ML20053A481
| ML20053A481 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/05/1982 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20053A474 | List: |
| References | |
| 0030131, 30131, NUDOCS 8205260136 | |
| Download: ML20053A481 (6) | |
Text
,
DCCUMENT REVISION DISTRIBUTION SHEET - OFF '!ORMAL & EMERGENCY CPE
R. PROCEDURE
DCCUMENT TITLE Plank 4 n nu n c i e. b e_ G m.~ v' DOCUMENT FILE NUMBER do3 OI 4/
DOCUMENT REVISION NUMBER D
DOCUMENT DISTRIBUTED OM f-d h
DATE DCCUMENT SENT TO:
COPY TRANSMITTAL COPY TRAMSMIT AL NO.
DOCUMENT EOLDER RETURNED NO.
DOCUMENT EOLDER RETUP21ED MASTER UNCONTROLLED COPIES 1
2 NRC-Region II 3
Acts: EPPS 3RANCE CHIEF R. Paduano - GO 5
N. G. Roos ~
A. 'J.
Bailey 6
TSC G. Anglehart - CE Training 7
8 Training.
9
'Jatch Engineers I Training 3,4. v;w w 7-10
~'
- !"1-'*'*C C U
John Holwell-Backfit 12
.-t g.,s oio g - 1 a rrv 6464-13 14
~TRA14$46 T. Vogan - GO G. J. Boissy MM R. R. Jannings H. M. Mercer 6
RO 4 ^ ~ w' l
M - IE : HQ l
Acts: Chief, Nuclear Respen 3 ranch J. 3PwcJ<.
PROCESSED 3Y:
DATE a
- Note: New distribution per instructions. Eff ective 9-12-79. C., p%
.rbOf 8 20 5 2 6 013 (p v
0 RECORD REVISION SHEET ST. LUCIE PLANT - UNIT #1 s
Of f / Normal Operaeing 0030131 Type or Procedure Procedure No.
PLANT ANNUNCIATOR
SUMMARY
TITLE OF PROCEDURE Revision 20 Date Signed: [-[- O b Pages Affected:
1, A-6, B-6 x
l j~
INF0ui.?AT!0il 00LY FOR This document is not contro!bd. Before use l d documen verify inf ormation with a control e O
Page 1 of 3
.R FLORIDA POWER & LIGHT COMPANY ST. LUCIE PLANT UNIT NO. 1 j
OFF NORMAL OPERATING PROCEDURE NO. 0030131 a
i 1
l REVISION NO. 20 i
Ti' *:
~
FOR !!!F9!!f.1AT!0fl OflLY PLANT ANNUNCIATOR
SUMMARY
This document is not contro!!ed. Before use, verify information with e controlled document.
Reviewed by Plant Nuclear Safety Committee 19 Approved by Plant Manager 19 Rev.15 Reviewed by,Earpility Review Group A p,Q U.
6 19 7 i Acoroved by M//g/L/d flant Manager
-- t. h. / c - 192 (j
Bev. 20 Reviewed by Facility Review Group 1982.
Approved by 1 'l buAf Edlant Manager
.'#.a u c
1982.
m J.0 Purpose and Discussion:
This procedure provides an informative guide to operations personnel for resolving alarm conditions that are received on an annunciator panel in the St. Lucie Unit ill control center and local annunciator panels through-out the plant.
The actions listed are intended to be a guide in response to single annunciators, and are not intended to be a substitute for good judgment based on thorough understanding of plant conditions and equipment.
In cases where many annunciators are lighted simultaneously, operators are expected to respond to the root cause of the condition and maintain the unit in a safe condition in accordance with applicable off-normal and emergency procedures. Such action will not necessarily correspond to that on this list.
4.0 Symptoms
See attached annunciator sheets.
5.0 Instructions
5.1 Annunciators are catagorized on the following sheets by vertical rows from left to right.
4 4
l ANNUNCIATOR LIST NEV /0 ANNUN. PANLL B
VER T. COllMN 6
tytRC DIESkt. GEN lA
- 1. (al Alarmes if the diesel gen output bh r I. None RKR Fall. TO CIDSE falla to close 24-1 Sh 951 (b) Alarma 10 sec after diesel start op
- 2. Check breaker #20281 for fault
- 2. DC Control light will be green B-6 I
s eDFut DILSH. GEN LA
- 1. Aotn start signal present for 50 sec 1
smE thJINE with diesel speed not exceeding 200 rpm 1.
hone Sh 9"2 4
- g. gpggggg e
Diff hr m ter
- 2. Diesel generator voltage, frequency 2.(a) check local alarm for fault I"'I**EI""
(b) Refer to diesel generator annu ctator list for any local alarms pree mt (c) stop diesel generator if neces,ary EMERG DIESEL' GEN BA 1.
(a) 1.or k ou t energized or the start IDCFouT circuit frequency adjust nr 52,5),
Sh 957 voltage regulate 533 4 34 (b) Normal isolate switches in isol,te a
- 2. (a) check local panel for reason of lockout (b) reset Ibckout if condition is cleared B-26 EMERG DIESEL Cen. lA 1 (a) A..nunciates when local audible 1.
