ML20028E969
| ML20028E969 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/01/1982 |
| From: | GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML20028E967 | List: |
| References | |
| 6210-ADM-1340.0, NUDOCS 8301280307 | |
| Download: ML20028E969 (12) | |
Text
CONTROLLED COPY p' amw 8
TMI TRAINING DEPARTMENT PROCEDURE NO.
,1 j r ), } gd p
da '
ADMINISTRATIVE MANUAL 6210-AD"-1340.C5 r.
RESPONSIBLE OFFICE fTITLE:
Operater Training Instructor Indoctrination / Qualification TMI TRAINING Training Program EFFECTIVE DATE:
APPLICABILITY:
TMI TRAINING DEPARTMENT-Operator Training Section 12/01/82 LIST OF EFFECTIVE PAGES PAGE REVISION PAGE REVISION PAGE REVISION PAGE REVISION PAGE REV.
1.0 0
2.0 0
3.0 0
h 4.0 0
["
5.0 0
M
.J # M 8.0 0
I 9.0 0
10.0 0
11.0 0
cmf r.Tuor (USEJ3 LACK INK )
TITLE / DIVISION / DEPARTMENT DATE l
no T C,1NaT0a
.M fxM Operator Training Manager 1,gf3,q j l
/
l l
I I
REVIEMED q
l l
l li 5'
l I
l I
I I
I l
l I
I L
I I
I I
I i
I APPROVED WMbM_
iMananer, cl ant Trainin.7 6"I l l? / r /67-l l
i Ev 8301280307 830125
=
Fc n ICCC-PCL-1215.1-1 (1/81)
PDR ADOCK 05000289 l
t
}ggy;379N O
f P
M n. r w m,,
e-.x v vi N t i Ivt W:sgf'
,. T TMI TRAININT2 DErnr 4 NT PROCEEURE NO.:
- ' ;m 6210- ADM-1340. 05 q rj,)
! A *T
- ' r:
F ACMINISTRATIVE MANL'AL A -
L Ms L TITLE: OPERATOR TRAINING INSTRUCTOR INDOCTRINATION / QUALIFICATION TRAINING PROGPJJi 1.0 PURPOSE The purpose of this procedure is to provide the requirements for indoctrination, training and certification of instructors involved in training licensed and non-licensed operators and Shift Technical Advisors.
2.0 SCOPE / APPLICABILITY This procedure applies to all Instructors and Supervisors pennanently assigned to the Operator Training Section of the Three Mile Islan Training Department.
for all or portions of this program based on length of assignment, as detemined by the Manager, Plant Training annotating Attachment I.
3.0 DEFINITIONS Qualification Card - Attachment 1 of this procedure.
Certifier - that individual assigned in sections of Attachment 1 to 3.1 3.2 provide certification that the instructor has demonstrated satisfactory knowledge in that particular section.
4.0 RESPONSIBILITIES The Manager, Plant Training, TMI is responsible for certification of instructors prior to teaching of their first class, and as such, is 4.1 responsible for ensuring adherence to the requirements established by As part of his certification process, he shall this procedure.
conduct an extensive interview with each instructor.
The Operator Training Manager is responsible for the implementation 4.2 Specific responsibilities inciude:
of this procedure.
Designation of appropriate reference documents for the 4.2.1 indoctrination section.
Acceptance of alternate qualification where applicable.
4.2.2 Designation of advanced instructor development modules as part 4.2.3 of continuing training.
Acting as a certifier for designated portions of the 4.2.4 qualification card.
The respective Supervisors of Operator Training are responsible for monitoring the progress of instructors assigned under them, for 4.3 acting as certifiers for designated portions of the qualification card, and for ensuring that all instructors are qualified in accordance with this procedure for areas they are assigned to i nstruct-The Operator Training Administrative Assistant is responsible for maintaining a training record on each instructor assigned to the 4.4 Operator Training Section.
mm s me2 REVISION Fo m IC00-POL-1218.1-2 (1/81)
N0. 0 1.0
n n,. ~,,..
