 1

i ACTION /EXPECTEDRESPdNSE RESPONSE NOT OBTAINED

j. Ensure RHR to Cold Leg j

Transfer control and open Isolation open:-

the valves.

i j

e HV-88095 - Train B 1

e HV-8809A - Train A l

l l

k. Slowly adjust RHR heat
k. IP RHR pump flow f

exchanger bypass to Indication is NOT establish a flow rate established, I

of 3000 gpm, THEN place THEN stop the applicable j

in AUTO KHR~ pump and place other train in service by returning to Step 49.

I e

TV-0619 - Train B e

FV-0618 - Train A IF RNR flow rate can NOT i

Ee controlled less than 4500 spa, THEN stop the applicable 4

E pump and place other train in service by I

l returning to Step 49.

l I

1 l

1. Slowly adjust RHR heat
1. IF instrument air is NOT l

)

exchanger outlet to Evailable i

establish a 50*F/hr RCS THEN contro),cooldown rate cooldown rate.

Ey Tocally throttling RHR j

r pump discharge 1

e HV-607 - Train B e

HV-600 - Train A e

2-1205-U4-020 - Train 3 i

e 2-1205-U4-019 - Train A j

(located outside RHR Hx Rooms in Aux. Bldg.

j Rooms RC-38 and RC-27)

I 1

i i

l' l

i 1

r i

4 i

j i

PHocEDU AE No, CEmsloN PAGE No.

VEGP 1803P-3 0

33 of 47 ACTION / EXPECTED RESPdNSE RESPONSE NOT OBTAINED l

.=, ess CAUTION Do NOT attempt to take RCS solid from the shutdown panels.

50.

IF PRZR level rises to

~Feater than 88%

g WEN:

a. IF one train of RHR in
a. IF RHR not in service, service, stop the last do not stop RCP, continue RCP.

with Step 50b.

b. Stop the CCP.
c. Shut letdown isolation valves:

e LV-460 - Panel A e

LV-459 - Panel A

d. Shut charging isolation valves:

e HV-8147 - Panel B e

KV-8146 - Panel A 51.

IF a Control' Room fire and at the discretior, of the Unit Shift Supervisor, THEN prevent spurious

actions,
a. Verify TV-12725 is -
a. Open TV-12725 by OPEN.

(located in initiating 13744, ESF Control Bldg. Room RB-17)

CHILLED WATER SYSTEM.

b. IF CBCR ESF Chiller room temperature rises to an uncomfortable
level, THEN provide it temp'orary ventilation.

t nus

PRocEQVRE NJ

..EVl5loN PAGE No VEGP 18038.2 0

34 cf 47 ACTION / EXPECTED. RESPONSE RESPONSE NOT OBTAINED 52.

IF PRZR level rises to greater than 88% with charging and letdown out of service, THEN open the following reactor head vent valves until level lowers to less than 88%:

Train A e

HV-8095A e

HV-8096A e

HV-0442A

-OR-Train B e

HV-80958 e

HV-80968 e

HV-0442B 53.

Maintain the following:

e RCS pressure -

approximately 350 pais.

RCS temperature - less e

than 200'F.

e Bubble in PRZR.

54 When access to the Control Rcom is regained, establish communications between the Shutdown Panels and Main Control Room.

  • '344$

I

PROCEDURE No.

LEVISloN PAGE No.

i l

VEGP 18038-2 0

35 of 47

\\

l ACTION / EXPECTED RESP 5NSE RESPONSE NOT OBTAINED l

NOTE Prior to transferring switches and controls from the shutdown panel to the Main Control Room panel, switch l

i positions should be verified and controller errors should be nulled between the control stations.

55.

Transfer controls back to Main Control Room while initiating 11510, REMOTE SHUTDOWN PANEL LINEUP.

56.

At the Unit Shift Supervisor's discretion, restore any previously altered equipment back to normal configuration.

57.

At the Unit Shift Supervisot's discretion, initiate the appropriate procedure.

END OF PROCEDURE TEXT I

)

l l

l Nun

PWoCEDURE No.

GEVISloN PAGE No.

