February 20, 2004 DAVIS-BESSE OVERSIGHT PANEL "OPEN" ACTION ITEM LIST Rem Action Item Assigned to Comments Due Number (Date generated)
Date 208 Evaluate the need to call D. Passehl 10/14-Investigation is still ongoing; TBD back Cl regarding Allegation 12/23-Discussed, awaiting DOJ RilI-2002-A-01 77 (D-B) after Investigation.
the 01 Investigation Is complete (08/21) 224 Rewrite the proposed IN on D. Hills 12/15-Discussed, D. Hills Is working; 02/15/04 TSP to be generic and 12/23-Discussed, this Issue will be reflect attainable plant discussed Internally In Rill and brought conditions and what to Panel on 1/06/03 for a final decision Information should be on how to proceed; 1/20-Discussed, disseminated to the Industry revised IN Is with Panel Chairman for concerning Boric Acid review; 1/30-Discussed, Chairman's Corrosion Control comments were sent to J. Lara.
Programs. (12109) 228 Place all Email requests sent throughout Agency, responses received, and issue resolutions In ADAMS package for documentation.
(12/16)
R. Baker 1/06-Discussed, will verify ADAMS package Is In place to support collection of emails and responses-email requests will be resent due to small response to date; 1/30-Discussed, will verify and update Panel on 215104; 2/3-Discussed, Lead changed, verified ADAMS package In place, coordinate with J. Shea and A.
Mendiola that all emalls Included In ADAMS package. 2/18-Discussed, contents verified and need to add In additional email.
02/13/04
-I 234 N.Develop protocol paper f NRC representative on 0 committee Interface with 0350 Panel for updates.
(01/06)
Ruland T5/04-Discussed, protocol paper
\\reguarding decision making being Aaf ted as a letter from Sam Collins to Bpruce Boger and includes criteria for Immediate Action; 1/20-Discussed, the "drahas been sent to B. Boger for DOJ comments; 1/26-Discussed, B.
BS~r is reviewing with senior management; 2/3-Discussed, protocol paper In review by OGC; 2 Discussed,J.Grobe working with Craig 242 Review MC 0350 and D. Passehl 213-Discussed, will update Panel on philosophy on which review at meeting 2/5104; 2/5-documentation is required Discussed, will provide specific on for public dissemination and retention of document to Panel on which should be retained 2/10/04.
following plant restart. (1/26) 1 V
V February 20, 2004 DAVIS-BESSE OVERSIGHT PANEL "OPEN" ACTION ITEM UST Item Action Item Assigned to Comments Due Number (Date generated)
Date 244 Security (J. Creed) contact D. Passehl 19-Spoke with 1. Creed on 2/18, and 2125/04 NSIR to determine If DHS "
e will update Panel.
)needs notification at restart as an applicable Federal Agency. (211 0)\\
245 NRR contact FEMA to verify W. Ruland 2/19-Additional correspondence 2125/04 there are still no objections.
FEMA Is necessary to verify no to restart (2/10) objections to restart..
246 Verify which remaining C. Upa 2/1 9-Verifying schedule for any 2/27/04 meetings of all special remaining Interviews.
inspection team leads with the RA exist. (2/1 0) 247 Ol/NRR contact discuss W. Ruland 2/20/04 restart update with DOJ.
-42/17) 249 Ehsure Enhanced G. Wright 2/19-Determined not necessary prior to TBD Inspection Plan Includes restart decision.
followup M&HP review of licensee monthly Pis and 2nd quarter corrective action effectiveness for Nov '03 ECP survey results. (2/18) 250 Ensure Enhanced C. Upa 2/19-Determined not necessary prior to TBD Inspection Plan includes restart decision.
commitments listed In RAM Item C-41. (2/18) 251 Ensure Enhanced C. Upa 2/19-Determined not necessary priorto TBD Inspection Plan Includes a restart decision.