. _ _ _ ._ _

o Westinghbuse Proprietary Class 2 WCAP-14822 Revision 0 Draft l

l AP600 Quality Assurance Procedures Supporting NRC Review of AP600 SSAR Sections 18.2 and 18.8 l l

l l

1 9701290016 970115 PDR ADOCK 05200003 A PDR

e AP600 DOCUMENT COVER SHEET TDC: IDS I S Form 58202G(5/94) AP600 CENTRAL FILE USE ONLY:

0058.FRM , RFS#. RFS ITEM #

AP600 DOCUMENT NO. REVISION NO. ASSIGNED TO

, GW-GAP-200 0 Draft Page 1 of Robin K. Nydes ALTERNATE DOCUMENT NUMBER: WCAP-14822 Draft WORK BREAKDOWN #: 3.3,2.9 DESIGN AGENT ORGANIZATION:

TITLE: AP600 Quality Assurance Procedures Supporting NRC Review of AP600 SSAR Sections 18.2 and 18.8 ATTACHMENTS: DCP #/REV. INCORPORATED IN THIS DOCUMENT REVISION:

l CALCULATION / ANALYSIS

REFERENCE:

1 i

ELECTRONIC FILENAME ELECTRONIC FILE FORMAT ELECTRONIC FILE DESCRIPTION n/a n/a n/a a

(C) WESTINGHOUSE ELECTRIC CORPORATION 1997 WESTINGHOUSE PROPRIETARY CLASS 2 This document contains information proprietary to Westinghouse Electric Corporation; it is submitted in confidence and is to be used solely for the purpose for which it is fumished and returned upon request. This document and such information is not to be reproduced, transmitted, disclosed or used otherwise in whole or in part without pnor wrrtten authorization of Westinghouse Electne Corporaten, Energy Systems Business Unit, subtect to the legends contained hereof.

@ WESTINGHOUSE PROPRIETARY CLASS 2C This document is the property of and contains Propnetary Informaten owned by Westinghouse Elednc Corporation and/or its subcontractors and suppliers. It is transmitted to you in confidence and trust, and you agree to treat this document in stnd accordance with the terms and condibons of the agreement under which it was provided to you.

@ WESTINGHOUSE CLASS 3 (NON PROPRIETARY)

COMPLETE 1 IF WORK PERFORMED UNDER DESIGN CERTIFICATION OR, COMPLETE 21F WORK PERFORMED UNDER FOAKE.

1 OE DESIGN CERTIFICATION PROGRAM - GOVERNMENT LIMITED RIGHTS STATEMENT [See page 2]

Copynght statement A license is reserved to the U S. Govemment under contract DE AC03-90SF18495.

$ DOE CONTRACT DELIVERABLES (DEllVERED DATA)

Subject to specMed exceptions, disclosure of this data is restncted until September 30,1995 or Design CertMeation under DOE contract DE-AC03-90SF18495, whichever is later.

EPRI CONFIDENTIAL: NOTICE: 1" 2 35 k 5C CATEGORY: Ad B " CdD5E h 2 @ ARC FOAKE PROGRAM - ARC LIMITED RIGHTS STATEMENT ISee page 2)

Copynght statement: A license is reserved to the U S. Government under contract DE-FCO2-NE34267 and subcontract ARC-93-3-SC-001.

g ARC CONTRACT DELIVERABLES (CONTRACT DATA)

Subject to specified exceptions, disclosure of this data is restncted under ARC Subcontract ARC-93-3-SC-001.

ORIGINATOR Si R: ATE

, . b SIG ATURE*

s .

f J **

  • APPROV L DA E A 00 RESPONSIBLE MAN 4GER f/A/ A )~$fl -  % l 0
  • Approval of the responsible manager signifies that document is complete, all r5 quired revews are complete, eledronc[l2 is attached and document is released for use.