_~
W I QMQlggdM77 PROCE7 GENO.:
U T7
- 0. 0.,
- A h4 u
m -[ A.dENL AD"INTSTRATTVE !'M UAL
5.0 REFERENCES
5.1 - 6210-ADM-1340.01 Training Department Indoctrination.
6.0 ATTACHMENTS 6.1 Operator Training Instructor Qualification Card (Att.1) l (6210-ADM-1340.05-1 )(12/82) i 6.2 System Categorization ( Att. 2) 7.0 PROCEDURE 7.1 Initial Indoctri. nation and Training 7.1.1 Prere Jisites - Prerequisites are detailed in the appropriate job description and position ::pecification, as listed in the Training Department Administrative Manual.
7.1.2 Assignment When a new instructor is assigned to the Operator Training Section, the Operator Training Manager shall explain this procedure, indicate the unit assigned, and provide a copy of Attachments (1) and (2). At the same time, he shall review the individual's record for prior education and experience in '
both instructional and technical areas in order to determine when qualifications already exist. Any areas where certification is made based on the individual record will be documented by the Operator Training lianager on Attachment (1) at this time.
7.1.3 Process - Prior to commencing instruction in any area, instructors shal1~ complete Sections I, II, III, IVa. or IVb.,
the applicable portion (s) of Section V, and Section VI of Attachment (1). These sections shall be completed within six months of empic ment or transfer to the Training Department.
The purpose of Section IVb is to provide the opportunity for individuals who have completed all other prerequisites to corxnence instruction, provided they demonstrate instructional l
competince, without wa. ting for the semi-annual Basic Instructor Development School. To achieve this interim certification, the new instructor shall present a practice I
I
~
lecture which is evaluated as satisfactory by the TMI Training l
Department Staff, including the !!anager, Plant Training, j
Operator Training Manager, and a representative from the Training and Educational Development Section.
The respective unit Training Coordinator shall also be notified and may attend as desired.
Interim certification is valid for a maximum of six' months.
Completion of additional portions of Sections VA.1.b. and VB.l.b. beyond those sections originally certified by the Operator Training Manager, shall be similarly documented by the Operator Training Manager including the method by which completion is achieved.
=2a m2 ISION Fo r, 1000-POL-1218.1-2 (1/81) 2.0 l
l-(
OIN I bQ4y is ~'.Tfg TY PROCEDURE NO.:
k^rI.U@,NI ADMINISTRATIVE y.ANUA!.
6210- ADM-1340. 05 Completion of portions of Section VA.2.b. shall be certified by an oral checkout by an SRO-licensed individual from the assigned unit.
This checkout shall be documented using the oral examination sumary sheet from the appropriate unit Auxiliary Operator Training Program Description.
Attachment (2) lists the systems as they are grouped for the checkouts. -
The Manager, Plant Training's certification per Section VI of Attachment (1) is necessary only prior to initial instruction and need not be completed with each succeeding qualification.
i The appropriate supervisor is responsible for ensuring that continuing progress towards qualification is made and that instructors are cualified via the procedure for those areas in j
which they are assigned to teach.
~
7.2 Continuing Training Following the completion of Section IV of Attachment (1), instructors shall complete Advanced Instructor Development Modules as assigned by the Operator Training Manager.
All instructors assigned to the Operator Training Section are expected to progress towards ultimate qualification as Senior Reactor Operators on schedules provided by their Supervisors.
This requirement may be excused by the Manager, Plant Training on a case-by-case basis.
I Failure to meet scheduled dates for completion of Advanced Instructor
~
Development Modules or to.obtain an RO or SRO license or certificate on schedule shall necessitate a review of the situation by the
{
cognizant supervisor, with a recommended plan of action forwarded to I
the Operator Training Manager.
