Category:Calculation
MONTHYEARML21141A1522021-03-24024 March 2021 RAI-31 - Actual CO2e Emissions Calculations 2021-03-24
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML21141A1522021-03-24024 March 2021 RAI-31 - Actual CO2e Emissions Calculations ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staffs Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20294A0562020-07-30030 July 2020 Westinghouse Columbia Fuel Fabrication Facility Hf Spiking Station 1 Assessment Report ML20255A2702020-02-25025 February 2020 Westinghouse Electric Co, LLC - NRC Semi-Annual Discharge Report, July - December 2019, Annual Assessment of Public Dose Due to Liquid and Gaseous Effluents 2023-01-26
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML22080A2822022-03-21021 March 2022 Westinghouse, Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22074A1292022-03-15015 March 2022 Westinghouse - Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22052A0122022-02-21021 February 2022 Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML21102A0692021-04-0606 April 2021 Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Commitments ML21141A1522021-03-24024 March 2021 RAI-31 - Actual CO2e Emissions Calculations ML21141A1512021-03-24024 March 2021 Clarification Needs-Westinghouse Lr EIS-WEC Response ML20353A2782020-12-18018 December 2020 Enclosure 2 - Response to Request for Additional Information - March 2019 Environmental Report Updates ML20353A2792020-12-18018 December 2020 Enclosure 3 - Response to Request for Additional Information - Cww Well Permit and Approval ML20353A2832020-12-18018 December 2020 Enclosure 7 - Response to Request for Additional Information - Facility Wide Criteria and Tap Model ML20353A2842020-12-18018 December 2020 Enclosure 8 - Response to Request for Additional Information - Table 2 - Emission Calculations for Industrial Incinerator ML20353A2862020-12-18018 December 2020 Enclosure 9 - Response to Request for Additional Information - Table 6 - Industrial Incinerator; Emission Calculations for Metals, Acid Gases, and Dioxin/Furans ML20353A2872020-12-18018 December 2020 Enclosure 10 - Response to Request for Additional Information - Sum of Fractions of Isotopic Uranium in Soil Beneath Sea-Land Containers Figures ML20353A2892020-12-18018 December 2020 Enclosure 12 - Response to Request for Additional Information - DHEC Response to Hf Spiking Station 2 Assessment Report ML20353A2902020-12-18018 December 2020 Enclosure 13 - Response to Request for Additional Information - LTR-RAC-19-64, Manifests for Hfss 2 Soil Remediation ML20353A2912020-12-18018 December 2020 Enclosure 14 - Response to Request for Additional Information - Monthly Discharge Monitoring Reports ML20353A2922020-12-18018 December 2020 Enclosure 15 - Response to Request for Additional Information LTR-RAC-18-81 Hf Spiking Station 2 Summary Westinghouse Nuclear Fuel Facility Hopkins, Sc ML20353A2932020-12-18018 December 2020 Enclosure 16 - Response to Request for Additional Information - Soil & Materials Engineers, Inc., 1982, Ground-Water Hydrology of the Westinghouse Electric Corporation Plant, Richland County, South Carolina: Report No. H-8119, March 1, 1982 ML20353A2972020-12-18018 December 2020 Enclosre 20 - Response to Request for Additional Information - May 2019 Air Permit Renewal Application Table 4 - Emission Calculations for Scrubber ML20353A3242020-12-18018 December 2020 Enclosure 21 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Appendix 2.E ML20353A3272020-12-18018 December 2020 Enclosure 24 - Site CSM Cross Sections, 2.5X Vertical Exaggeration and 15X Vertical Exaggeration, Conceptual Site Model Rev. 1a ML20353A3282020-12-18018 December 2020 Enclosure 25 - Response to Request for Additional Information, Boring Logs ML20353A3352020-12-18018 December 2020 Enclosure 28 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 6 ML20353A2962020-12-18018 