None/Possible Sprinkler Activation IDCAL Al. ARM /
alarms relay is energized or 2.
Determine cause of alasm by checking local K15 Sh 95H D. C. POWEk '
(1,1 l)/C Fler Svute** 14aal Alarm
' alarm panel resetjocal alarm /flght fire FAILDHE 1.
(a) Blown or missing D.C. Fuse (s)
I, Ninie InJ! cation 2.
Notify Elect. Dept., verify fuses installed 2.
Possible loss of speed or voltage c6ntrol oil / fuel pps, volt./ Cow control, exciter erk l-2,5-6,7-8, B-36 9'- 10, ll-12,13-12 R 'o or engine trip if rianning flasts ckta g5 16.l?-18 EMERG DIESEL CEN lA
- 1. (a) Starts Diesel ESS OVERRIDE Kl9,K26
- 2. Diesel will start & light indicating lights 2.
(a) Check for safegu.ared conditions
2 (b) Verify loading sequence B-46 ENERG DIESEL CEN lA
- 1. (a) Cen brk did not close in on 4160 Rus g, gon, BKR ClASE Fall.URE/
after 5 sec.
74-2 N'
I CS ISotATFD (b) Normal-Isolate switch is in isolate
- 2. (a) Check breaker #20211 for fault AA/Isol (c) Loss of DC control power (b) or return Normalf tsolate (d) Gen lakr close spring falls to tharge switch to smrmal
- 2. DC green light will be on H-56 t
WINDOW TITLE
- 1. INDICATED CONDITION L. AUTO ACTION SETPT. SENSING E! DIENT REFFRENCE
- 2. CONTROL ROOH INDICATION WHICil VERIFY OR
- 2. OPERATOR ACTION - VALID ALAR!!
...w...-
NUMBER & LOCATION e
===mm e
i i
r.
J ANNU NL I AlHK t.1 % I k t_V
/08 ANNUM. PANEI A
VERT. ColletN 6
I i
f.me r. Diesel Cen.
- 1) Indicates diesel gen. brkr did not close
- 1) None 74-1
.I ik on 4160 busses. Wi!! announce 10 sec.
- 2) Check ba kr -20401 for fault U
f l
B r e.e k e r fall after dessel startup.
Sheet 96
'y l
lo rause 2)
D.C.
green light will be on, f
4 h
A-6
,l t.Ht.kt.t.ht.Y isl LStl.
- 1) Auto start signal present for 50 sec.
1)' None 3
t.ue in ONE wit h diesel speed not exceeding 200 kPM
- 2) (a) Check local alarm for fault Diff. Pyrometer e
l.ta:lNk HO! HliNNING (h) Refer to diesel generator annuciator 3,
, 9g
- 2) Diesel generator voltage, frequency list for any local alarms present i nd i r.a t i on (c) Stop diesel generator if necessary A-16 I
I faer. Diese! Cen. IB l) (a) 1.oc kout emergized or the start circui I) None Im hout f requency adjust or voltage regulated 2)
(b) Normal 1stolate multches in isolate Check local panel for reason of lockout 57,53,333,334 Reset lockout if condir.lon is cleared
- 2) (a) loss of diesel D.C.
lights t
Sheet 967 A-26 1.
(a) 'Annunciates when local audible 1.
None /Possible Sprinkler Activation W rg. DieselI lb alarms relay !s energized or 2.
Determine cause of alarm by the) kin.
g)$
Sh 958 O^ dI ^I d'"[
(b) D/C Fire Systers local Alarm local alarm pane k reset local alarm IIR I II
1.
(a) Slown or missing D.C. Fuse (s) _
1.
None O'C' I"*"'
Id 8 3 "'
rnJ tt a t ion
)FR l-2,5-6,7-8, 2.
Notify Elect. Dept., verify fpses installed s-10,11-12,13-14, 2.
Possible loss of speed or vultage control A-X
"' "" Sine tr8P if running oll/ fuel pps, volt./ Gov control, ex iter 15-16,87-18 flash ckts ulo E"' Kr" C F
Diesel start indicating Ilghts
- 2) (a) Check for safeguards cosklition K-22 Sheet 967 LSS override energize (b) Verify loading sequence A-46
~
l'acrgency I) (a) Indicases delsel gen.did not close in
- 3) Nune 74 2 Dielsel-Cen. IB Brkr on 4160 buss after 5 sec.
- 2) (a) Check brkt #20401 for fault SS/Isol Close failure /
(b) Norm.il isolate switch is in isolate (b) or return surmal/ Isolate switch to Sheet 96)
CS isolated (c) 1.oss of D.C. control gw.wer normal (d) Cen. bekr close spring falls to change A- %
- 2) n t' a r ce.n I f elit ullI be on WINDOW TITLE
- 1. INDICATEli CONDITION
- 1. AUTO ACTION SETPT. SENSING El.f}f ENT REFERENCE
- 2. CowTROL ROOH INDICATION WillCil VERIFY OR
- 2. OPERATOR ACTION - VALID AM NUMBER & !.OCATION PINPolfil' TkollRI.E e