AP600 DOCUMENT COVER SHEET Paga 2 ,

Forrn 58202G(SI94) LIMITED RIGHTS STATEMENTS DOE GOVERNMENT LIMITED RIGHTS STATEMENT (A) These data are submitted with bmited nghts under govemment contract No. DE-AC03 90SF18495. These data may be reproduced and used by the govemment with the express limitation that they will not, without wntten permission of the contractor, be used for purposes of manufacturer nor disclosed outside the govemment, except that the government may disclose these data outside the govemment for the following purposes, if any, provided that the government makes such disclosure e,ubject to prohibition against further use and disclosure:

(I) This "Propretary Data" may be disclosed for evaluation purposes under the restnctions above.

(II) The "Prepretary Data" may be disclosed to the Electne Power Research Inst 2ute (EPRI), electnc utility representatives and their direct consultants, excluding direct commercial competitors, and the DOE Natenal Laboratores under the prohibitions and restnctions above.

(B) This notice shall be marked on any reproduction of these data, in whole or in part.

ARC LIMITED RIGHTS STATEMENT:

This propnetary data, furnished under Subcontract Number ARC-93-3-SC-001 with ARC may be duplicated and used by the govemment and ARC, subject to the hmitations of Article H-17.F. of that subcontract, with the express hmitations that the propnetary data may not be disclosed outside the govemment or ARC, or ARC's Class 1 & 3 members or EPRI or be used for purposes of manufacture wrthout prior permisson of the Subcontractor, except that further disclosure or use may be made solely for the following purposes:

This propnetary data may be disclosed to other than commercial competitors of Subcontractor for evaluation purposes of this subcontract under the restriction that the propretary data be retained in confidence and not be further disclosed, and subject to the terms of a non-disclosure agreement between the Subcontractor and that organization, excluding DOE and its contractors DEFINITIONS CONTRACT / DELIVERED DATA - Consists of documents (e.g specifications, drawings, reports) which are generated under the DOE or ARC Contracts which contain no badground proprietary data.

EPRI CONFIDENTIALITY / OBLIGATION NOTICES NOTICE 1: The data in thts document is subject to no confidentiahty obligations.

NOTICE 2: The data in this document is proprietary and confidential to Westinghouse Electric Corporation and/or its Contractors. It is forwarded to recipient under an obhgation of Confidence and Trust for limited purposes only. Any use, disclosure to unauthonzed persons, or copying of this document or parts thereof is prohibited except as agreed to in advance by the Electnc Power Research Institute (EPRI) and Westinghouse E'ectnc Corporation. Recipient of this data has a duty to inquire of EPRI and/or Westinghouse as to the uses of the information containec herein that are permitted.

NOTICE 3: The data in this document is propretary and confidential to Westinghouse Electric Corporation and/or its Contractors. It is forwarded to recipent under an obhgation of Confidence and Trust for use only in evaluation tasks specifically authonzed by the Electric Power Research Institute (EPRl). Any use, disclosure to unauthonzed persons, or copying this document or parts thereof is prohibited except as agreed to in advance hv EPRI and Westinghouse Electne Corporation. Recipent of this data has a duty to inquire of EPRI and/or Westinghouse as to the p 4 s of the information contained herein that are permitted. This document and any copies or excerpts thereof that may have been generated are to be retumed to Westinghouse, directly of through EPRI, when requested to do so.

NOTICE 4: The data in this document is propnetary and confidential to Westinghouse Electne Corporation and/or its Contractors. It is being revealed in confidence and trust only to Employees of EPRI and to certain contractors of EPRI for hmited 9 valuation tasks authonzed by EPRI. Any use, disclosure to unauthonzed persons, or copying of this document or part; thereof is prohibited. This Document and any copies or excerpts thereof that may have been generated are to be returned to Westeighouse, directfy or through EPRI, when requested to do so.

NOTICE 5: The data in this document is propnetary and confidential to Westinghouse Electnc Corporation and/or its Contractors. Access to this data is given in Confidence and Trust only at Westinghouse facihties for limited evaluation tasks assigned by EPRI. Any use, disclosure to unauthonzed persons, or copying of this document or parts thereof is prohibited. Neither this document nor any excerpts therefrom are to be removed from Westinghouse facihtes.