December 2020 Enclosure 19 - Response to Request for Additional Information - Preliminary Human Health Risk Assessment Westinghouse Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins South Carolina ML20353A2802020-12-18018 December 2020 Enclosure 4 - Response to Request for Additional Information - Phase II Remedial Investigation Work Plan ML20353A2772020-12-18018 December 2020 Enclosure 1 - Response to Request for Additional Information Re Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License ML20353A2942020-12-18018 December 2020 Enclosure 17 - Response to Request for Additional Information - 2018/2019 Annual Groundwater Report ML20353A2882020-12-18018 December 2020 Enclosure 11 - Response to Request for Additional Information - RA-433, Environmental Remediation ML20353A2812020-12-18018 December 2020 Enclosure 5 - Response to Request for Additional Information - RAF-104-5, Environmental Protection Guidelines and Checklist ML20353A2822020-12-18018 December 2020 Enclosure 6 - Response to Request for Additional Information - TAF-500-11, 10 CFR 70.72 Engineering Pre-screening Checklist ML20353A3292020-12-18018 December 2020 Enclosure 26 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 5 ML20353A3342020-12-18018 December 2020 Enclosure 27 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 2 ML20317A1912020-11-12012 November 2020 Westinghouse Response to Request for Additional Information Schedule- Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License (Enterprise Project Identifier L-201-RNW-0016) ML20287A5462020-10-12012 October 2020 Westinghouse - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5522020-09-22022 September 2020 Attachment 1 - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5512020-09-22022 September 2020 Westinghouse Electric Company, LLC - Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste ML20063P3272020-02-29029 February 2020 Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML18257A0622018-09-13013 September 2018 Response to Request for Additional Information Westinghouse Electric Company WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18144A9942018-05-24024 May 2018 Westinghouse Electric Company, LLC - Response to Request for Additional Information Regarding Application for NRC Consent to License Transfer (EPID L-2018-LLM-0001) ML18005A5362018-01-0505 January 2018 Westinghouse - Response to Request for Additional Information (TAC # L33317)re License Renewal Application for Columbia Fuel Fabrication Facility 2022-03-21
[Table view] |
Text
Westinghouse Electric Company LLC Example Actual Emissions Calculations for CO2e Calendar Year 2020 Primary Fuel: Natural Gas Low NOx burners 2020 EF (lb/106 ft3) 120,000 0.64 2.3 Facility-Wide Fuel Usage Pollutant CO2 N2O CH4 Primary Fuel (106 ft3)
(short tons/yr)
(short tons/yr)
(short tons/yr)
Natural Gas 112.12 6,727 0.036 0.129 GWP 1
298 25 CO2e (short tons/yr)
CO2e (metric tons/yr)
CO2e 6,727 10.69 3.22 6,741.24 6,115.55 Notes:
- 1. AP-42 Section 1.4, Table 1.4-2 Back Up Fuel:
No. 2 Fuel Oil (Diesel Fuel) 175 gallons/hr, maximum hourly diesel fuel demand by operating boiler during natural gas curtailment 26 days of natural gas curtailment in 2020 624 hours0.00722 days <br />0.173 hours <br />0.00103 weeks <br />2.37432e-4 months <br /> of natural gas curtailment in 2020 109,200 maximum gallons of diesel fuel used in the boilers during natural gas curtailment in 2020 2020 Estimated Worst Case EF (lb/103 gallon) 22,300 0.26 0.052 Usage During Natural Gas Curtailment Pollutant CO2 N2O CH4 Back Up Fuel (103 gallons)
(short tons/yr)
(short tons/yr)
(short tons/yr)
Diesel Fuel 109.20 1,218 0.014 0.003 GWP 1
298 25 CO2e (short tons/yr)
CO2e (metric tons/yr)
CO2e 1,218 4.23 0.07 1,221.88 1,108.47 Notes:
- 1. AP-42 Section 1.3, Tables 1.3-3, 1.3-8, and 1.3-12 (industrial boilers) short tons/yr metric tons/yr Total CO2e 7,963.12 7,224.02