VEGP 18038-2 0

36 of 47 Sheet 1 of 2 ATTACHMENT A TURBINE DRIVEN AFW PUMP OPERATION FROM SHUTDOWN PANEL C

~

1 CAUTION The TDAFW pump steam supply valve, HV-5106, will not automatically open on a pump start signal after control has been transferred to the Shutdown Panel.

A.1 STARTING TDAFW PUMP A.1.1 TRANSFER control of the TDAFW pump steam supply isolation valves, HV-3009 and HV-3019 to LOCAL.

A.l.2 ENSURE at least one steam supply isolation valve is open.

A.l.3 TRANSFER control of the TDAFW Pump Room Outside Air Damper, KV-12010 to LOCAL.

A.1.4 ENABLE differential pressure controller PDIC-5180B by placing transfer switch MS-5180 in LOCAL.

A.l.5 TRANSF3R control of the TDAFW Pump AFW Throttle Valves HV-5120, KV-5122, HV-5125 and HV-5127 to LOCAL.

A.l.6 ENSURE TDAFW pump Trip /Thrcttle Valve PV-15129 is reset by verifying the motor operator is OPEN and the valve is latched and OPEN.

A.1.7 ENSURE differential pressure controller PDIC-5180B is in AUTO.

A.l.8 START the TDAFW pump by placing HS-5106C in LOCAL and opening HV-5106.

A.l.9 VERITY that pump speed and discharge pressure begin rising.

NOTE Differential pressure controller PDIC-5180B will attempt to maintain a fixed differential pressure of 500-600 psid between the TDAFW pump turbine steam supply pressure and the pump discharge pressure by raising or lowering turbine l

speed as steam pressure varies with RCS temperature.

A.l.10 MONITOR AFW flow to each SG using FI-51500, FI-51510, FI-5152C and FI-5153C.

>m.s t

PRO E GENO.

REVISION PAGE NO.

Sheet 2 of 2 ATTACHMENT A TURBINE DRIVEN AW PUMP OPERATION FROM SHUTDOWN PANEL C A.1.11 MONITOR 'SG levels and adjust TDAW pump AFW Throttle Valves as necessary to maintain SG level at 50% PR (60% WR).

A.2 STOPPING TDAFW PUMP A.2.1 TRANSFER control of ALL TDAFW pump and valve controls to LOCAL.

A.2.2 PLACE the TDAFW Pump Speed Controller PDIC 9180B it MANUAL and REDUCE turbine speed to 1535 rpm.

A.2.3 TRIP the pump by placing MS-15111B in CLOSE.

A.2.4 CLOSE the Steam Supply Isolation Valve HV-51068.

A.2.5 When TDAFW pump reaches 500 rpm, fully open all TDAFW pump AFW Throttle Valves.

END OF ATTACHMENT A IC 40$

PROCEDURE No.

l REVISloN WAGE No.

VEGP 18038-2 0

38 of 47 Sheet 1 of 3 ATTACHMENT B STARTING AND PLACING DIESEL GENERATOR A(B)

ON A DEAD BUS FROM OUTSIDE THE CONTROL ROOM B l.

ESTABLISH communications between the diesel generator and affected IE 4kV bus.

At the Generator Control Panel PDG1 (3).

B.2.

RESET lockout relays A, B, C if required.

B.3.

PLACE Local / Remote Switches in LOCAL.

e HS-4516 (4517)

HS-9045A (B Train only, back of MCC 2BBF) e e

HS-9047A (3 Train only, back of MCC 2BBF)

B.4.

IF tripped, THEN reset control power breakers on front of engine control panel.

B.5.

PLACE Unit / Parallel switch HS-4414A (4452A) in UNIT.

B.6.

ALERT personnel in the vicinity that the diesel generator is starting.

B 7.

DEPRESS Manual Start pushbutton HS-4569A (4570A).

B.8.

OBSERVE the following:

a. Red STARTING lamp energizes.
b. Red SHUTDOWN SYSTEM ACTIVE lamp energizes.
c. Starting air is admitted to cylinders and engine begins to roll.,
d. Red RUNNING lamp energizes when engine speed reaches 200 rpm.
e. Blue READY TO LOAD lamp energizes when engine speed reaches 400 rpm.
f. Generator field flashes and generator voltage raises to 3750-4300 volts.

B.9.

CONTROL generator voltage at 4kV using MS-4409A (4477).

B.10.