EPRI CONFIDENTIALITY / OBLIGATION CATEGORIES CATEGORY "A"-(See Delivered Dat:) Consists of CONTRACTOR Foreground Data that is contained in an issued reported.

CATEGORY "B"-(See Delivered Data) Consists of CONTRACTOR Foreground Data that is not contained in an issued report, except for computer programs.

CATEGORY "C"- Consists of CONTRACTOR Background Data except for computer programs.

CATEGORY "D"- Consists of computer programs developed in the course of performing the Work.

CATEGORY "E"- Consists of computer programs developed pnor to the Effective Date or after the Effective Date but outside the scope of the Work.

CATEGORY "F"-Consists of administrative plans and administrative reports.

O Westinghouse Proprietary Class 2 ARPP-33290 WCAP-14822 Revision 0 Draft AP600 Quality Assurance Procedures

Supporting NRC Review of AP600 SSAR Sections 18.2 and 18.8 i

Revision 0 February 1997 AP600 Document Number: GW-GAP-200 4

i j S. P. Kerch K. A. Kloes R. K. Nydes i

)

Westinghouse Electric Company P.O. Box 355 Pittsburgh PA 15230-0355 C1997 Westinghouse Electric Company All Rights Reserved

e WCAP-14882 Revision 0 Draft AP600 Quality Assurance Procedures Supporting NRC Review of AP600 SSAR Sect!ans 18.2 and 18.8 Table of Contents 1.0 Introduction 2.0 References Appendices A.P600 Program Procedure Matrix, Revision 19 AP 3.1, Revision 2 ,

AP 3.2, Revision 6 AP 3.5, Revision 1 (This will be Revision 2 in Revision 0 of this WCAP)

AP 3.6, Revision 2 AP 3.7, Revision 0 AP 3.12, Revision 0 (This will be Revision 1 in Revision 0 of this WCAP)

AP 3.14, Revision 0 AP 7.2, Revision 0 l

i 1

1 1

b i

i

WCAP-14822 Revision 0 Draft AP600 Quality Assurance Procedures Supporting NRC Review of AP600 SSAR Sections 18.2 and 18.8 1.0 Introduction Chapter 18 of the AP600 Standard Safety Analysis Report contains the AP600 Design Certification information for Human Factors Engineering. The NRC is reviewing this information against NUREG-0711 (Reference 1) and has provided comments on Element 1, the Human Factors Program Plan, and Element 7, the Human-System Interface Design, in References 2 and 3.

One comment common to bcth the Element I and Element 7 reviews is that information contained in the Westinghouse AP600 Program Operating Procedures Docmnent (Reference 4) supports the AP600 design certification but has not been docketed. Per those references, until the pertinent information in that document is docketed, the staff is unable to reach a final safety conclusion related to the AP600 human factors engineering program.

To address this review comment, the pertinent procedures have been compiled into this WCAP for transmittal to the NRC (Reference 5).

2.0 References

1. NUREG-0711, Human Factors Engineering Program Review Model, July 1994.
2. Letter from NRC to Westinghouse (Huffman to Liparulo), Comments on AP600 Related Open Items Associated with Element 1 of the Human Factors Engineering Program Review Model (HFEPRM), dated December 20,1996.
3. Letter from NRC to Westinghouse (Huffman to Liparulo), Comments on AP600 Related Open Items Associated with Element 7 of the Human Factors Engineering Program Review Model (HFEPRM), dated December 19,1996. )

1 I

4. WCAP-12601 Revision 19, Westinghouse AP600 Program Operating Procedures Document.
5. Letter NRC-DCP-97-4938 (DCP/NRC0704) from Westinghouse to NRC

, (McIntyre to Quay), Transmittal of Draft WCAP-14822., ?600 Quality Assurance Procedures Supporting NRC Review of AP600 SSAR Sections 18.2 and 18.8, dated January 13,1997.

1 i

1

  • 4 A

Purecrs % vos tsa 4 m{yb g ,a. e

y , . %o

,y .

