ML20028E969

From kanterella
Jump to navigation Jump to search
Operator Training Instructor Indoctrination/Qualification Training Program, Rev 0
ML20028E969
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/01/1982
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20028E967 List:
References
6210-ADM-1340.0, NUDOCS 8301280307
Download: ML20028E969 (12)


Text

CONTROLLED COPY p' amw

,1 j r ) , } gd 8

p TMI TRAINING DEPARTMENT PROCEDURE NO.

r.

da ' ADMINISTRATIVE MANUAL 6210-AD"-1340.C5 -

RESPONSIBLE OFFICE Operater Training Instructor Indoctrination / Qualification fTITLE: Training Program TMI TRAINING EFFECTIVE DATE:

APPLICABILITY:

TMI TRAINING DEPARTMENT- Operator Training Section 12/01/82 LIST OF EFFECTIVE PAGES PAGE REVISION PAGE REVISION PAGE REVISION PAGE REV.

PAGE REVISION 1.0 0 2.0 0 3.0 4.0 0

h

["

0

  • 5.0 0 M .J # M 8.0 0 I

9.0 0 10.0 0 11.0 0

! cmf r.Tuor (USEJ3 LACK INK ) TITLE / DIVISION / DEPARTMENT DATE l ,

no T C,1NaT0a .M fxM Operator Training Manager 1,gf3,q j l / l l I I

q REVIEMED

! l l l li

' 5' l I l I I I I l l I I L I I I

I I i I

APPROVED WMbM_ #

iMananer, cl ant Trainin.7 6"I l l? / r /67-l i

Ev l  !

8301280307 830125 l

=

t Fc n ICCC-PCL-1215.1-1 (1/81) PDR ADOCK 05000289 PDR P }ggy;379N O f

M n. r w m , , e-.x . . . . _

!* v vi N t i Ivt W:sgf'

- ' ;m ,.

  • PROCEEURE NO.:

,. T TMI TRAININT2 DErnr 4 NT q rj ,)  ! A *T F A -

  1. ' r: L ACMINISTRATIVE MANL'AL 6210- ADM-1340. 05 Ms L TITLE: OPERATOR TRAINING INSTRUCTOR INDOCTRINATION / QUALIFICATION TRAINING PROGPJJi 1.0 PURPOSE The purpose of this procedure is to provide the requirements for indoctrination, training and certification of instructors involved in training licensed and non-licensed operators and Shift Technical Advisors.

2.0 SCOPE / APPLICABILITY This procedure applies to all Instructors and Supervisors pennanently assigned to the Operator Training Section of the Three Mile Islan Training Department.

for all or portions of this program based on length of assignment, as detemined by the Manager, Plant Training annotating Attachment I.

3.0 DEFINITIONS 3.1 Qualification Card - Attachment 1 of this procedure.

3.2 Certifier - that individual assigned in sections of Attachment 1 to provide certification that the instructor has demonstrated satisfactory knowledge in that particular section.

4.0 RESPONSIBILITIES 4.1 The Manager, Plant Training, TMI is responsible for certification of instructors prior to teaching of their first class, and as such, is responsible for ensuring adherence to the requirements established by this procedure. As part of his certification process, he shall conduct an extensive interview with each instructor.

4.2 The Operator Training Manager is responsible for the implementation of this procedure. Specific responsibilities inciude:

4.2.1 Designation of appropriate reference documents for the indoctrination section.

4.2.2 Acceptance of alternate qualification where applicable.

4.2.3 Designation of advanced instructor development modules as part of continuing training.

4.2.4 Acting as a certifier for designated portions of the qualification card.

4.3 The respective Supervisors of Operator Training are responsible for monitoring the progress of instructors assigned under them, for acting as certifiers for designated portions of the qualification card, and for ensuring that all instructors are qualified in accordance with this procedure for areas they are assigned to i nstruct-4.4 The Operator Training Administrative Assistant is responsible for maintaining a training record on each instructor assigned to the Operator Training Section.

mm s me2 REVISION Fo m IC00-POL-1218.1-2 (1/81) N0. 0 ,

1.0

, n n ,. ~ ,, . . . _~

T7 - U W I QMQlggdM77 PROCE7 u GENO.:

- 0. 0.,

m#A-[ h4 A.dENL AD"INTSTRATTVE !'M UAL

5.0 REFERENCES

5.1 - 6210-ADM-1340.01 Training Department Indoctrination.