The Operator Training Manager shall f
i detemine the corrective action to be taken up to and including suspension from instructional duties and shall so advise the Manager, Plant Training.
Any changes in the Reference Documentation Indoctrination shall be reflected by revisions to Attachment I for new hires and shall be ccmpleted for the present staff through the required reading process as described in Trair.ing Department Procedure 6210-ADM-1340.02.
7.3 Records The Operator Training Administrative Assistant shall maintain copies of Attachment (1) and supporting documentation for all instructors currently assigned to the Operator Training Section.
Upon transfer, their records shall be turned over to the Administrative Section of the Training Department for retention in accordance with Department procedures for quality assurance records.
l:
1-Fem 1000-POL-1218.1-2 (1/81) 3.0
7 (dM I'$h/ENf5dNlT.
PROCgyg,ghli340~0~:
E fl h 1
_NdNp ~dI~
AD".INISTRATIVE !'ANUAL d
- m. =. ~
~
ATTACHMENT 1 OPERATOR TRAINING INSTRUCTOR QUALIFICATION CARD Name DATE STARTED I.
Briefing
, Initial briefing on qualification procedure completed.
Unit Assigned Operator Training Manager Date II.
GET/RWP Training Completed Operator Training Manager Date III. Reference Documer,tation Indoctrination Read and discuss the fol' lowing reference material with your Supervisor:
A.
Training Department Administrative Manual !
1.
Vol. I - 6210-ADM-1010.01 Organization 2.
Vol. II - Operator Training Program Descriptions for Unit Assigned.
(STA Training Program Description for STA instructors.)
3.
Vol. III - Training Department Administrative Procedures Supervisor Date i
S.
External References i
1.
10 CFR 55 2.
ANSI 3.1 1978 Unit I Only 3.
ANSI 3.1 1981 Unit I Only I
4.
ANSI 18.1 1971 Unit II Only 5.
Reg. Guide 1.8 Effective Revisions 6.
Nuclear Energy Technology, Chapter 18 and 19 7.
ASLB PID on fianagement - Initial - Operator (STA) Training Section Only 8.
ASLB PID on Management - Reopened Hearing 9.
Additional Material j
Supervisor Date Form 6210-AD!1-1340.05-1 (12/82)
== a me2 REVISION 1
Fe m 1000 PCi_-1218.1-2 (1/81s>
- ggo, 4.0
Om nTcor i Ch vm +
"~
m =xx-
.ROCEDURE NO.:
f iMI TRAINING DEPART!'ENT bh_J ~iNhLNb r
U ADMINISTRATIVE MANUAL 6210-ADM-1340. 05 l
Page 2 of 6 C.
Nuclear Ar;urance/ Corporate Procedures 1.
6200-ADM 2600.1 - Administration of Examinations 2.
AP 1058 - Unit I only 3.
AP 1066 - Unit II only 4.
Operational Quality Assurance Plan Supervisor Date IV.
Instructional Knowledge Requirements A.
Complete Basic Instructor Development Program Supervisor, TE&D Date B.
Interim Certification Manager, Plant Training Date V.
Technical. Qualifications A.
Non-Licensed Operator Training 1.
Power Plant Fundamentals & Theory Subjects a.
SRO Licensed or Certified Operator Training Manager Date OR b.
Satisfactory completion of training or education in subjects taught at or above level of Auxiliary Operator C.
How Satisfied 0p Trng Mgr Date
- 1) Reactor Theory &
I l
l l
Principles l
l l
l
- 2) Heat Transfer, Fluid l
I I
I Flow & Themodynamics l
l l
1
- 3) Chemistry & Water I
i i
I Waste Treatment I
l I
l
- 4) Mathematics i
I I
I I
I I
I
- 5) Radiological l
I I
I Fundamental s l
l l
l
- 6) Basic Electrical i
l i
l l
I I
l
- 7) Basic Mechanical l
l l
l l
1 I
I
- 8) Materials I
i l
i l
l I
I Fem 6210-ADM-1340.05-1 (12/82)
' e2 s me2 REVISION ren 1cco 50 -1213.1-2 (1/81)
NO.0
- 5. 0
l rj [
' f f
ITk khfNek)$:dhkI4TI PROCEDURE NO.:
of.l-
.g ADMINISTRATIVE KANUAL 62l0- ADri-1340.05
~
Page 3 of 6
,2.
