Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML102360016 + (Reed Response to Request for Additional Information with a Revised Safety Analysis Report and Technical Specifications)
- 05000317/LER-1983-036-01, Reed Switch Position Indication Lost for All Control Element Assemblies (Cea). Caused by Short on CEA 56 Reed Stack Position Transmitter. Transmitter Replaced + (Reed Switch Position Indication Lost for All Control Element Assemblies (Cea). Caused by Short on CEA 56 Reed Stack Position Transmitter. Transmitter Replaced)
- 05000317/LER-1983-043-01, Reed Switch Position Indication Lost for All Control Element Assemblies (Cea). Caused by Short in CEA 32 Reed Stack Position Transmitter. Transmitter Replaced + (Reed Switch Position Indication Lost for All Control Element Assemblies (Cea). Caused by Short in CEA 32 Reed Stack Position Transmitter. Transmitter Replaced)
- ML20137K202 + (Reemphasizes Concern Expressed at 850521 Hearing Re Commission Decision to Amend Sunshine Act Regulations to Allow More Meetings to Be Held in Secret.New Rule Violates Spirit & Purpose of Sunshine Act)
- ML13310A886 + (Reemphasizes Concern Re Difficulties in Properly Evaluating Scenarios to Ensure Emergency Preparedness Exercises Being Met When Insufficient Time Available.Need for Timely Submittals of Objectives Reaffirmed.Schedule Submitted)
- ML17298A497 + (Reemphasizes Concern Re Timely Submittals of Emergency Preparedness Exercise Objectives & Detailed Scenarios to NRC & Fema.Implementation of Submitted Schedule Requested)
- ML20202G328 + (Reemphasizes FY87 Tasks for Thermal Hydraulics Phenomena Subcommittee,In Response to Request for Priority Ranking of Seven Areas Deserving Subcommittee Attention)
- ML20033F502 + (Reemphasizes Licensee Responsibilities to Assure Contractors & Subcontractors Permit Employees to Freely Contact NRC Re Potential Safety Issues W/O Restrictions)
- ML20210P885 + (Reemphasizes NRC Commitment to Support Completion of DOE Surface Reclamation Program by Sept 1998 Statutory Deadline)
- NRC-88-0065, Reemphasizes Need for Tech Spec Change Requested in 870427 & 0814 Applications,Changing Drywell Average Air Temp Limit as Stated.Although Drywell Equilibrium Temp Not Reached Reanalysis Indicates Existing Limits Could Be Exceeded + (Reemphasizes Need for Tech Spec Change Requested in 870427 & 0814 Applications,Changing Drywell Average Air Temp Limit as Stated.Although Drywell Equilibrium Temp Not Reached Reanalysis Indicates Existing Limits Could Be Exceeded)
- ML20214Q446 + (Reemphasizes That NRC Rept Re Serious Util Deficiencies in Qa/Qc Program Be Made Available to Board & Parties.Delay to Change Damaging Conclusions Contrary to Legal Duty)
- ML13276A043 + (Reese, S.O. and D.W. Risser. 2010. Summary of Groundwater-Recharge Estimates for Pennsylvania. Water Resource Report 70, Pennsylvania Geological Survey, Harrisburg, Pennsylvania. - TN1864)
- ML20150D475 + (Reesponds to Draft NRC Staff Positions Re Emergency Plans. Util Will Amend Fsar,Will Inform St of Il Re Inconsistencies & Agrees That Gsep & Answers to Questions on Dockets Constitute Emergency Plan for Facil)
- ML20198J383 + (Reesponds to Which Continued to Raise Several Concerns Re Belief That NRC Regulatory Action Resulted in Loss of Nuclear Generation & Put Industry Future at Risk. Assures That NRC Addressing Impact of Policies on Licensees)
- ML16327A062 + (Reevaluated Seismic Hazard Mitigating Strategies Assessment Report)
- ML17123A378 + (Reevaluated Seismic Hazard Mitigating Strategies Assessment Report)
