Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20240900, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20241159, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20240611, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20240373, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20241353, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20241535, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20250264, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20250411, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20250770, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20250944, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20251165, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20251206, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- PMNS20260069, Reactor Oversight Process Public Meeting + (Reactor Oversight Process Public Meeting)
- ML21252A414 + (Reactor Oversight Process Public Meeting Summary, August 26, 2021)
- PMNS20191343, Reactor Oversight Process Radiation Safety Cornerstone Updates + (Reactor Oversight Process Radiation Safety Cornerstone Updates)
- PMNS20190540, Reactor Oversight Process Radiation Safety Inspection Procedure Update + (Reactor Oversight Process Radiation Safety Inspection Procedure Update)
- ML19168A197 + (Reactor Oversight Process Self Assessment Update 19JUN19_CY18 Self Assessment Results (Clean))
- ML15131A448 + (Reactor Oversight Process Task Force FAQ Log - April 16, 2015)
- ML16210A430 + (Reactor Oversight Process Task Force FAQ Log July 14,2016)
- ML18072A065 + (Reactor Oversight Process Task Force FAQ Log, March 1, 2018)
- ML16127A335 + (Reactor Oversight Process Task Force FAQ Log-April 13, 2016)
- ML15096A204 + (Reactor Oversight Process Transition Plan for Watts Bar Nuclear Plant, Unit 2)
- ML24023A026 + (Reactor Oversight Process Whitepaper – Modification of the Description of Unplanned Scrams with Complications Performance Indicator to Reflect AP1000 Design (Rev. 1))
- ML13162A585 + (Reactor Oversight Program Info)
- ML20085A471 + (Reactor Performance Status Rept for Apr 1974.Answers Found Give Raise to New Questions.Confusion Exists on Higher Level)
- ML20054H830 + (Reactor Physics Design Calculations for the Acpr Upgrade)
- ML20266B830 + (Reactor Plant 3X3 Instrumented Fuel Assy General Assy)
- ML20266B816 + (Reactor Plant 3x3 Fuel Assembly for Instrumentation)
- ML041910310 + (Reactor Plant Event Notification Worksheet, EN 37839, Facility: Susquehanna LLC)
- ML20266B834 + (Reactor Plant Fuel Assembly)
- ML20262D426 + (Reactor Plant Heating & Ventilating System)
- ML20085D228 + (Reactor Plant Operating Experience Rept Apr 1962-1963)
- ML20262D444 + (Reactor Plant Piping Section K-K, as-built)
- ML20266B825 + (Reactor Plant Type L Assy)
- ML24355A140 + (Reactor Plenum Flow Meters License Amendment)
- ML24355A141 + (Reactor Plenum Flow Meters License Amendment)
- ENS 41085 + (Reactor Power Being Reduced Due to Entering Ts 3.0.3 Because of Inopeable Recirc Vent System)
- ML18151A894 + (Reactor Power Distribution Analysis Using Moveable In-Core Detection Sys & Tip/Cecor Computer Code Package)
- ENS 48402 + (Reactor Power Exceeded Fsar Analyzed Value)
- ENS 43830 + (Reactor Power Inadvertently Increased Above Accident Analysis Limit)
- ENS 42187 + (Reactor Power Operation in Excess of Operating License Condition)
- 05000313/FIN-2018003-06 + (Reactor Power Transient Caused by the Turbine Bypass Valve Failing Open)
- 05000400/FIN-2013002-05 + (Reactor Power Transient Due to Inadvertent Isolation of the 4B Feedwater Heater)
- GO2-95-277, Reactor Power Uprate Startup Test Rept, for WNP-2 + (Reactor Power Uprate Startup Test Rept, for WNP-2)
- ENS 43627 + (Reactor Pressure Boundary Leakage)
- ENS 48853 + (Reactor Pressure Boundary Leakage)
- 05000286/FIN-2018002-01 + (Reactor Pressure Boundary Leakage Due to Weld Failure in Reactor Vessel Head Penetration #3)
- 05000341/LER-2023-003, Reactor Pressure Boundary Leakage at Socket Weld on Reactor Recirculation Sample Line Caused by Fatigue Failure + (Reactor Pressure Boundary Leakage at Socket Weld on Reactor Recirculation Sample Line Caused by Fatigue Failure)
- ENS 51861 + (Reactor Pressure Bounday Leakage)
- ML20078D843 + (Reactor Pressure Vessel)
- ML20203C710 + (Reactor Pressure Vessel & Surveillance Program Matls Licensing Info for Surry Units 1 & 2)