On March 26, 2013, at 1635 [CDT], with Unit 1 shutdown for refueling, leakage was identified from the 2-inch reactor head vent line during a
Reactor Pressure Vessel (
RPV) pressure test. The leakage was approximately 20 drops per minute. The
RPV pressure test was stopped and the reactor vessel depressurized to facilitate examination of the piping and associated
flange connections. At
0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br /> on March 27, 2013, the leak was confirmed to be through-wall originating from a socket
weld (i.e., pipe elbow). The cause and resolution are under evaluation. The condition is being reported under 50.72(b)(3)(ii)(A) given the defect was associated with the primary coolant system pressure boundary.
The licensee notified the NRC Resident Inspector