PROCEDURE MATRIX Af Wi ~

9"f *j $

W Westinghouse Electric Corporation

" Advanced Technology Business Area AP600 PROGRAM PROCEDURE MATRIX 3

jr ; <; AP600 -

f y- --

l[ r S i3 7. 2 Program Procedure Matrix L M=E *j' f_ _

The Westinghouse commitments to the quality assurance requirements of NOA 1-1989 Edition 3

! :s wE

{ Qr {} w }.

through NOA-1b-1991 Addenda for the AP600 program are established in the UO Nge::::

-& uiaiciy CvninnA, @ ^.,,;;a: sepeit, WOAP 0070, 'Cresigi07;^; ra Su;;r;;;

9n

<> y E h Ed.w/{c;;;r it Ceraseh "=--s U,0 Oc;ti A;;urera: P' . ." The app 5 cation of ner OM 5 WCAP 0370 to the AP600 program is described in WCAP-12600, 'AP900 Advanced Ught

,(Vey Water Reactor Design QuaRty Assurance Program Plan," which has been accepted by the Department of Energy (DOE) for the Design Certification Project and by Advanced Reactor Corporation (ARC) for the First-of+ kind Engineering (FOAKE Project.

Sepee s mb mni Proarcr.s %sy l For AP600 quality-related actMties performed by Westingh N [o Pbj

), -Busmese Area (ATGA) and the Nudsar Teche::i,; Division , these commitments are l satisfied by implementin4the applicable Level 2 En,o Jystems Business Unit (ESBU)

! pp d~ 7rocedures of the ESBU' Policy / Procedures Manual ( ), the applicabie Level 2 division procedures from Section 5 Appenda A of the ESBU PPM, and additional project-specrfic l

! procedures that address unique program requirements and implementation methodology. The l AP600 Program Operating Precedures Manual, WCAP-12601, controis these project specific ggf A~

I procedures. In accordance with thefESSWPPM, the procedures contained in WCAP 12601 are designated as Level 3. Existing Level 3 procedures from other manuals are also implemented where appropriate.

The attached AP600 Program Procedure Matrix is provided to show he relationship between the above described procedures and identify the procedures to be implemented on this program. The Matrix also shows he applicability of AP600 procedures to design organizations extemal to AMIA/NTBr This Matrix is updated as required to reflect changes in the body of implementing procedwes. m o /c s t>

m oosew. v.m.osases Page 1 of / 6 Form 58062 (3-85)/0008.FRM

ape 00 PROGRAM PROCEDURE MATRIX Rev. 20 DRAFT Quality Assurance Program Elements Level 2 Irnplemenhng Procedures (1) l Pei 3 Implemanhng Procedures (2) (3) (4)

( Ref.: NOA-1) . ESBU Policy / Procedures Manual The NOA-1 requererwts for organizanon are addressed I. ORGANIZATION through organizabon charts. AP600 management responsabetties are descdbed in WCAP-12600. AP600 QA Program Plan.

P/P 1.1 Management Review

11. QUALITY ASSURANCE PROGRAM P/P 2.2 Project Quakty Plan AP-2.1 Indoctnnation and Tranng P/P 4.16 Design Planning and Project Development P/P 18.1 Training P/P 4 4 Reactor Coolant System Configuranon
  • AP-3.1 AP600 Systems Spec hcanon Documents P/P 4.10 Desagn SpeaScations e AP-3 2 Design Conhgurabon Change Control for the WP-4 5 Design Analysis AP600 Program WP-4.17 Design VenScation by Independent Review or
  • AP-3 4 Funcbonal Spectecaton Altemate Calculatoons + AP-3.5 Design Reviews WP-4.18 Design VertGeation by Toshng
  • AP-3 6 AP600 Design Cnterta Documents WP-4.19 Computer Software Development Process
  • AP-3.7 Interface Control Document WP-4.19.1 Ven8 cation and Validason of Computer Software
  • AP-3 8 Desagn Specificagon (Component / Software) til DESIGN CONTROL WP-4,19 2 ConAguration Control of Computer Programs
  • AP-3 9 Preparaton and Control of Drawings WP-4.19.3 Software Error Reporting & Resoluton AP-3.10 Flued Systems Dessgn WP4.19 4 Dedicsson and instanason of Extemal Computer AP-3.12 Engineenng Database Access Software e AP-3.13 Safety / Seismic Class:Acabon WP4.19.5 Single Application and Smallinfomal Use AP-3.14 Plant & instrument Control System Computer Programs AP-315 AP-315 System Ptpsng & Instrument Control System WP-419.6 Maintenance of Configured Computer Programs s AP-3.16 Calculaton Numbenng & Fibng s AP-3.17 AP600 Component Numbenng AP-3.18 System Process Flow Diagram (PFD) Preparanon AP-3.21 ASME Piping Design Specincaton IV. PROCUREMENT DOCUMENT CONTROL P/P 6.1 Control of Purchased items and Services e