Systems and Components, Operating Procedures and Practices a.
A0"A", RO or SRO qualified Operator Training Manager Date or b.
Interim System certification SRO Licensed Ind.
Date 1)
Electrical Systems l
l l
l l
l 2)
Primary Systems l
l l
l l
l 3)
Primary Auxiliary Systems l
l l
l l
1 4)
River Water Systems l
I l
I l
l
- 5) Radwaste Systems l
l l
l l
I 6)
Primary Protection /
I I
l Instrumentation / Control l
I l
- 7) Secondary Systems i
I I
1 I
I
- 8) Turbine / Condenser Systems l
l I
l
- 9) Secondary Auxiliary Systems l
l l
l I
- 10) Chemistry Systems l
l l
I l
l
- 11) Plant Protection Systems l
I I
i i
I i
- 12) Heating & Ventilation l
l l
Systems l
I l
- 13) Miscellaneous Systems l
l 1
l l
l
- 14) Temporary Systems (Unit II l
l l
Only) l l
l B.
Licensed Operator (STA) Training 1.
Power Plant Fundamentals & Theory Subjects a.
SRO Licensed or Certified Operator Training Manager Date or Fom 6210-ADM-1340.05-1 (12/82)
'.s 2.s ms2 REVISION F:::m IC00-PCL-1218.1-2 (1/81)
NO.0 6.0
,^m Fr.Mi i Ch
^^&.
~
v....
.z-____-
J.
'r TMI TRAINING DEPART!1ENT PROCEft?JAS.1:340.05
[ I' k] J M d k N b ADMINISTRATIVE MANUAL
}
Page 4 of 6
.b.
Satisfactory completion of training or education in subjects taught at or above SRO (STA) level.
How Satisfied Op Trng Mgr Date
- 1) Reactor Theory &
l l
l l
Principles l
l l
l
- 2) Heat Transfer, Fluid l
l l
l Flow & Themodynamics l
l l
l
- 3) Chemistry & Water l
l l
l Waste Treatment l
I l
I
- 4) Mathematics I
i l
i t
I l
I l
I
- 5) Radiological i
1 i
i Fundamentals l
l l
l
- 6) Basic Electrical l
I l
l l
l l
1
- 7) Basic Mechanical l
i I
l l
I I
- 8) Materials l
1 i
I I
l l
2.
Systems and Components, Transient and Integrated Plant Response, l
Operating Procedures, Simulator Instructor.
SRO Licensed or Certified l
__ Operator Training lianager Date l
l VI. Manager, Plant Training Certification I have interviewed this instructor and hereby certify that the importance of the instructor's role in affecting students' attitudes and behavior towards rules, regulations, and regulatory bodies is understood and that this individual is ready in all respects to comence instruction.
tianager, Plant Training Date l
l Fom 6210-ADM-1340.05-1 (12/82) l o
ms 2 s mer REVgSION Fo:m ICCC-POL-1218.1-2 (1/81)
- 7. 0 NO.
Ans.
oriTry,. e &-
ev.
.... v. m- -
%,m
_1 ' T PROCED'RE NO.:
J TMI TP.AINING DEPARn:ENT f-Ir'i J
s.' f b A b
ADMINISTRATIVE MANUAL 6210-ADri-1340.05 g
VII. Cont [uingTraining A.
Instructional Knowledge Requirements - Complete Advanced Instructor Development Modules ar.ssigned by Operator Training Manager.
