Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Preliminary Issue List, with Handwritten Notes". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML23017A156  + (Preliminary Hermes CP SE Chapter 11, Radiation Protection and Waste Management for ACRS)
  • ML23017A157  + (Preliminary Hermes CP SE Chapter 12, Conduct of Operations for ACRS)
  • ML23017A159  + (Preliminary Hermes CP SE Chapter 14, Technical Specifications for ACRS)
  • ML23017A160  + (Preliminary Hermes CP SE Chapter 16, Other License Considerations for ACRS)
  • ML23017A162  + (Preliminary Hermes CP SE Chapter 17, Decommissioning and Possession-Only License Amendments for ACRS)
  • ML23017A163  + (Preliminary Hermes CP SE Chapter 18, Highly Enriched to Low-Enriched Uranium Conversion for ACRS)
  • ML23017A149  + (Preliminary Hermes CP SE Chapter 5, Reactor Coolant System for ACRS)
  • ML23017A150  + (Preliminary Hermes CP SE Chapter 7, Instrumentation and Control Systems for ACRS)
  • ML23017A151  + (Preliminary Hermes CP SE Chapter 8, Electrical Power Systems for ACRS)
  • ML23017A152  + (Preliminary Hermes CP SE Chapter 9, Auxiliary Systems for ACRS)
  • ML17212A369  + (Preliminary Human Engineering Assessment of St Lucie Unit 2 Nuclear Power Plant Control Room)
  • ML20042G659  + (Preliminary Hydrogeologic Investigation Rept Cintichem Facility Long Meadow Road Tuxedo,Ny)
  • ML20115K165  + (Preliminary Hydrogeological Investigation Saxton Nuclear Experimental Station Saxton,Pa)
  • ML20128N237  + (Preliminary Idcor Task 23.1 - Integrated Containment Analysis)
  • ML19220C867  + (Preliminary Info Re Plant Status as of 790402.Measurements Indicate Vol of Gases within Bubble Significantly Reduced)
  • ML19220C866  + (Preliminary Info Re Plant Status as of 790403.Reactor Pressure Remains at 1,000 Psi W/Bulk Cord & Coolant Temp at 280 F)
  • ML19220C865  + (Preliminary Info Re Plant Status.Containment Atmosphere Measurements Indicate About 2% Hydrogen)
  • ML19208B246  + (Preliminary Info on Mgt & Technical Resources Available to Handle TMI-type Event.One Oversize Organizational Chart Encl)
  • ML21351A028  + (Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56)
  • ML051460219  + (Preliminary Information on ERDS Delay)
  • L-2009-305, Preliminary Insights for CCW System Air Intrusion Events  + (Preliminary Insights for CCW System Air Intrusion Events)
  • ML20083Q711  + (Preliminary Investigation of Interconnected Sys Interactions for Safety Injection Sys of Indian Point 3)
  • ML20148M901  + (Preliminary Investigation of Turbulent Reactive Mixing in Pcrv/Cv Gas Mixtures)
  • ML19309A939  + (Preliminary Investigation-Facility Site)
  • ML053250415  + (Preliminary Issue List)
  • ML053250417  + (Preliminary Issue List, with Handwritten Notes)
  • ML20038C025  + (Preliminary Issue Paper of Rockland County,Ny.Lists Major Defects of Emergency Response Plan)
  • ML19206B381  + (Preliminary Licensing Rept for Westinghouse Decay Heat Removal Sys)
  • ML20197J896  + (Preliminary Licensing Statement/Proposed License for Umetco Uraven Facility,Umetco-Raven Disposal of Radioactive Matls from Sites Located within Colorado)
  • ML22013B183  + (Preliminary List of Exceptions, Clarifications, and Additions to NEI 21-07, Revision 0-B, Technology Inclusive Guidance for Non-Light Water Reactors: Safety Analysis Report for Applicants Utilizing the NEI 18-04 Methodology)
  • ML20039B691  + (Preliminary Methodology for Manual Dose Assessment for Emergency Preparedness)
  • ML20127M551  + (Preliminary Model for Core/Concrete Interactions)
  • ML19351E699  + (Preliminary Model of Steam Sector Test Facility Using TRAC-BD1 Computer Program, Technical Rept)
  • ML20028D771  + (Preliminary Neutronics Calculations for the Super Sara Test Program)
  • ML19317D725  + (Preliminary Notice of Possible Deficiency Pending Results of Investigation Re Pencil Marks on X-ray Film of Pipe Welds Obscuring True Penetrameter Reading)
  • ML19326A048  + (Preliminary Notification PN-III-76-28:on 760423,vendor Former Employees Alleged That safety-related Electrical Work Records Falsified at Facility.Info Received W/O Verification or Evaluation.News Media Coverage Expected)
  • ML091190725  + (Preliminary Notification of Event of Unusual Occurrence, PNO-1-08-012; Subject Results of Implementation of Oyster Creek License Renewal Commitments Related to the Drywell Primary Containment, with Hand Written Notes)
  • ML13316C262  + (Preliminary Notification of Event or Unusual Occurrence - PNO-II-13-008, Oconee Unit 1 Shutdown Due to Reactor Coolant System (RCS) Pressure Boundary Leakage)
  • ML030870376  + (Preliminary Notification of Event or Unusual Occurrence -- PNO-III-02-036)
  • ML100760469  + (Preliminary Notification of Event or Unusual Occurrence - PNO-1-09-006, with Handwritten Notes)
  • ML102030237  + (Preliminary Notification of Event or Unusual Occurrence)
  • ML20244D804  + (Preliminary Objections to ASLB Proposed Witnesses & Documents for Initial Phase of Proceeding & Author Proposed Witnesses & Documents.Certificate of Svc Encl.Related Correspondence)
  • ML24347A149  + (Preliminary Observations Comments Questions on NEI EPZ White Paper 14 Nov 2024)
  • ML24347A143  + (Preliminary Observations Comments Questions on NEI EPZ White Paper 14 Nov 2024)
  • ML082880455  + (Preliminary Oconee LAR Acceptance Review Matrix)
  • ML20261C155  + (Preliminary Operations Network Level II Detroit Edison Company Enrico Fermi Unit 2. Drawing Consists of Two Aperture Cards)
  • ML19238A017  + (Preliminary P2 SER NuScale Ch 15 Redacted Version - Clean)
  • ML20132F352  + (Preliminary Part 21 Rept Re 3.5-inch Crack on Snubber Ball Bearing.Vendor Attempting to Have Bearing Returned for Exam & Evaluation by Skf Industries.Next Rept Will Be Submitted When Significant Info Available)
  • ML20141K771  + (Preliminary Part 21 Rept Re Parsons Peebles/Electric Products Generators W/Modified Bearing Insulation.Util Implemented Mod to Add Insulation to Outer Spacer Ring)
  • ML19246A374  + (Preliminary Peak Data for 790328)
  • ML19224B491  + (Preliminary Peak Data on Nuclides Observed)