Page 2 of 6

  • e 4

o.3 AP900 PROGRAM PROCEDURE MATRIX Rev. 20 DRAFT Quakty Assurance Program Elements Level 2 Implemenhng Procedures (1)

Level 3 Implementsa Procedures (2) (3) (4)

ESBU Pohey / Procedures Manual

( Ref.: NOA-1)

AP-5.1 SSAR Preparaton Procedure AP-5 2 PRA Preparaten Procedure e AP-5.3 AP600 Tier 1 Document Development P/P 2.1 Pohcies and Procedures Preparation and Control of Drawings and e AP-5 4 SSAR/PRMTAAC Procedure for Respondmg V. INSTRUCTION

S. PROCEDURE

S W P-5.3 Engineestng Sketches To A Request For Additonalinformaton (RAf)

ANO DRAWINGS e AP-5 6 Release of Documentaton to NRC in Support of AP600 Desagn Certtcaton Document Control AP-0 0 Preparaton and Control of Procedures P/P 52 Properaton and Control of Drawmgs and e AP-6.1 Document Numbenng VI. DOCUMENT CONTROL WP-5.3 Engineestng Sketches e AP-6 2 Technical Document Release & Control e AP-6.3 Properaton. Rev6ew & Approval of ape 00 Documents AP-7.1 St@plia Evaluation. Audd, and Approval e AP-7 2 Control of Subcontractor Submdtals AP-7.3 Control 9 AP600 Contnbuted Labor P/P 6.1 Control of Puschased items and Serv 6ces AP-7.4 Aumhary Equpnent Design and Costng Process Vll. CONTROL OF PURCHASED 1(EMS AND SE.MCES ESBU QA Procedures Manual ESBU-OA-7.1 Evaluanon and Quahficaton of ESBU Supphers ESBU-QA-7.2 Suppher Aucats WP-18.0 Test Control AP-3.11 AP600 Teseng XI. TEST CONTROL WP-11.1 Control of Inspechon Measuring and Test Equ6pment Xil CONTROL MEASURING AND TEST EQUIPMENT XV. CONTROL OF WP-13.3 Deviaton Nobces NONCONFORMING ITEMS -_ -

Page 3 of 6

- - _ _ _ _ , _ _ . _ _ - - _ - - - - - - - - _ _ _ - -_ __--v ---,,,-- - _ . _ .

_ _ ,-. _ _ . _ M

AP900 PROGRAM PROCEDURE MATRIX Rev. 20 DRAFT Quaisty Assurance Pmgram Elements Level 2 Implementng Procedures (1)

' Level 3 Irnplemenang Procedures (2) (3) (4)

( Ref.: NOA-1) ES8U PokeyIProcedures Manuel P/P 14.1 ESBU - Sigruscant Quality issues XVI. CORRECTIVE ACTION WP-13 2 Controlof Nonconformances AP-16.1 Customer Feedback WP-14 2 Correceve and Preventve Actkm.

