Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Operator Training Program, Revision 4". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19344E075  + (Operator Requalification Program)
  • ML20128D213  + (Operator Requalification Program Prairie Island & Monticello Nuclear Generating Plants)
  • ML20042D827  + (Operator Requalification Program Univ of Illinois Triga/ Lopra)
  • ML18276A283  + (Operator Requalification Program for Missouri University of Science and Technology Reactor, Revision 4)
  • ML042820139  + (Operator Requalification Program for the University of Missouri-Rolla Reactor. Revision 3)
  • ML16076A407  + (Operator Requalification Program for the University of Massachusetts Lowell Research Reactor)
  • ML18214A202  + (Operator Requalification Program for the Missouri University of Science and Technology Reactor, Revision 4)
  • ML17250A533  + (Operator Requalification Program, Procedure A-102.14, Revision 3)
  • ML20215A728  + (Operator Response to Incidents,Probabilistic Risk Perspective)
  • Information Notice 1989-41, Operator Response to Pressurization of Low-Pressure Interfacing Systems  + (Operator Response to Pressurization of Low-Pressure Interfacing Systems)
  • ML070170259  + (Operator Retake Initial Examinations - Catawba - 05000413/2007301 and 05000414/2007301)
  • IR 05000369/2009302  + (Operator Retake License Examination Report 05000369/09-302 and 05000370/09-302)
  • ML19224B654  + (Operator Special Summaries A-C for 790328 & Sequence of Events Review (Computer Printout of Instrument Readings During Accident))
  • ML19224B683  + (Operator Special Summaries A-C for 790328 & Sequence of Events Review (Computer Printout of Instrument Readings During Accident))
  • ML19224B656  + (Operator Special Summaries B & C for 790329 (Computer Printout of Instrument Readings During Accident))
  • ML19224B668  + (Operator Special Summaries B & C for 790331 (Computer Printout of Instrument Readings During Accident))
  • ML19224B657  + (Operator Special Summaries B & C for 790330 (Computer Printout of Instrument Readings During Accident))
  • ML19224B670  + (Operator Special Summaries a & C for 10:49 PM to 10:57 PM 790331 (Computer Printout of Instrument Readings During Accident))
  • ML19224B666  + (Operator Special Summary A-C for 790329 (Computer Printout of Instrument Readings During Accident))
  • ML19224B319  + (Operator Special Summary B (Group 12))
  • ML19224B658  + (Operator Special Summary C (Computer Printout of Instrument Readings During Accident))
  • ML20003E293  + (Operator Training & Certification Program,Morris Operation)
  • ML20051M340  + (Operator Training - Degraded Core Recognition & Mitigation, Study Guide Phase 1,Vol 1)
  • ML20028E969  + (Operator Training Instructor Indoctrination/Qualification Training Program, Rev 0)
  • ML19345A696  + (Operator Training Program, Procedure AP-0500,Revision 3)
  • ML19338C848  + (Operator Training Svcs Instructor Requalification Program)
  • ML25192A233  + (Operator Training and Testing Program for the Non-Power Kairos Power Fluoride Salt-Cooled High-Temperature Reactors - Topical Report)
  • 05000261/FIN-2010012-03  + (Operator Transient Response Adversely Affected by Uncorrected, Known Plant Deficiency)
  • IR 05000348/2017301  + (Operator Written Examination Approval 05000348/2017301 and 05000364/2017301)
  • IR 05000353/2006301  + (Operator and Senior Reactor Operator Initial Examination Report No. 05000352 and 05000353-06-301)
  • IR 05000247/2005301  + (Operator and Senior Reactor Operator Initial Examination Retake Report No. 050000247-05-301)
  • ML19327A497  + (Operator/Senior Operator Requalification Program)
  • ML20262A205  + (Operators Console Details)
  • ML20262A098  + (Operators Console Details. Rev Date Illegible)
  • ML20261B391  + (Operators Control Console IH13-P680 Center Section)
  • ML20261B386  + (Operators Control Console IH13-P680 Computer Interfaces)
  • ML20261B382  + (Operators Control Console IH13-P680 Left Hand Section)
  • ML20261B395  + (Operators Control Console IH13-P680 Right Hand Section)
  • ML20215A714  + (Operators Degrees - Operators Viewpoint)
  • 05000244/FIN-2009003-02  + (Operators Did Not Have Corrective Lens Kits Available to Implement Emergency Plan Requirements)
  • 05000397/FIN-2017008-02  + (Operators Fail To Follow Procedure Causes RCIC Overspeed Trip)
  • 05000397/FIN-2017008-01  + (Operators Fail To Follow Reactor Scram Procedure)
  • 05000259/FIN-2010002-03  + (Operators Failed to Correctly Monitor and Assess RPV Beltline Temperatures During RPV Hydrostatic/In-service Leak Test)
  • ML20207U017  + (Operators Licenses & Conforming Amends, 10CFR50 & 55 Final Rule.Regulations Amended Clarifying Requirements for Issuing Licenses to Operators & Senior Operators & Codifying Procedures for Administering Requalification Exams)
  • ML19308D033  + (Operators Licenses, 10CFR55.Establishes Procedures & Criteria for Issuance of Licenses to Operators,Including Senior Operators,Of Facilities Per Atomic Energy Act of 1954)
  • ML20005C104  + (Operators Manual for Cobalt Teletherapy Digital Treatment Timer,Model A102408-654, for Insertion in Digital Treatment Timer Operators Manual,Edition 2,Jan 1980)
  • ML20005C108  + (Operators Manual for the Eldorado 78 Co-60 Teletherapy Unit,Edition 10, for Insertion in Eldorado 78 Operators Manual Edition 9,June 1981)
  • 05000255/FIN-2011015-02  + (Operators did not inform management an at-the-controls reactor operator left the at-the-controls area of the Control Room without providing a turnover to a qualified individual or obtaining permission from the Control Room Supervisor.)
  • ML20054J034  + (Opines Re Calculations of site-specific Spectra & Seismic Risk for Seismic Category I Structures Outside Std Plant Portion of Facility.High Degree of Conservatism Built Into Assumed Seismic Risk Acceptable)
  • ML20054M315  + (Opines Re NRC Severe Fuel Damage Research Program.Phase I Pbf Tests Essential to Success of Program.Phase II Should Put Emphasis on Full Length Studies)