CONTROL generator frequency at 60 hz using MS-4518A (4519A).

IM0h

pro DU E No.

LEUISloN WAGE No.

Sheet 2 of 3 ATTACHMENT B B.11.

At the 1E 4kV bus local control panels 2AA02-00 (2BA03-00).

a. TRANSFER control to LOCAL and TRIP PREF NORM INCM BRKR 2AA02-05 (2BA03-01).
b. TRANSFER control to LOCAL and CLOSE DIESEL GEN BRKR 2AA02-19 (2BA03-19).

B.12.

At the Remote Shutdown Panels:

a. START at least one Nuclear Service Water pump on the affected bus.
b. START AFW pumps on the affected bus.

B.13.

At the lE 4kV bus local control panels:

a. TRANSFER control to LOCAL and CLOSE.the following Sply FDR Brkrs:

e 2AA02-10 (2BA03-06) e 1AA02-20 (2BA03-04) e 2AA02-21 (2BA03-09) e 1AA01-22 (2BA03-18)

B.14.

At 480V AC MCC 2NBI(2NBO), CHECK the following

a. The Generator Space Heater red indicating lamp is OFF,
b. The Jacket Water Circulating Pump green indicating lamp is ON,
c. The Lube Oil Circulating Pump green indicating lamp is ON.

mw,

I-PROCEDURE No.

REVISloN WAGE No.

VEGP 18038-2 0

40 of 47 Sheet 3 of 3 ATTACHMENT B B.15.

CHECK the following parameters after the engine has been operating for several minutes:

a. Engine oil pressure stabilizes between 50 and 55 psig,
b. Turbocharger oil pressure stabilizes between 20 and 25
psig,
c. Jacket water pressure stabilizes between 10 and 30 psig,
d. Fuel oil pressure stabilizes between 20 and 30 psig,
e. LO OUT and JW OUT thermocouple temperatures (Positions 19 and 21) stabilized at less than 180F,
f. Generator bearing oil rings are turning freely.

B.16.

Periodically VERIFY operation of the. Fuel Oil Transfer pumps.

If "A" train transfer pump (s) is not operating properly and is required, 27579-C, EMERGENCY DIESEL GENERATOR FUEL OIL PUMP CONTROL CIRCUIT EMERGENCY may be used to provide guidance in bypassing Control Room circuitry.

B.17.

Return to Step 9.

END OF ATTACHMENT B l

MMel

PROCEDURE NO.

REVISION PAGE RO VEGP 18038-2 o

41 of 47 Sheet 1 of 1 ATTACHMENT C REQUIRED SHUTDOWN MARGIN FOR MODES 3 AND 4 (MODE 4 WITH AT LEAST ONE RCP RUNNING) 7.co I

6.00 -

Acesetasta ope nAf 6*G 0

naman

$ 5.00 4

W (2100,4.0) j 4.00 e

a e

asoueaso a

5

[

omsoa =

e

-(

4444448e l 2.00 x

w s

I p

' t n

Y J

E umeemme dI OPT 4ATIIe8 l

-w U80L13)

~--

1.00 e-9_'

O.00 0

0.2

'O.4 0.0 0.8 1

1,2 9,4 18 1.8 2

(Thousands)

MCS BCMIKW CONCENTR ATKWI(4

$h l

PWOCEDURE NO.

REVISION PAGE NO.

WGP 18038-2 0

42 of 47 Sheet 1 of 1 ATTACHMENT D REQUIRED SHUTDOWN MARGIN FOR MODE 5 (MODE 4 WITH NO RCP's RUNNING) 7.00 (2100,6.44) -g A

6.00 ACCEPTA8LE 2P OPE R ATING JF R E GION

>F F

/

~ 5.00

-d

.r AV E 4.00 p

o mEOutato

/

2 E

SHUTDOWN e

r Ng g

... N

?

3.00 p

UN ACCEPTASL E JF OPE RATING H

R EGION h 2.00

/ "

.d '

f f

1.00 (300,1.0)

I 0.00 0

0.2 0.4 0.6 0.8 1

1.2 1.4 1.6 1.8 2

(Themsends)

RCS 90440N CONCENTR ATK)N (PPM) e

$344$

PROCEDURE NO.

REVISION PAGE NO.