COMPLETION CERTIFICATION SCHEDULE ACTUAL (0p Trng Mgr)
MODULE COMPLETION DATE COMPLETION DATE (or Supv. T&ED) l I
i i
i l
i l
l I
I I
I I
I l
l l
l l
l l
l l
l l
l l
l l
1 I
I i
l i
i l
I I
I I
I I
I I
I I
I I
I I
I I
I l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
1 I
I I
I I
I I
I I
I l
l l
l l
l B.
Tecnnical Knowledge Requirements 1.
Non-Licensed Operator Training COMPLETION SCHEDULE ACTUAL CERTIFICATION COMPLETION DATE COMPLETION DATE (0p Trng Mgr)
- a. Obtain R0 l
l 1
l License (Note 1)l l
l l
- b. Obtain SR0 l
l l
l License or i
i l
l Certificate l
l l
l l
NOTE 1 - Not required for SRO Certificate.
Fom 6210-ADM-1340.05-1 (12/82) l m m2e me:
REVISION Fc m 1000-P0_-1218.1-2 (1/81)
NO. 0 8.0
.mma.-
ar
- m sm-4 w w/ t y a5 1 % #im:.sz w w v %,v 6 J.'r TMI TRAINING DEPART"ENT PROCEDURE NC.:
d Adkbb-ADMINISTRATIVE MANUAL 6210-ADM-1340.05 1
~
Page 6 of 6 COMPLETION CERTIFICATION YEAR (0p Trng Mgr)
DATE c.
Maintain license /
l l
l l
certificate annual l
I i
l basis in accordance i
i i
with Applicable l
l l
Requalification i
I l-l Program Requirements i l
l l
l l
l l
l l
I l
I I
2.
Licensed Operator Training COMPLETION SCHEDULE ACTUAL CERTIFICATION C0t1PLETION DATE COMPLETION DATE (00 Trng Mgr) a.
Obtain SRO License or Certificate l
l l'
l COMPLETION CERTIFICATION YEAR (0p Trng Mgr)
DATE c.
Maintain SRO license /l 1
1 certificate on annuall l
l basis in accordance l
l l
with Applicable l
l l
Requalification i
l l
1 Program Requirements 1.
l I
I I
I I
I l
i I
I I
I I
I I
I Fom 6210-ADM-1340.05-1 (12/82) t m m28 Se2 P
SION Form 10CO-PCL-1218.1-2 (1/81)
q )(Y i h b y pDEP
$T PROCE, CURE NO.:
[f h {Lt
'f7 7
7 f4E Ac :N1STRAT1vE rcNcAt c2 0mM-1340.05 System Categorization
- 1) ELECTRICAL SYSTEMS
- 5) RADWASTE SYSTEMS 1.
- 37. Rad Weste Evaporators 2.
Class IE-Inc. Diesel Gen.
- 38. Waste Disposal - Liquid (Elect)
- 39. Waste Disposal - Solid 3.
AC/DC Vital
- 40. Waste Disposal - Gas 4.
Emerg. Diesel Gen. (ftech.)
& Aux.
- 6) RX/ PRIMARY PROTECTION /
5.
Main Turbine - Generator INSTRUMENTATION / CONTROL 6.
Generator Gas & Vents
- 41. Control Rod Drive - Mechanical 7.
Generator Seal 011-
- 42. Control Rod Drive - Electrical 8.
Generator Stator Cooling (including control) 9.