6.0 ATTACHMENTS l

6.1 Operator Training Instructor Qualification Card (Att.1) i (6210-ADM-1340.05-1 )(12/82)

! 6.2 System Categorization ( Att. 2) 7.0 PROCEDURE 7.1 Initial Indoctri. nation and Training ,

7.1.1 Prere Jisites - Prerequisites are detailed in the appropriate job description and position ::pecification, as listed in the Training Department Administrative Manual.

7.1.2 Assignment When a new instructor is assigned to the Operator Training Section, the Operator Training Manager shall explain this procedure, indicate the unit assigned, and provide a copy of Attachments (1) and (2). At the same time, he shall review the individual's record for prior education and experience in '

both instructional and technical areas in order to determine when qualifications already exist. Any areas where certification is made based on the individual record will be

-- documented by the Operator Training lianager on Attachment (1) at this time.

7.1.3 Process - Prior to commencing instruction in any area, instructors shal1~ complete Sections I, II, III, IVa. or IVb.,

the applicable portion (s) of Section V, and Section VI of Attachment (1). These sections shall be completed within six months of empic ment or transfer to the Training Department.

The purpose of Section IVb is to provide the opportunity for individuals who have completed all other prerequisites to corxnence instruction, provided they demonstrate instructional l competince, without wa. ting for the semi-annual Basic Instructor Development School. To achieve this interim I certification, the new instructor shall present a practice I

~

lecture which is evaluated as satisfactory by the TMI Training l

Department Staff, including the !!anager, Plant Training, j Operator Training Manager, and a representative from the Training and Educational Development Section. The respective unit Training Coordinator shall also be notified and may attend as desired. Interim certification is valid for a maximum of six' months.

Completion of additional portions of Sections VA.1.b. and VB.l.b. beyond those sections originally certified by the Operator Training Manager, shall be similarly documented by

! the Operator Training Manager including the method by which completion is achieved.

=2a m2 ISION Fo r, 1000-POL-1218.1-2 (1/81) '

l 2.0 l- __

(

k^rI.U@,NIOIN I bQ4y

" ' is ~'.Tfg TY PROCEDURE NO.:

ADMINISTRATIVE y.ANUA!. 6210- ADM-1340. 05 Completion of portions of Section VA.2.b. shall be certified

' by an oral checkout by an SRO-licensed individual from the assigned unit. This checkout shall be documented using the oral examination sumary sheet from the appropriate unit Auxiliary Operator Training Program Description. Attachment (2) lists the systems as they are grouped for the checkouts. -

The Manager, Plant Training's certification per Section VI of Attachment (1) is necessary only prior to initial instruction and need not be completed with each succeeding qualification. i The appropriate supervisor is responsible for ensuring that  !

continuing progress towards qualification is made and that  !

instructors are cualified via the procedure for those areas in j which they are assigned to teach. ~

7.2 Continuing Training Following the completion of Section IV of Attachment (1), instructors shall complete Advanced Instructor Development Modules as assigned by the Operator Training Manager.

All instructors assigned to the Operator Training Section are expected to progress towards ultimate qualification as Senior Reactor ,

Operators on schedules provided by their Supervisors. This requirement may be excused by the Manager, Plant Training on a case-by-case basis.

I

~

Failure to meet scheduled dates for completion of Advanced Instructor Development Modules or to.obtain an RO or SRO license or certificate on schedule shall necessitate a review of the situation by the {

cognizant supervisor, with a recommended plan of action forwarded to I the Operator Training Manager. The Operator Training Manager shall i

detemine the corrective action to be taken up to and including f suspension from instructional duties and shall so advise the Manager, Plant Training.

, Any changes in the Reference Documentation Indoctrination shall be reflected by revisions to Attachment I for new hires and shall be ccmpleted for the present staff through the required reading process as described in Trair.ing Department Procedure 6210-ADM-1340.02.

7.3 Records The Operator Training Administrative Assistant shall maintain copies of Attachment (1) and supporting documentation for all instructors currently assigned to the Operator Training Section. Upon transfer, their records shall be turned over to the Administrative Section of the Training Department for retention in accordance with Department procedures for quality assurance records.

l:

1-Fem 1000-POL-1218.1-2 (1/81) 3.0

- " (dM I'$h/ENf5dNlT. E PROCgyg,ghli340~0~

fl h 1

m. = . ~

_NdNp 7

d~dI~ AD".INISTRATIVE !'ANUAL

~

ATTACHMENT 1 OPERATOR TRAINING INSTRUCTOR QUALIFICATION CARD Name DATE STARTED I. Briefing

, Initial briefing on qualification procedure completed.

