Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 47045 + (Overflow of Condenser Circulating Water)
- Information Notice 1988-12, Overgreasing of Electric Motor Bearings + (Overgreasing of Electric Motor Bearings)
- Regulatory Guide 1.104 + (Overhead Crane Handling Systems for Nuclear Power Plants)
- ML20050B536 + (Overhead Handling Sys Review, Final Rept)
- ML20055H245 + (Overheads/Passouts from NRC Review of San Onofre Nuclear Generating Station 1 Thermal Shield Design Analysis)
- ML20073L224 + (Overland Erosion of Uranium Mill Tailings Impoundments: Physical Processes and Computational Methods)
- Information Notice 1992-09, Overloading and Subsequent Lock Out of Electrical Buses During Accident Conditions + (Overloading and Subsequent Lock Out of Electrical Buses During Accident Conditions)
- Information Notice 1979-28, Overloading of Structural Elements Due to Pipe Support Loads + (Overloading of Structural Elements Due to Pipe Support Loads)
- ML22145A284 + (Overlyj-th22-bio)
- 05000317/LER-2005-003, Overpower Condition Resulting from Non-Conservative Flow Correction Factors + (Overpower Condition Resulting from Non-Conservative Flow Correction Factors)
- 05000443/LER-2018-003, Overpower Delta T Setpoint Exceeded Allowable Value for Time Longer than Permitted by the Technical Specifications + (Overpower Delta T Setpoint Exceeded Allowable Value for Time Longer than Permitted by the Technical Specifications)
- ENS 41984 + (Overpower of Reactor Due to Calibration Error on Steam Dump Control System)
- ML080280341 + (Overpower?/Westinghouse Letter NSAL 03-6 from P. Snyder (NRR) to A. Stone (Riii), Et Al)
- ML20076J826 + (Overpressure Protection Rept)
- ML20010F607 + (Overpressure Protection Rept for Bryon/Braidwood Nuclear Power Plant Units 1 & 2 as Required by ASME Boiler & Pressure Vessel Code,Section Iii,Article NB-7300)
- ML20071N723 + (Overpressure Protection Rept for Catawba Nuclear Power Plant,Units 1 & 2 as Required by ASME Boiler & Pressure Vessel Code,Section Iii,Article NB-7300)
- ML19337A425 + (Overpressure Protection for B&W Pwr. Related Correspondence)
- Information Notice 1979-24, Overpressurization of Containment of a PWR Plant After a Main Steam Line Break + (Overpressurization of Containment of a PWR Plant After a Main Steam Line Break)
- ML20135F752 + (Overpressurization of ECCS in Bwrs, Case Study Rept)
- ML20027A775 + (Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys, Technical Evaluation Rept)
- ML112231554 + (Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other Engineered Safety Feature Sys,Duane Arnold Energy Center, Technical Evaluation Rept)
- ML20023A476 + (Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys (B-24), Technical Evaluation Rept)
- ML20079F292 + (Override & Reset of Control Ciruitry in Ventilation/Purge Isolation & Other ESF Sys,Hb Robinson Unit 2, Technical Evaluation Rept)
- ML090510184 + (Oversight Observation Checklist - Observations and Reviews Relating to the IE Bulletin 80-10 and Tritium Discovery in a Unit 2 Monitor Well)
- ML13017A346 + (Oversight Panel Charter)
- ML13099A358 + (Oversight Panel Charter (Revision 1))
- ML042100422 + (Oversight Panel Final Process Plan Public Release)
- ML041130199 + (Oversight Panel Final Restart Checklist Public Release Memo)
- ML041450338 + (Oversight Panel Open Action Item List)
- ML041100423 + (Oversight Panel Open Action Item List)
- ML041100403 + (Oversight Panel Open Action Item List)
- ML040830395 + (Oversight Panel Restart Action Matrix Closures - Supplemental Inspection Program Items)
- ML040830373 + (Oversight Panel Restart Action Matrix Closures - Non-Cited Violation Items)
- ML040830319 + (Oversight Panel Restart Action Matrix Closures - Licensee Event Report Items)
- ML040830417 + (Oversight Panel Restart Action Matrix Closures - Unresolved Inspection Items)
- ML040820947 + (Oversight Panel Restart Action Matrix Closures - Confirmatory Action Letter Items)
- ML040820928 + (Oversight Panel Restart Action Matrix Closures - Concerns)
- ML040820968 + (Oversight Panel Restart Action Matrix Closures - Emails)
- ML040820992 + (Oversight Panel Restart Action Matrix Closures - Letters)
- ML040820877 + (Oversight Panel Restart Action Matrix Index)
- ML040840254 + (Oversight Panel Restart Action Matrix Public Release Memorandum)
- ML20196G067 + (Oversight Plan for NNECO-Millstone Site Independent Third Party Oversight Team (Itpop))
- ML13112A812 + (Oversight Presentation, Reactor Decommissioning Inspection Program)
- ML19255F625 + (Oversight Program Biographies)
- IR 05000440/1986027 + (Oversight Team Insp Rept 50-440/86-27 on 861105-07.No Violation or Deviation Noted.Major Areas Inspected:Ler Analyzing & Reporting Program.Observations Made to Improve LER Program Identified)
- IR 05000461/1987019 + (Oversight Team Insp Rept 50-461/87-19 on 870615.No Violations or Deviations Noted.Major Areas Inspected:Ler Analyzing & Reporting Program,Including Review of Licensee/Industry Feedback Program & Specific LERs)
- ML25329A275 + (Oversight and Inspection Strategies for Microreactors During Operational Phase)
- RIS 2015-08, Oversight of Counterfeit, Fraudulent, and Suspect Items in the Nuclear Industry + (Oversight of Counterfeit, Fraudulent, and Suspect Items in the Nuclear Industry)
- Information Notice 1995-29, Oversight of Design and Fabrication Activities for Metal Components Used in Spent Fuel Dry Storage Systems + (Oversight of Design and Fabrication Activities for Metal Components Used in Spent Fuel Dry Storage Systems)
- ML19290C425 + (Oversize Diagram, Task A-17,Completion of Phase I During 1980)
- 05000368/LER-1979-026, Oversize Updated LER 79-026/03X-1:on 790323,fire Dampers Not Installed Per Design Specs.Caused by Installation Qa.Fire Dampers Cited Installed as Required.Aperture Card Available in PDR + (Oversize Updated LER 79-026/03X-1:on 790323,fire Dampers Not Installed Per Design Specs.Caused by Installation Qa.Fire Dampers Cited Installed as Required.Aperture Card Available in PDR)