Isolated Phase Bus Duct
- 43. Reactor Protection System Cooling
- 44. Integrated Control System (ICS)
- 10. Generator Core Monitor
- 45. Nuclear Instrumentation
- 11. Substation
- 46. Non-Nuclear Instrumentation
- 47. Engineered Safeguards
- 2) PRIMARY SYSTEMS Actuation System (ESAS)
- 48. Radiation Monitoring System
- 13. Reactor Coolant Pumps / Motors
- 14. Reactor. Vessel Construction
- 7) SECONDARY SYSTEMS
- 15. Makeup & Purification (HPI)
- 49. Condensate
- 16. Decay Heat Removal (LPI)
- 50. Feedwater
- 17. Decay Heat Closed Cooling
- 51. Main Steam
- 18. Cona Flood
- 52. Secondary Sryc.' Closed Cooling
- 19. Reactor Building Spray
- 53. Condenser Cire. Water
- 20. Intemediate Closed Cooling ~
- 21. Nuclear Srve. Closed Cooling
- 8) TURBINE / CONDENSER
- 54. Main Turbine-Turbine / Condenser
- 3) FRIMARY AUXILIARY SYSTEMS
- 55. Condenser Air Extraction
- 22. Spent Fuel Cooling
- 56. Electro Hydrolic Control (EHC) i
- 23. Chemical Addition - Nuclear
- 57. Gland Seal Steam l
- 24. Fluid Block (Environmental
- 58. Turbine tube Oil Barrier - U2) i
- 25. Penetration Pressurization
- 9) SECONDARY AUXILIARY SYSTEMS i
- 26. Reclained Chemical Water
- 59. Emergency Feedwater I
- 27. Primary Sampling (liq. & gas)
- 60. Auxiliary Boilers (U-l only)
{
- 28. Penetration Cooling
- 61. Auxiliary Steam 1
- 29. Hydrogen Purge & Recombiner
- 62. Extraction Steam
- 63. Stage Heater Vents & Drains
- 64. Amertap
- 4) RIVER WATER SYSTEMS
- 65. Secondary & Aux. Boiler Sampling
- 31. Decay Heat R.W. (U-l only)
- 32. Nuclear Service R.W.
- 33. Secondary Service R.W.
f
- 34. Rx Bldg. Emergency Cooling R.W.
- 35. Screen Wash & Sluice 1
i
- 36. Bars & Rakes mc2.s me2 REVISION Fc:m ICCO-POL-1218.1-2 (1/S1)
NO.0 z
10.0
NN i 'qhdpj h4Mg}.AiTpflT
PROCECURE C..
'j.lf {1 A N[N. ;
rr L'
L AC",INISTRATIVE MANUAL 62ic-C -1240.05
- 10) CHEMISTRY 66.
Cycle Makeup Pretreatment 67.
Cycle Makeup Domineralizers 68.
Condensate Chemical Feed 69.
Powdex Condensate Filters (Condensate Polishers U-2) 70.
River Water Chlorination 71.
Cire Water Chlorination and Chemical Feed 72.
Chem. Feed - Aux. Boilers (Unit 1 Only)
- 11) FIRE PROTECTION 73.
Fire Service 74.
Deluge 75.
CO2 1
76.
Halon
- 12) HEATING AND YENTILATION 77.
Rx Bldg. - Horcal cooling I
(incl. industrial coolers) 78.
Control Bldg. (H&Y & chill water) l
- 79. Aux. and F.H. Bldg.
- 80. Turbine Bldg.
81.
Service Bldg. (H&V & chill water)
- 82. Out Bldgs.
0
- 13) MISC. SYSTEMS
- 83. Fuel Handling i
84.
Instrument & Control Air A
85.
Station Service Air 86.
Industrial Waste Treatment
/
87.
Industrial Waste Filter 88.
Island Flood Control (dike, flood gates,'etc.)
{
89.
Domestic Water 90.
Sucps & Drains
- 14) TEMPORARY SYSTEMS (Unit II only) 91.
Submerged Demineralizer System 92.
Standby Pressure Control
- 93. Mini-Decay Heat Removal 94.
Long Tem "B" Cooling
- 95. Temporary Nuclear Sampling 96.
Epicore II
- 97. Recovery Instrumentation 98.
Other (to be specified by Supervisor Licensed Op. Training, TMI-2)
Fem 100C-POL-1215.1-2 (1/S1)
' m.a ms2 REVISION NO. 0 11.0
'