Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030580629 + (RAI, Topical Report VEP-FRD-42, Revision 2, Reload Design Methodology)
- ML020250145 + (RAI, Torus-To-Drywell Vacuum Breakers)
- ML042050001 + (RAI, Training and Qualification)
- ML042100121 + (RAI, Training and Qualification Plan)
- ML042100118 + (RAI, Training and Qualification Plan)
- ML042100067 + (RAI, Training and Qualification Plan)
- ML042100092 + (RAI, Training and Qualification Plan)
- ML041950442 + (RAI, Training and Qualification Plan)
- ML042180344 + (RAI, Training and Qualification Plan)
- ML042180340 + (RAI, Training and Qualification Plan)
- ML042180333 + (RAI, Training and Qualification Plan)
- ML042180356 + (RAI, Training and Qualification Plan)
- ML042100081 + (RAI, Training and Qualification Plan)
- ML011730445 + (RAI, Transmittal of Staff Questions Related to Staff Review of MRP-44, Part 2 PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for U.S. PWR Plants (MRP-44), Part 2: Reactor Vessel Top Head Penetrations, TP-1001491, Par)
- ML071840006 + (RAI, Twelfth Refueling Outage Steam Generator Service Inspection Summary Report)
- ML023380703 + (RAI, Unit 1 Steam Generator Replacement Topical Reports and Associated TS Amendment)
- ML050040264 + (RAI, Use of Alternate Source Term)
- ML050960539 + (RAI, Use of Gothic 7 in Containment Analyses)
- ML020110027 + (RAI, a Change to the Facility Descriptions)
- ML092470551 + (RAI, for Environmental Review Renewal Application)
- ML060040165 + (RAI, the Cycle 13 Steam Generator Tube Inservice Inspections)
- ML022190015 + (RAI, to Emergency Plan Changes)
- ML072270247 + (RAI, to Extend the Completion Times, Bypass Test Times, & Surveillance Test Intervals for Reactor Protection Systems & Engineered Safety Features Actuation System Instrumentation)
- ML053250093 + (RAI, to Support Increase in the Lead Rod Average Burnup Limit)
- ML043090439 + (RAI- Proposed Third 10-year Interval Inservice Testing Program Plans)
- ML103540108 + (RAI-02 & RAI-03 for Nitrogen Tank Level LAR (ME4131/ME4132))
- ML23304A021 + (RAI-10109-R1-Final)
- ML23304A021 + (RAI-10109-R1-Final)
- ML24207A180 + (RAI-10250- Framatome TR, ANP-10350P, Rev. 0 APOLLO2-A- Artemis B - (Non-proprietary))
- ML25017A271 + (RAI-10462-R1-Final)
- ML25111A011 + (RAI-10527-R1)
- ML25083A090 + (RAI-10551-R1-FINAL NON-PROPRIETARY Redacted U.S. NRC RAIs for Westinghouse Topical Report WCAP-16747-P/NP, Revision 2, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D)
- ML21141A152 + (RAI-31 - Actual CO2e Emissions Calculations)
- ML24199A184 + (RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version)
- ML24254A454 + (RAI-holding Ponds)
- ML24191A423 + (RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP)
- ML092880811 + (RAI: Decommissioning Fund Plan (ME0487))
- ML18171A290 + (RAI: Green River, Utah, Disposal Site Groundwater Compliance Action Plan Requests for Additional Information: Enclosure)
- ML023120447 + (RAI: Hatch Relief Request RR-34, Revision 1, and RR-37)
- ML102170303 + (RAI: Point Beach Nuclear Plant, Units 1 and 2 License Amendment Request (LAR-264) Dated January 27, 2010 Diesel Fuel Oil Storage Requirements)
- ML051330301 + (RAIs)
- ML24344A084 + (RAIs - TSTF-500 LAR)
- ML19114A435 + (RAIs 4-4-19 r3)
- ML13330A585 + (RAIs Associated with Review of Salem, Unit 2, 2R19 Steam Generator Tube Inspections)
- ML18345A203 + (RAIs Environmental Review and Environmental Impact Statement for Holtec CISF)
- ML13154A470 + (RAIs Following Ifib Analysis 2013 Decommissioning Funding Status Report for Prairie Island 1 and 2 and Monticello)
- ML13154A483 + (RAIs Following Ifib Analysis of APs 2013 Decommissioning Funding Status Report for Palo Verde Units 1, 2 and 3)
- ML13154A431 + (RAIs Following Ifib Analysis of Edisons 2013 Decommissioning Funding Status Report for San Onofre Units 2 and 3)
- ML13154A439 + (RAIs Following Ifib Analysis of FENOCs 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2)
- ML13154A444 + (RAIs Following Ifib Analysis of FENOCs 2013 Decommissioning Funding Status Report for Davis-Besse and Perry)
- ML13154A511 + (RAIs Following Ifib Analysis of NextEra Energys 2013 Decommissioning Funding Status Reports for Duane Arnold Energy Center and Point Beach Units 1 and 2)
- ML13154A505 + (RAIs Following Ifib Analysis of NextEra Energys 2013 Decommissioning Funding Status Reports for Seabrook)