VEGP 18038-2 0

43 of 47 Sheet 1 of 1 ATTACHMENT E RCS/PRZR TEMPERATURE AND PRESSURE DATA PRZR SUBC00 LING =

RCS TEMP TIME PRESS SAT TEMP RCS TEMP SAT TEMP P

i Completed Signature Date/ Time Reviewed Signature Date/ Time Coments 9

? 44$

1 m

BROCEDUCE NO.

GEVISION PAGE NO.

VEGP 18038-2 0

44 of 47 Sheet 1 of 1 ATTACHMENT F rnph$g. T r. T rI =.t::ar-4=rt:-r u.r5 me. 5 ---Z1.

2 1 :. = =;: N., e

.q :-

  • S.::r188SURE TDOERATURE tDGTS f m ~ - - " - :-y -us

==myy= =y=c =c m e==i

- y

=p 3 -i;;.i:ty.+79cy y7.,;p9[: 1.-;7-f I ]

..l.

,,.,:.E..:._- E --+L -in.i

- ;5 m-.

- 6

_ 3--_

3

-; ;- 3 ----;-

9h; El 9 U.E E;;-

"-C' ': fE =-:r ^M EEh =r __-

=i EiF f;
-. #j M T : _. i=2 r.Mi E

M@-2 54 Mi=E55NEI5NN354iN EsT..f -I[ =5$

~~

~~

~~~

~

-5:55 E=

55 E555M 5-- =/ EE $$ E2 N_-M55 Es iff

" ee

=

.=

@I-i-E555 I=~E-53-N 55=b5N I

-. -. -l ".' 3 N ELM L:51= r

@ =-

c E=#Qiiim yg{y(( (E335pMMyd Q

- _a E Em

]

M

~

E-r cewx--==: -w=+=

m=v2=n E u=r

=

c=w :

=

N45E E 5 SINU 55 5$I 'EiUNSi: I 5U5bb5 U5

-EE 55 b

EEb E-E5 =E @E W5

@-=

5= 1 E -b

=-E i 5 =-r- 'E=~=5# =' E= '

=

  1. #M

=-

=

W f<R5Hh Ulf M5Sf"- El-N ~ ~ =d 55 @5 NbU525 N5 5 5 5.-Ei N5 ErN T

17 ~

--

  • 8-E "i ' f r *HE 1E" e/

= - - E.6i M m:

=_ F_;F.i F - D.

.'-Yrr '-!=--"
.t-i d.9-E

~nM C

T A': "= - ==== E=9 d: =~1-it so 1600 PS I

J-

. J[5 d5

.=. T-- =. E92---

--+;.

f 9 E:9

"=d=~ EE

.M

_H EQ =-'= ':G99 Q;_Q5 51 jiiq 5 q115#

$ 5 My' I

i-2 :E. :': =tj:;13S ;-=:in_-

W:

mi 2:I.;g 1

MA'F-5 MN_::ED

-~NU. iU@i55f'NN5 55 55EE k55l. N f:YE5NE

~

nT.f5 l.5 7dit 5fM=fI L:._if : - _E_E =.I..A..E. ['_W_t,. 5_

~iECGGGNDED 'j4 5% =# @

gi -.f_
42. h.=zf=J W f..i..
.s

-E, _E-9_ E_E ET W i=. 3. E.. J=2 @

_=1.lE._.

+_c: L+i' mm yAg HW~~ is @ -@M M M 554

= WPrrnr-x=z-v

=

s: =

EM N bl4 pt "-?#Rn:M tr m== -t=C '-W ;- f=-2-P"iF/ 5V RVEiW:=E E E (M115 EE 5E U

C l.". ?:T

-i;5 A f =-NE iM U'T-k.-

- E=h '=N: D--I I i=

_i_ :p M AK= i'O=10'F sVacoot.ID MARCDI' if-5-4lI Ef/M# 35 # 5=3=

fr ITEM

=

=

=iff E

_=:=E f+$ #M#M5 05 El"MiIEMiM5 JEM H,b====ite
f::-

+

t

=EWEi:4 -E=E. WM =tM EM E~5-#3E Ej =M6M MRE es

tu.a

= :-.= - ' = - * - - '= :__--

.: x=.

_== = -. _, =. -

,==_ y{

=,

_Ll""'...:u u

.; :-a=.=-J T. "

1

{

  • 1*.

.=D

-"T
.T
_.=-

12-

-"*p l C_.:'"-~

-"1-

}%_

.Zi ' f. _ I-L0;p.' 'EET=1 E.=E f =g =E 3

)_Ij.=Lt =E:

it.'-

-M c=fji

+ _ _ ' _.l N-j

~:-g=f-iggf.

f -E- [g=[i-j :-4 -.

- ; =v. f4 - i.+.lf --Ec=:?- q=

.iq j=j =E F-i."2 g

c n-L:D

- --9 9. :-M- - Mit=%:- -@ = @'_-. i-is J : =-i j 3riE@=E=Wr =. ~=EM

_ T = r a. = 1006

'.7A S~N !