Unit Assigned Operator Training Manager Date

, II. GET/RWP Training Completed Operator Training Manager Date III. Reference Documer,tation Indoctrination Read and discuss the fol' lowing reference material with your Supervisor:

A. Training Department Administrative Manual !

1. Vol. I - 6210-ADM-1010.01 Organization
2. Vol. II - Operator Training Program Descriptions for Unit Assigned. (STA Training Program Description for STA instructors.)
3. Vol. III - Training Department Administrative Procedures Supervisor Date i S. External References i
1. 10 CFR 55
2. ANSI 3.1 1978 Unit I Only
3. ANSI 3.1 1981 Unit I Only I
4. ANSI 18.1 1971 Unit II Only
5. Reg. Guide 1.8 Effective Revisions
6. Nuclear Energy Technology, Chapter 18 and 19
7. ASLB PID on fianagement - Initial - Operator (STA) Training Section Only
8. ASLB PID on Management - Reopened Hearing
9. Additional Material j

Supervisor Date '

Form 6210-AD!1-1340.05-1 (12/82)

== a me2 REVISION 1 Fe m 1000 PCi_-1218.1-2 (1/81s> ggo, 4.0 ' '

. Om nTcor i Ch vm +

m =xx- "~

" r

.ROCEDURE NO.:

bh_JU ~iNhLNb f iMI TRAINING DEPART!'ENT ADMINISTRATIVE MANUAL 6210-ADM-1340. 05 l Page 2 of 6 C. Nuclear Ar;urance/ Corporate Procedures

1. 6200-ADM 2600.1 - Administration of Examinations
2. AP 1058 - Unit I only
3. AP 1066 - Unit II only
4. Operational Quality Assurance Plan Supervisor Date IV. Instructional Knowledge Requirements A. Complete Basic Instructor Development Program Supervisor, TE&D Date B. Interim Certification Manager, Plant Training Date V. Technical. Qualifications A. Non-Licensed Operator Training
1. Power Plant Fundamentals & Theory Subjects
a. SRO Licensed or Certified Operator Training Manager Date OR
b. Satisfactory completion of training or education in subjects taught at or above level of Auxiliary Operator C.

How Satisfied 0p Trng Mgr Date

1) Reactor Theory & I l l l Principles l l l l
2) Heat Transfer, Fluid l I I I Flow & Themodynamics l l l 1
3) Chemistry & Water I i i I Waste Treatment I l I l
4) Mathematics i I I I I I I I
5) Radiological l I I I Fundamental s l l l l
6) Basic Electrical i l i l l I I l
7) Basic Mechanical l l l l l 1 I I
8) Materials I i l i l l I I Fem 6210-ADM-1340.05-1 (12/82)

' e2 s me2 REVISION ren 1cco 50 -1213.1-2 (1/81) NO.0

5. 0

l rj [

of.l- .g

' f f

~

ITk khfNek)$:dhkI4TI ADMINISTRATIVE KANUAL PROCEDURE NO.:

62l0- ADri-1340.05 Page 3 of 6

,2. Systems and Components, Operating Procedures and Practices

a. A0"A", RO or SRO qualified Operator Training Manager Date or
b. Interim System certification SRO Licensed Ind. Date
1) Electrical Systems l l l l l l
2) Primary Systems l l l l l l
3) Primary Auxiliary Systems l l l l l 1
4) River Water Systems l I l ,

I l l

5) Radwaste Systems l l l l l I
6) Primary Protection / I I l Instrumentation / Control l I l
7) Secondary Systems i I I 1 I I
8) Turbine / Condenser Systems l l I l
9) Secondary Auxiliary Systems l l l l I
10) Chemistry Systems l l l  :

I l l

11) Plant Protection Systems l I I , i i I i
12) Heating & Ventilation l l l Systems l I l
13) Miscellaneous Systems l l 1 l l l
14) Temporary Systems (Unit II l l l Only) l l l B. Licensed Operator (STA) Training
1. Power Plant Fundamentals & Theory Subjects
a. SRO Licensed or Certified Operator Training Manager Date or Fom 6210-ADM-1340.05-1 (12/82)

F:::m IC00-PCL-1218.1-2 (1/81) '.s 2.s ms2 REVISION NO.0 '

6.0

,^m Fr.Mi i Ch

^^& .

, _ _ ~ v.... .z-____- - - . .

J. 'r TMI TRAINING DEPART!1ENT PROCEft?JAS.1:340.05

[ I' k] J M d k N b ADMINISTRATIVE MANUAL }

Page 4 of 6

.b. Satisfactory completion of training or education in subjects taught at or above SRO (STA) level.