WCAP-14530. ESBU Informaron and Records Menegement Program Manual:

XVil. QUALITY ASSURANCE RECORDS P/P 16,1 Records IRM-1.1 Organizaton and Responsstmhty IRM-3 2 Protechon of Records on uptcal Disk XVllt. AUDITS P/P 17.1 Assessments AP-18.1 Self-Assessments P/P 21.0 identScagon and Reportng of Condreons Adverse (5) SUPPLEMENTAL PROGRAM to Safety DOCUMENTS NOTES NPD t0D Level 2 ESBU procedures are ident#ed in his matr6x with a *P/P' preAx. (4) Procedures that apply to doesgn organizabons extemal to (W) ATen and NfB are (1)

Level 2 dMaion procedures from Secton 5 Metrix A of the ESBU idenbeed wah a "" or "e" as sollows:

Pohey/ Procedures Manuel oro identRed wem a *WP* proibt

  • These procedures apply only with respect to document format and Level 3 procedures in WCAP-12601 are identeed wem an 'AP* preAx. content requirements (2)

Other Level 3 pWees are as speci#ed e These procedures apply only with respect to deArwhon of interlace The preAx for Level 2 NPD procedures was changed from *DP' to *WP" with he responsetnhties.

(3) phase-out of WCAP-9565 eWoctive 8/14/95. Where Level 3 procedures refer to

  • DP* procedures, the reference shall be concedered as shown in the
  • Procedure + This procedure apples only wem respect to Human Factors Crnes References" per pages 5 and 6 of his matetx. Revtssons to procedures requirements are 6 et required lor me solo purpose of changing Level 2 references, however, he references shall be corrected when he Level 3 procedures are revised. Procedures not marked wim a "" *e* or %* do not apply to dessgn orgeruzatons extemal to (W) NPD. .

(5) Not an NOA-t entenon.

Page 4 of 6 e e 3

o APG00 PROGRAM PROCEDURE MATRIX REV. 20 [mm/dd/yy]

PROCEDURE CROSS-REFERENCES 1

The following table identifies the ESBU Quality Policy / Procedures Manual references to be used for the "DP" procedure references in WCAP-12601.

PROCEDRURE REFERS TO CHANGE TO AP 0.0 WCAP-9948 WCAP-14530 IRM1.1 WCAP 9565 ESBU Quality Policy / Procedures

. AP 2.1 WCAP 9565 ESBU Quality Policy / Procedures i

AP 2.2 DP 2.4 ESBU 3.1 DP-4.0 ESBU 6.1 l

WCAP-13740 ESBU Quality Management System

{

! AP-3.1 DP-3.2.2 ESBU 4.10 I

AP-3.7 DP-3.2.6 WP5.3 1

i i AP-3.8 DP 3.2.2 ESBU 4.10 I l l DP-3.7.1 WP-4.19 .

l DP-3.7.2 WP-4.19.1 i

1 DP 3.7.3 WP-4.19.2 ,

1

DP-3.7.4 WP-4.19.3 i

i DP-3.7.5 WP-4.19.5

AP-3.9 DP-3.2.6 WP5.3 j AP 3.10 DP 3.2.8 W P-4.5 i

DP 3.3.2 WP-4.17 l

4 i

Page 5 of 6 i

o

3 l

\

AP600 PROGRAM PROCEDURE MATRIX REV. 20 [mm/ddlyy] .

PROCEDURE CROSSREFERENCES PROCEDRURE REFERS TO CHANGE TO ,

AP-3.11 l WCAP 9565 ESBU Ouality Policy / Procedures 1 DP-4.0 ESBU 6.1 l

DP-3.3.3 WP-4.18 DP-11.0 WP-4.18 l l

DP-12.0 WP-11.1 AP-3.14 DP 3.2.2 WP-4.17 DP 3.3.3 WP 4.18 DP 7.0 ESBU 6.1 AP 3.15 DP-3.2.8 W P-4.5 AP-3.16 DP-3.2.8 WP4.5 AP-3.21 WP 3.2.2 WP-4.17 AP 6.2 DP 6.0 ESBU 5.2 AP-7.1 ESBU OA-2.2 ESBU-OA 18.2 ESBU-QA-7.1 ESBU-OA-6.5 ESBU-QA 7.2 ESBU-OA-6.6 WCAP 9565 ESBU Quality Policy / Procedures AP-7.2 DP-4.0 ESBU 6.1 DP-7.0 ESBU 6.1 AP 18.1 DP18.1 Delete WCAP-8370 Part C Delete Page 6 of 6