- ML18094A124 + (Reevaluated Seismic Hazard Mitigating Strategies Assessment Report)
- ML20081B784 + (Reevaluates Response to NUREG-0737,Item III.D.3.4, Control Room Habitability, Based on PRA Technique for Onsite & Offsite Sources.App R Mods Will Assure Adequate Smoke Detection in Control Room)
- ML20006E337 + (Reevaluation & Affirmation of No Significant Finding,Per Comanche Peak Steam Electric Station,Unit 1 OL Antitrust Review.* Advises That Plant Finding of No Significant Antitrust Changes Will Not Be Changed)
- ML20211J714 + (Reevaluation & Affirmation of No Significant Change Finding Pursuant to Braidwood Station Unit 1 OL Antitrust Review)
- ML20246N329 + (Reevaluation & Affirmation of No Significant Change Finding Per Vogtle Unit 2 OL Antitrust Review)
- ML20141E650 + (Reevaluation & Affirmation of Updated No Significant Change Finding Per Clinton Nuclear Unit 1 OL Antitrust Review)
- ML19256A276 + (Reevaluation of Discrepancies Noted in 781107 Memo Re Total Exposure & Cost of the 780602 Study Reflects a Small Change in Exposure & a Difference by a Factor of 2 for Cost.This Clarifies a Major Portion of Discrepencies)
- ML20154D984 + (Reevaluation of Regulatory Guidance on Modal Combination Method for Seismic Response Spectrum Analysis)
- ML16274A225 + (Reevaluation of the SALP Program)
- ML18171A035 + (Reew Accident-Range RMS Calibration Process)
- ML24170A763 + (Reew Presentation - NRCDose3 NUREG CR 2907 - ML24170A763 Final)
- ML20207A239 + (Reexam of Steam Explosion Source Term During Severe Accidents, Presented at 851028-1101 Symposium on Source Term Evaluation for Accident Conditions in Columbus,Oh)
- ML19289D080 + (Ref 790105 Order Resetting Dates for Further Proceedings, Case 80006,appeals for Intervenor Status in Proceeding,Due to Geographic Proximity to Proposed Site)
- ML20058H376 + (Ref Core Rept - 17x17 Optimized Fuel Assembly, Vol 1)
- ML20058H392 + (Ref Core Rept - 17x17 Optimized Fuel Assembly, Vol 2)
- ML20058H416 + (Ref Core Rept - 17x17 Optimized Fuel Assembly, Vol 3)
- ML20058H442 + (Ref Core Rept - 17x17 Optimized Fuel Assembly, Vol 4)
- ML20058H463 + (Ref Core Rept - 17x17 Optimized Fuel Assembly, Vol 5)
- ML19330C664 + (Ref Core Rept 17x17 Optimized Fuel Assembly, WCAP 9500, Amend 1)
- ML19242A352 + (Ref Core Rept:17 X 17 Optimized Fuel Assembly, Vol 1)
- ML19242A359 + (Ref Core Rept:17 X 17 Optimized Fuel Assembly, Vol 2)
- ML19242A362 + (Ref Core Rept:17 X 17 Optimized Fuel Assembly, Vol 3)
- ML19242A363 + (Ref Core Rept:17 X 17 Optimized Fuel Assembly, Vol 4)
- ML19282A049 + (Ref Critical Experiments, Progress Rept Oct-Dec 1978)
- ML19210D916 + (Ref Critical Experiments, Progress Rept for Apr-June 1979)
- ML19247B389 + (Ref Critical Experiments, Progress Rept, Jan-Mar 1979)
- ML19317H176 + (Ref Critical Experiments,Progress Rept for Jan-Mar 1978)
- ML20266E781 + (Ref Dwg for Hanger Nos. Sheet 3 of 3)
- ML19321A034 + (Ref Emergency Operating Instructions (Hp), Revision 2)
- ML19321A036 + (Ref Emergency Operating Instructions (Lp), Revision 2)
- ML19209D192 + (Ref Emergency Operating Instructions for 412 Std Plant)
- ML19209D191 + (Ref Emergency Operating Instructions for 4-loop,3-loop & 2-loop Plants W/Nominal 1,400 Psi Range Safety Injection Plants,Revision 1)
- ML20034E303 + (Ref Helo 1 - Health Physics Sample Records)
- ML20034D949 + (Ref Helo 1 - Health Physics Sample Records)
- ML19321A031 + (Ref Instructions for Post-LOCA Cooldown & Depressurization, Revision 0)