Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC 2013-0028, Point Beach Nuclear Plant, Units 1 and 2: License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 + (Point Beach Nuclear Plant, Units 1 and 2: License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 3)
- NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix C + (Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix C)
- NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis + (Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis)
- NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 11 - Waste Disposal Systems and Radiation Protection + (Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 11 - Waste Disposal Systems and Radiation Protection)
- NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D + (Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D)
- NRC 2009-0096, Point Beach, Unit 1 - Response to Request for Additional Information Re Fall 2008 Unit 1 (U1R31) Steam Generator Tube Inspection Report + (Point Beach, Unit 1 - Response to Request for Additional Information Re Fall 2008 Unit 1 (U1R31) Steam Generator Tube Inspection Report)
- NRC 2008-0081, Point Beach, Unit 1, Cycle 32 (U1C32) Core Operating Limits Report. + (Point Beach, Unit 1, Cycle 32 (U1C32) Core Operating Limits Report.)
- NRC 2010-0102, Point Beach, Units 1 & 2 - License Amendment Request 265, Revision to Reactor Vessel Head Drop Methodology, Supplement 1 + (Point Beach, Units 1 & 2 - License Amendment Request 265, Revision to Reactor Vessel Head Drop Methodology, Supplement 1)
- NRC 2008-0028, Point Beach, Units 1 & 2, Confirmatory Action Letter CAL 3-04-001 Regulatory Commitment Chanqe - OR-01-004 + (Point Beach, Units 1 & 2, Confirmatory Action Letter CAL 3-04-001 Regulatory Commitment Chanqe - OR-01-004)
- NRC 2008-0044, Point Beach, Units 1 & 2, License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control + (Point Beach, Units 1 & 2, License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control)
- NRC 2010-0029, Point Beach, Units 1 & 2, Submittal of Fitness for Duty Performance Data for Period Ending December 31, 2009 + (Point Beach, Units 1 & 2, Submittal of Fitness for Duty Performance Data for Period Ending December 31, 2009)
- NRC 2008-0085, Point Beach, Units 1 & 2, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 + (Point Beach, Units 1 & 2, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241)
- NRC 2009-0044, Point Beach, Units 1 and 2 - Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study + (Point Beach, Units 1 and 2 - Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study)
- NRC 2009-0082, Point Beach, Units 1 and 2 - Transmittal of Background Information to Support License Amendment Request 261, ATC Lnterim Operation and Impacts Re-Study + (Point Beach, Units 1 and 2 - Transmittal of Background Information to Support License Amendment Request 261, ATC Lnterim Operation and Impacts Re-Study)
- NRC 2009-0121, Point Beach, Units 1 and 2, Transmittal of Information to Support License Amendment Request 241 Pbnp Vnpab and CREFS Seismic Evaluation + (Point Beach, Units 1 and 2, Transmittal of Information to Support License Amendment Request 241 Pbnp Vnpab and CREFS Seismic Evaluation)
- ML031990332 + (Point Beach/Kewaunee Meeting Summary Slides, Nuclear Management Companys Reactor Pressure Vessel Head Replacement Project)
- B12413, Point Nuclear Power Station,Unit 1 Single-Loop Operation + (Point Nuclear Power Station,Unit 1 Single-Loop Operation)
- NRC 2003-0021, Point Peach Nuclear Plant, Units 1 & 2 - Fitness-for-Duty (FFD) Program + (Point Peach Nuclear Plant, Units 1 & 2 - Fitness-for-Duty (FFD) Program)
- 05000301/LER-2010-003, Point Peach, Unit 2, Regarding Technical Specification Required Shutdown + (Point Peach, Unit 2, Regarding Technical Specification Required Shutdown)
- ML20082H697 + (Point Pleasant Pumping Facilities Operational Environ Noise Assessment)
- ML16158A288 + (Point Presentations -NRC Inspection Report No. 05000295/05000304 (DNMS))
- ML032250090 + (Point Service List)
- B13206, Point Site Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept 1988 + (Point Site Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept 1988)
- B13513, Point Site Radiological Environ Monitoring Program,1989 + (Point Site Radiological Environ Monitoring Program,1989)
- B11501, Point Site,Radiological Environ Monitoring Program Annual Environ Operating Rept,Part B,1984 + (Point Site,Radiological Environ Monitoring Program Annual Environ Operating Rept,Part B,1984)
- ML20265B401 + (Point Source Cobalt 60)
- ML14321A064 + (Point Unit 2, MF3056, LAR Mellla+, Supplement to the Simulator Audit Plan)
- ML24025A115 + (Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3))
- ML20041C345 + (Point of Information Notifying All Parties That Any Attempt by Applicant to Salvage Findings Produced by Incomplete Info,Studies & Misleading Pressure & Haste Should Be Rejected.Certificate of Svc Encl)
- L-2008-150, Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 2 + (Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 2)
- NRC 2007-0071, Point, Correspondence Service List + (Point, Correspondence Service List)
- ML20149K606 + (Point, Units 3 and 4 - Issuance of Temporary Exemption Concerning Security Training Requirements)
- ENOC-08-00027, Point,Supplemental Information 6 Relating to Application for Order Approving Indirect Transfer of Control of Licenses, + (Point,Supplemental Information 6 Relating to Application for Order Approving Indirect Transfer of Control of Licenses,)
- ML13316A775 + (Pointer in ADAMS to Public Document Room for SQN Ghg Excel Spreadsheets, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAIs 6.a.i.2 - 8 Referenced in the SQN License Renewal Supplemental Environmental Impact Statement)
- ML19256A156 + (Points Out 2 Typographical Errors Found in Review of 781005 Initial Decision.Page 12,Line 1 of Finding 12,A Johnson Was a Pge Witness.Page 28,Line 2 of Finding 42,inevitable Should Be Incredible)
- ML20248B601 + (Points Out Critical Importance of Having Qualified Professionals When Using Radioisotopes Diagnostically)
- ML20078B808 + (Points Out Factual Error by NRC in Commission 830912 Meeting on Status of near-term OL Plants.Diesel Generators at Plant Are Models DSR-4-8,w/eight Cylinders,Not V-16)
- ML20126L816 + (Points Out Problems That Occurred W/Amend Request Re Emergency Diesel Generators Involving Ambiguity Caused by Imprecision in Language,To Illustrate Need for Careful Review of Future Amend Requests)
- ML19338F269 + (Points Out Statement Made by EC Tsivoglou Re Environ Radiation Protection at Plant.Radiation Releases Not Alap Based on Technology Available.Aec Has Responsibility to Correct Situation)
- ML20263S343 + (Poison Design - Rack Assy Type 66)
- ML20263S316 + (Poison Design Fuel Storage Rack Box Details)
- ML20263S335 + (Poison Design Lead-in Guide & Poison Insert Details & Assembly)
- ML20263S332 + (Poison Design Poison Insert Assembly & Details)
- ML20263S346 + (Poison Design Rack Assy Type 55)
- ML20263S338 + (Poison Design Rack Assy Type 72-1 Thru 72-4)
- ML20263S340 + (Poison Design Rack Assy Type 80-1 Thru 80-8)
- ML20263S348 + (Poison Design Spent Fuel Storage Location Identification Numbers (Lin))
- ML070670329 + (Poisonous Plant Slides - Fly Poison)
- ML20049H908 + (Polar Crane Checkout)
- ML19339C425 + (Polar Crane Load Paths:Plan Mezzanine Floor Elevation 617 Ft)
- ML25113A192 + (Polaris-PARCS Sensitivity Study on LWR Fuel Cycles Polaris Input Options)