2- :=-Di 4$_i:t-Is. JE NU-5 SI-- 5N-- rE 5@ @S /55[;I

[{;l-i#5 55 Ei E.i ? - ~ *E ifEE==. E=J:5"E=iE F=EEinE-WM --5s/a&A#/ &##si sM EEME N=3-b_W :4==#- IR L=ti

=E= :=ihE-if-sh &=- IstM'=d=f4:$h @s4@ =.4 i R

? 'E '800 MWIW=E92tE: -Et#9=LE dEF in=O=fW/EfflM=5i== WJM
Ex:/i=f / =~ =1E=iEEA
  1. 2
    1. -rpa Ei=i=#=hq;p%f=.&E. :-14= d5 s-M

' F#_.,_

Wh/=7 fii3-T=- [EE E-i U

=

- ~ " -=~2'-

EM=n=2 W #i-9= Eff4 i

M-5 N1 5?- :-@ -- E 5:N N'd Mf5 E. - N -M I:'- 8.;;; d ='= f= A -1 = 5. 5

-d.-

Y._f.==f,l

. $4WRAUW CUETl_ lei M

- -. L_r
=m -.= =.
.r_.. 8 =-

.1

r_ -

.1.,

a.=-

p j,;;

r_

-- w-

. - re

=2-

= _. - c

=r.

MS SETPY

4-

21 1 n.:!/u- - -=.4

=

.-5

= :-i-

+2:-=

==

=

b cEE'

+13 +=W;g L IS

_+

-, _ --.4-

=

t=: D-A H;f _

E +=M=

- =L=:-nr

=

.= --==

==. :

==--

=

-=

=3 :.-_. =U J. '. t. -

r

_~. J

_ bh; - h-h--[.[CV 433A

- Ish h.: h :b : '._.Yr_

[ M NSk.I5N

.=r-m=

1=:

s

e w

at t.IMIT:

ef-55 '~.~5..-

=

2 p.r==

rg p

n 12:

+

2 -

N 5NS

'E' i 'F 3 W-I ""

....: : =.Fai'@.-T, j-MT @T=irM:P t-LW i-f $

._h

- 4'ENkbit--. _ _=- -m

==

~5

I

' ~ * -

.f7:

"-.=. 7 w~..

[' j

.T '.Ulf '~ -Z EF

. =. ' M?

4.

_' j

'{

.... w-.-

-=

v 2

f

{.d{

.-U.-.MDI. RCP. START F1138.%:M p'

=

-=

~M-f i-is "h==.fir--=-.r=+ k "_4

=1-

--Q-

=

= -.f t

4. m.. y-- &

_k x.

-.g00

....=y.=-:

g; g ;;

=

.=

. 3 -

k-w

.- ^~k r.

=; + e,

..i= W =~===-1. - - s ->

'N;-c

=

=

==

& +

=

n

-.T

=.

z9,2 2:='-~= -=~-

/m~

f=- 4..-7._

E q ". ~: ; gg;;i -c m

&-m3 x

mzm

.m m

.=.

s~

=

-.. t-2-

=

=

=: : p 5 3 g

= 5 L: z.

- n 3 2 c

. = 3.

k.p...i..f..g, e' =Q%a.'jd._.

_ _I.;.:=.tF r' f M..y....~=,E

'y '_' } --

=

9 Y9 1i if p

. jr.

.7 7

~ ~ - ~'

=:'. -

C1.~

':7 r

=-

=; ; f ':L.d E. :

'iW:i O '

=. :

'r:=. I'=-T2 74:

@h-CH@.

WW NIKU JUE W34 V fN)'M9 RM BC T F W T

@ f-

=

1 P%OCEDURE No.

REUISloN PAGE No.

VEGP 18038-2 0

45 of 47 Sheet 1 of 3 TTACHMENT G j

LOCAL OPERATION OF THE STEAM GENERATOR ATMOSPHERIC RELIEF VALVES,WITH A LOSS OF ALL AC POWER Gl.

OPEN the breaker for the Hydraulic Operator Pump of the Atmospheric Relief Valve (ARV) intended to be locally operated.

SG1 2PV-3000 2ABB-25 (Aux. Bldg., Room 149)

SG2 2PV-3010 2BBB-25 (Aux. Bldg., Room 147)

SG3 2PV-3020 2BBB-26 (Aux. Bldg., Room 147)

SG4 2PV-3030 2ABB-26 (Aux. Bldg., Room 149)

G2.

ESTABLISH COMHUNICATIONS between the Shutdown panels and the Main Steam Valve Room ARV Local Hand Pump Station.

G3.

PLACE the Local Hand Pump Station in STANDBY by performing the following steps:

CHECK level in hydraulic fluid reservoir, a.

