MONTHYEARML22041B1072022-02-10010 February 2022 LTR-22-0033-1 Oedo Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML12167A0622012-07-16016 July 2012 Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables ML12170B1042012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #4 Scenario ML12170B1052012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #5 Scenario ML12200A1832012-06-12012 June 2012 Unit Licensing Basis Seismic Ground Motion Concern ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11348A0432011-12-12012 December 2011 Email -- Davis-Besse SB Crack Rc Investigation RFI ML12213A3532011-11-15015 November 2011 Shield Building Laminar Cracking ML12213A3512011-11-10010 November 2011 Containment Shield Building Issue ML12200A1952011-11-0707 November 2011 Shield Building Issue NRC Technical Reviewer Focus Questions ML11301A2392011-10-31031 October 2011 Reference: Wind Resource Estimates Developed by Aws Truepower LLC for Windnavigator ML11301A2352011-10-31031 October 2011 References: Concentrating Solar Resources of the United States ML1126601882011-09-23023 September 2011 NRC 2011 Davis-Besse L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30)2011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) ML11193A1332011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 1 Through Tab H 16) ML11193A1042011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 17 to Tab C 2) ML11227A1962011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab Am 1 Through a 7) ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML1016006942010-06-10010 June 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse - T. Gurdziel Questions ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0904800182009-02-17017 February 2009 Public Comments Regarding the Safety Culture Policy Statement ML0906404392009-01-28028 January 2009 Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs ML0803600792008-02-0101 February 2008 Attachment 1- DBNPS Steam Generator Inspections Data ML0802800442008-01-25025 January 2008 Special Inspection Evaluation, Basis for Investigatory Response Decision for a Significant Operational Power Reactor Event ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0733801902007-06-27027 June 2007 Meeting Attendees, 6/27/07, Meeting with Firstenergy Nuclear Operating Company Regarding May 14, 2007, Demand for Information ML0634705992006-12-14014 December 2006 Plant Service List ML0535402852005-12-16016 December 2005 Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment 7 to Indemnity Agreement B-79 ML0530704422005-11-0808 November 2005 Proposal to Clean Incore Tunnel and Below Vessel - a Locked High Radiation Area ML0531302012005-04-21021 April 2005 Timeline for Enforcement Actions ML0423002112004-08-0505 August 2004 Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 2 2022-02-10
[Table view] |
Text
February 20, 2004 DAVIS-BESSE OVERSIGHT PANEL "OPEN" ACTION ITEM LIST Rem Action Item Assigned to Comments Due Number (Date generated) _ __ _ Date 208 Evaluate the need to call D. Passehl 10/14-Investigation is still ongoing; TBD back Cl regarding Allegation 12/23-Discussed, awaiting DOJ RilI-2002-A-01 77 (D-B) after Investigation.
the 01 Investigation Is complete (08/21) 224 Rewrite the proposed IN on D. Hills 12/15-Discussed, D. Hills Is working; 02/15/04 TSP to be generic and 12/23-Discussed, this Issue will be reflect attainable plant discussed Internally In Rill and brought conditions and what to Panel on 1/06/03 for a final decision Information should be on how to proceed; 1/20-Discussed, disseminated to the Industry revised IN Is with Panel Chairman for concerning Boric Acid review; 1/30-Discussed, Chairman's Corrosion Control comments were sent to J. Lara.
Programs. (12109) 228 Place all Email requests R. Baker 1/06-Discussed, will verify ADAMS 02/13/04 sent throughout Agency, package Is In place to support responses received, and collection of emails and responses-issue resolutions In ADAMS email requests will be resent due to package for documentation. small response to date; 1/30-(12/16) Discussed, will verify and update Panel on 215104; 2/3-Discussed, Lead changed, verified ADAMS package In place, coordinate with J. Shea and A.
Mendiola that all emalls Included In ADAMS package. 2/18-Discussed, contents verified and need to add In additional email.
& -I 234 N .Develop protocol paper f Ruland T5/04-Discussed, protocol paper NRC representative on 0 \reguarding decision making being committee Interface with Aaf ted as a letter from Sam Collins to 0350 Panel for updates. Bpruce Boger and includes criteria for (01/06) Immediate Action; 1/20-Discussed, the "drahas been sent to B. Boger for DOJ comments; 1/26-Discussed, B.
BS~r is reviewing with senior management; 2/3-Discussed, protocol paper Inreview by OGC; 2 Discussed,J.Grobe working with Craig 242 Review MC 0350 and D. Passehl 213-Discussed, will update Panel on philosophy on which review at meeting 2/5104; 2/5-documentation is required Discussed, will provide specific on for public dissemination and retention of document to Panel on which should be retained 2/10/04.
following plant restart. (1/26) 1 V
V February 20, 2004 DAVIS-BESSE OVERSIGHT PANEL "OPEN" ACTION ITEM UST Item Action Item Assigned to Comments Due Number (Date generated) Date 244 Security (J. Creed) contact D. Passehl 19-Spoke with 1.Creed on 2/18, and 2125/04 NSIR to determine If DHS " e will update Panel.
)needs notification at restart as an applicable Federal Agency. (211 0)\
245 NRR contact FEMA to verify W. Ruland 2/19-Additional correspondence 2125/04 there are still no objections. FEMA Is necessary to verify no to restart (2/10) objections to restart..
246 Verify which remaining C. Upa 2/1 9-Verifying schedule for any 2/27/04 meetings of all special remaining Interviews.
inspection team leads with the RA exist. (2/1 0) 247 Ol/NRR contact discuss W. Ruland 2/20/04 restart update with DOJ.
-42/17) 249 Ehsure Enhanced G. Wright 2/19-Determined not necessary prior to TBD Inspection Plan Includes restart decision.
followup M&HP review of licensee monthly Pis and 2nd quarter corrective action effectiveness for Nov '03 ECP survey results. (2/18) 250 Ensure Enhanced C. Upa 2/19-Determined not necessary prior to TBD Inspection Plan includes restart decision.
commitments listed In RAM Item C-41. (2/18) 251 Ensure Enhanced C. Upa 2/19-Determined not necessary priorto TBD Inspection Plan Includes a restart decision.
followup on the UHS SW CR resolution 2