How Satisfied Op Trng Mgr Date

1) Reactor Theory & l l l l Principles l l l l
2) Heat Transfer, Fluid l l l l Flow & Themodynamics l l l l
3) Chemistry & Water l l l l Waste Treatment l I l I t
4) Mathematics I i l i I l I l I

! 5) Radiological i 1 i i

! Fundamentals l l l l

6) Basic Electrical l I l l l l l 1
7) Basic Mechanical l i  ! I l l I I
8) Materials l 1 i I I l l
2. Systems and Components, Transient and Integrated Plant Response, l Operating Procedures, Simulator Instructor.

_ SRO Licensed or Certified l

l __ Operator Training lianager Date l

VI. Manager, Plant Training Certification I have interviewed this instructor and hereby certify that the importance of the instructor's role in affecting students' attitudes and behavior towards rules, regulations, and regulatory bodies is understood and that this individual is ready in all respects to comence instruction.

tianager, Plant Training Date l

l Fom 6210-ADM-1340.05-1 (12/82) l o

ms 2 s mer REVgSION Fo:m ICCC-POL-1218.1-2 (1/81) 7. 0 NO.

Ans. oriTry,. e &- l

% ,m ev. . . . . v . m- - ,. .

l J J PROCED'RE NO.:

f-Ir'i _1 ' T g TMI TP.AINING DEPARn:ENT s.' f b A b ADMINISTRATIVE MANUAL 6210-ADri-1340.05 l VII. Cont [uingTraining A. Instructional Knowledge Requirements - Complete Advanced Instructor Development Modules ar .ssigned by Operator Training Manager.

COMPLETION CERTIFICATION SCHEDULE ACTUAL (0p Trng Mgr)

MODULE COMPLETION DATE COMPLETION DATE (or Supv. T&ED) l I i i i l i l l I I I I I I l l l l l l l l l l l l l l l 1 I I i l i i l I I I I I I I I I I I , I I I I I I l l l l l l l l l l l l l l l l l l l l l l l l l l l 1 I I I I I I I I I I l l l l l l B. Tecnnical Knowledge Requirements

1. Non-Licensed Operator Training COMPLETION SCHEDULE ACTUAL CERTIFICATION COMPLETION DATE COMPLETION DATE (0p Trng Mgr)
a. Obtain R0 l l 1 l License (Note 1)l l l l
b. Obtain SR0 l l l l License or i i l l

, Certificate l l l l NOTE 1 - Not required for SRO Certificate.

Fom 6210-ADM-1340.05-1 (12/82) l m m2e me: REVISION Fc m 1000-P0_-1218.1-2 (1/81)

NO. 0 8.0

.mma.- ar  : m sm-4

- _ w w/ t y a5 1 % #im:.sz w w v %,v 6 .

TMI TRAINING DEPART"ENT PROCEDURE NC.:

J.'rAdkbb- 6210-ADM-1340.05 d ADMINISTRATIVE MANUAL 1 Page 6 of 6

~

COMPLETION CERTIFICATION YEAR (0p Trng Mgr) DATE

c. Maintain license / l l l l certificate annual l I i l basis in accordance i i i with Applicable '

l l l Requalification i I l- l Program Requirements i l l l l l l l l l I l

. I I

2. Licensed Operator Training COMPLETION SCHEDULE ACTUAL CERTIFICATION C0t1PLETION DATE COMPLETION DATE (00 Trng Mgr)
a. Obtain SRO License or Certificate l l l' l COMPLETION CERTIFICATION YEAR (0p Trng Mgr) DATE
c. Maintain SRO license /l 1 1 certificate on annuall -

l l basis in accordance  ! l l l with Applicable '

l l l Requalification i l l 1 Program Requirements 1. l I I I I I I l i I I I I I I I I Fom 6210-ADM-1340.05-1 (12/82) t m m28 Se2 P SION Form 10CO-PCL-1218.1-2 (1/81)

'f7 q )(Y i7 h b y pDEP $T PROCE, CURE NO.:

[f h

, {Lt 7 f4E Ac :N1STRAT1vE rcNcAt c2 0mM-1340.05 Attachment 2

, System Categorization

1) ELECTRICAL SYSTEMS 5) RADWASTE SYSTEMS
1. BOP 37. Rad Weste Evaporators
2. Class IE-Inc. Diesel Gen. 38. Waste Disposal - Liquid (Elect) 39. Waste Disposal - Solid
3. AC/DC Vital 40. Waste Disposal - Gas
4. Emerg. Diesel Gen. (ftech.)