b.

POSITION Selector Valve 2 to NEUTRAL (Valve handle will point directly away from the reservoir),

CLOSE the hand pump bleed off valve using the slotted c.

end of the pump handle, d.

STROKE hand pump several times to check free movement, e.

CLOSE the Reservoir Inlet Valve 11A, f.

STROKE hand pump until Gauge 8 reads approxieately 1000

psig, g.

OPEN the Accumulator Dump Pilot Supply valve 11B, h.

STROKE hand ump until Gauge 8 reads 1500 psig for i

approximatel 1 minute, NOTE Maintaining this pressure may be accomplished by applying continuous force downward on the pump handle while monitoring pressure, i

OPEN the Reservoir Inlet Valve, llA and allow the pressure on Gauge 8 to drop to O psig, i

j.

CLOSE valve llB, k.

CLOSE valve llA.

m...

' " ~

ggME No.

18038-2 0

46 of 47 l

Sheet 2 of 3 TTACHMENT G G4.

When directed by the Shutdown panels, LOCALLY POSITION the ARV by performing the following applicable steps:

To jack valve in the OPEN direction:

(

a.

l (1)

Shift the Selector Valve 2 to the OPEN position (counterclockwise 45*),

l, l

(2)

STROKE the hand pump until the desired valve position (as determined by the Shutdown panels) is i

obtained, l

t (3)

SHIFT the Select.t Valve 2 back to the NEUTRAL position.

b.

To Jack valve in the CLOSE directions (1)

SHIFT the Selector Valve 2 to the CLOSE position (clockwise 45'),

(2)

STROKE the hand pump until the desired valve i

position (as determined by the Shutdown panels) is

obtained, (3)

SHIFT the Selector Valve 2 back to the neb 7RAL l

position.

G5.

When AC power has been restored and it is desired to TRANSFER CONTROL of the ARV back to the Shutdown panels, perform the l

following steps:

i NOTE j

It may be desirable to control l

Reactor Coolant System temperature with one of the other ARVs while

(

re-establishing control of the

" locally operated ARV to the Shutdown

~

E

$ Panels.

j a.

At the ARV Local Hand Pump Station:

4 I

(1)

POSITION the Selector Valve 2 to the Neutral l

position, j

i j

(2)

OPEN the Reservoir Inlet Valve 11A, l

(3)

OPEN the hand pump bleed-off valve using the slotted end of the pump handia.

l i

l l

6

)

PROCEDURE NO.

REVIStoN PAGE No.

VEGP 18038-2 0

47 of 47 Sheet 3 of 3 TTACIOfENT G b.

On the Shutdown panels, ADJUGT the ARV controller 2-PIC,-3000B (3010B, 3020B, 3030B) for MINIMUM FLOW, CLOSE the breaker to supply power to the ARV hydraulic c.

pump opened in Step Kl.

d.

ADJUST the ARV controller to maintain Reactor Coolant System temperature as required.

G6.

RETURN to Step in effect.

END OF ATTACHMENT G t

,1 1

i MHet

--.