Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20238A349 + (Plans and Schedules for Implementation of U.S. Nuclear Regulatory Commission Responsibilities Under the LOW-LEVEL Radioactive Waste Policy Amendments Act of 1985 (P.L. 99-240))
- ML20009B769 + (Plans for Assessment of Best Estimate LWR Systems Codes)
- ML080780490 + (Plans for Development of Independent Spent Fuel Storage Facility (ISFSI) at the Site of the La Crosse Boiling Water Reactor (LACBWR) in Genoa, Wisconsin)
- ML030660468 + (Plans for Implementing the Davis-Besse Lessons Learned Task Force Recommendations)
- ML062570188 + (Plans for Pursuing Combined Construction and Operating License (COL) Applications)
- ULNRC-05355, Plans for Pursuing Feasibility and Environmental Impact Studies for New Nuclear Generation at the Callaway Site + (Plans for Pursuing Feasibility and Environmental Impact Studies for New Nuclear Generation at the Callaway Site)
- ML020880630 + (Plans for Repair of Recirculating Cooling Water (Rc) System Expansion Joints)
- NL-06-0326, Plans for Replacement of Eaton Freedom Series Heater Packs + (Plans for Replacement of Eaton Freedom Series Heater Packs)
- BSEP 02-0043, Plans for Resolution of NRC Generic Letter 92-08, Thermo-Lag 330-1 Fire Barriers + (Plans for Resolution of NRC Generic Letter 92-08, Thermo-Lag 330-1 Fire Barriers)
- ML13234A533 + (Plans for Spent Fuel Pool Alterations and Confirmatory Action Letter (4-12-004) - Comanche Peak Nuclear Power Plant, Units 1 and 2, Commitments Regarding Spent Fuel Pool Storage Practices)
- ML19289F937 + (Plans for Staffing Emergency Teams at TMI-2)
- ML042890218 + (Plans for Submittal of Preliminary Decommissioning Cost-Estimate)
- ML19263D621 + (Plans to Complete Change Out of Buna-N Matl in Hydraulic Control Units During Next Scheduled Refueling/Maint Outage)
- ML19289C686 + (Plans to File Motion Regarding Propriety of Continuing Hearings.Believes Need for Hasty Action Re Floating Nuclear Plants Has Subsided)
- ML19282A108 + (Plans to Modify QA Program in Order to Implement Shipping Activities.No Further Shipments of Type B Radwaste Will Be Made Until Approval Is Received from NRC)
- ML19211A671 + (Plans to Perform Inaccessible Areas Insp Required by IE Bulletins 79-02 & 79-14 During 791125 Refueling Outage)
- L-79-330, Plans to Respond by 791221 to 790918 Request for Info Re Potential for Steam Generator Water Hammer at PWRs W/ Feedrings That Discharge from Bottom.Manpower Demands Generated by NUREG-0578 Prevent Response at Present + (Plans to Respond by 791221 to 790918 Request for Info Re Potential for Steam Generator Water Hammer at PWRs W/ Feedrings That Discharge from Bottom.Manpower Demands Generated by NUREG-0578 Prevent Response at Present)
- ML102000379 + (Plant)
- ML20266J701 + (Plant)
- ML20266J697 + (Plant)
- ML21155A213 + (Plant)
- ML20097C343 + (Plant 1995 Annual Exercise 95-10A Onsite Scenario)
- ML17286A360 + (Plant 2 Exercise 90, Consisting of Exercise Packet & Exercise Packet Control Cell Addendum for 900911 Exercise)
- ENS 40426 + (Plant Access Terminated Due to Positive Fitness for Duty Test)
- ML20053A481 + (Plant Annunciator Summary)
- ML20266F556 + (Plant Area)
- ML20263G392 + (Plant Area - Grading & Drainage Plan, as-built)
- ML19341A146 + (Plant Area Foundation:Fault Locations)
- ML20263T114 + (Plant Area Grading & Drainage - Plan, as-built)
- ML17324A170 + (Plant Area Stage I Class I Backfill)
- ML17324A169 + (Plant Area Stage II Class I Backfill.Sheet 1)
- ML20262F547 + (Plant Area Telephone System Riser Diagram)
- ML20266B457 + (Plant Area Telephone System Riser Diagram)
- ML20262D101 + (Plant Area Telephone System Riser Diagram)
- ML20261D124 + (Plant Area:Grading & Drainage - Plan, as-built)
- ML20261D127 + (Plant Area:Grading & Drainage - Sections & Details, as-built.Consists of Two Aperture Cards)
- ML20263J095 + (Plant Areas Conduit Arrangement Plan at Turbine Deck. Sheet 2 of 2)
- ML17325A466 + (Plant Arrangement Mezzanine Floor El 609 Ft 0 Inches Units 1 & 2)
- ML17325A465 + (Plant Arrangement Sections G-G,H-H,J-J & K-K Units 1 & 2)
- ML062120469 + (Plant Audit Report--Watts Bar Unit 1 Nuclear Plant New Sump Design in Response to Audit Report)
- 05000461/FIN-2017001-01 + (Plant Barrier Control Program Failed to Compensate for an Impacted Flood Barrier ()
- 05000454/FIN-2008002-02 + (Plant Barrier Impairment Permit Not Followed)
- ML20266F451 + (Plant Boring Plan)
- ML20052F051 + (Plant Cancelations from FY75 to First Quarter FY82.Related Info Encl)
- ML19224B427 + (Plant Chemistry Procedure 1800.4:chemistry Inventory)
- L-MT-15-046, Plant Completion of Reqiuired Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation + (Plant Completion of Reqiuired Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation)
- ENS 47543 + (Plant Computer Calculation Incorrect for Back-Up Meteorological Data)
- ENS 42971 + (Plant Computer Down for Upgrade)
- ENS 46442 + (Plant Computer Maintenance Outage)
- ENS 44843 + (Plant Computer Oos for Scheduled Maintenance Taking Erds Oos)
- ML19220C858 + (Plant Computer print-out for 790328)