& Aux. 6) RX/ PRIMARY PROTECTION /

5. Main Turbine - Generator INSTRUMENTATION / CONTROL
6. Generator Gas & Vents 41. Control Rod Drive - Mechanical
7. Generator Seal 011- 42. Control Rod Drive - Electrical
8. Generator Stator Cooling (including control)
9. Isolated Phase Bus Duct 43. Reactor Protection System Cooling 44. Integrated Control System (ICS)
10. Generator Core Monitor 45. Nuclear Instrumentation
11. Substation 46. Non-Nuclear Instrumentation
47. Engineered Safeguards
2) PRIMARY SYSTEMS Actuation System (ESAS)
12. Reactor Coolant System 48. Radiation Monitoring System
13. Reactor Coolant Pumps / Motors
14. Reactor. Vessel Construction 7) SECONDARY SYSTEMS
15. Makeup & Purification (HPI) 49. Condensate
16. Decay Heat Removal (LPI) 50. Feedwater

__ 17. Decay Heat Closed Cooling 51. Main Steam

18. Cona Flood 52. Secondary Sryc.' Closed Cooling
19. Reactor Building Spray 53. Condenser Cire. Water
20. Intemediate Closed Cooling ~
21. Nuclear Srve. Closed Cooling 8) TURBINE / CONDENSER
54. Main Turbine-Turbine / Condenser
3) FRIMARY AUXILIARY SYSTEMS 55. Condenser Air Extraction .
22. Spent Fuel Cooling 56. Electro Hydrolic Control (EHC) i
23. Chemical Addition - Nuclear 57. Gland Seal Steam l
24. Fluid Block (Environmental 58. Turbine tube Oil Barrier - U2) i
25. Penetration Pressurization 9) SECONDARY AUXILIARY SYSTEMS i
26. Reclained Chemical Water 59. Emergency Feedwater I
27. Primary Sampling (liq. & gas) 60. Auxiliary Boilers (U-l only)
28. Penetration Cooling 61. Auxiliary Steam {

1

29. Hydrogen Purge & Recombiner 62. Extraction Steam
30. Nitrogen & Hydrogen Supply 63. Stage Heater Vents & Drains .
64. Amertap
4) RIVER WATER SYSTEMS 65. Secondary & Aux. Boiler Sampling
31. Decay Heat R.W. (U-l only) ,
32. Nuclear Service R.W.
33. Secondary Service R.W.
34. Rx Bldg. Emergency Cooling R.W. f
35. Screen Wash & Sluice 1 i
36. Bars & Rakes mc2.s me2 REVISION Fc:m ICCO-POL-1218.1-2 (1/S1)

NO .0 ' z 10.0

N[N. ;NN i 'qhdpj h4Mg}.AiTpflT

rr L' j.lf {1 A L AC",INISTRATIVE MANUAL PROCECURE C..

62ic- C -1240.05

10) CHEMISTRY
66. Cycle Makeup Pretreatment
67. Cycle Makeup Domineralizers
68. Condensate Chemical Feed
69. Powdex Condensate Filters (Condensate Polishers U-2)
70. River Water Chlorination
71. Cire Water Chlorination and '

Chemical Feed

72. Chem. Feed - Aux. Boilers (Unit 1 Only)
11) FIRE PROTECTION
73. Fire Service -
74. Deluge
75. CO2 1
76. Halon ,
12) HEATING AND YENTILATION  ;
77. Rx Bldg. - Horcal cooling I (incl. industrial coolers)  !
78. Control Bldg. (H&Y & chill water) l
79. Aux. and F.H. Bldg.
80. Turbine Bldg.

81 . Service Bldg. (H&V & chill water) .

82. Out Bldgs.  :

0

13) MISC. SYSTEMS  :
83. Fuel Handling i
84. Instrument & Control Air A
85. Station Service Air
86. Industrial Waste Treatment /
87. Industrial Waste Filter
88. Island Flood Control (dike, flood gates,'etc.) {
89. Domestic Water
90. Sucps & Drains
14) TEMPORARY SYSTEMS (Unit II only)
91. Submerged Demineralizer System
92. Standby Pressure Control
93. Mini-Decay Heat Removal
94. Long Tem "B" Cooling
95. Temporary Nuclear Sampling
96. Epicore II
97. Recovery Instrumentation
98. Other (to be specified by Supervisor Licensed Op. Training, TMI-2)

' m.a ms2 REVISION Fem 100C-POL-1215.1-2 (1/S1)

NO. 0 11.0 '