Category:Letter
MONTHYEARML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09
[Table view] Category:License-Operator
MONTHYEARML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C7742019-07-30030 July 2019 Requalification Program Inspection ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19044A6012019-02-0404 February 2019 Operator Licensing Written Exam Approval ML19029B3192019-01-28028 January 2019 Operator Licensing Operating Test Approval ML18159A3512018-06-0505 June 2018 Final Operating Test (Sections a, B, and C) - JPM C, D, K Corrected (Folder 3) ML18047A1692018-01-0303 January 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18047A1702017-11-0707 November 2017 Handouts to Applicants (Folder 3) ML17297A6432017-10-24024 October 2017 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 3 ML17297A0132017-10-23023 October 2017 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 3 ML17234A5902017-08-22022 August 2017 Requalification Program Inspection - Indian Point Nuclear Generating, Unit 3 NL-17-080, Operator Licensing Examination Data2017-06-28028 June 2017 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17206A4422016-10-31031 October 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML16365A0432016-10-31031 October 2016 Handouts to Applicants (Folder 3) ML17069A2842016-10-31031 October 2016 Final Outlines Update ES-401-2, ES-401-3 ML16365A0412016-10-31031 October 2016 Final Outlines (Folder 3) ML17206A4452016-10-31031 October 2016 Final Qa/Related Forms (Folder 1) ML16365A0442016-10-31031 October 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML16365A0422016-10-31031 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16301A2882016-10-27027 October 2016 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 2 ML16298A0162016-10-20020 October 2016 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 2 ML17047A5982016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Operating Test (Folder 2) ML17047A5972016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Written Exam (Folder 2) ML17047A6012016-09-0101 September 2016 Draft Operating Exam (Section a, B, and C) (Folder 2) ML17047A6002016-09-0101 September 2016 Draft Written Exam (Folder 2) ML17047A5992016-07-18018 July 2016 Draft - Outlines (Folder 2) (Facility Letter Dtd - 07/18/2016) NL-16-073, Operator Licensing Examination Data2016-07-0707 July 2016 Operator Licensing Examination Data ML16189A0832016-07-0606 July 2016 Requalification Program Inspection - Indian Point Energy Center, Unit 2 ML16119A0012016-04-27027 April 2016 Senior Reactor and Reactor Operator Initial License Examinations-Indian Point Energy Center, Unit 2 ML15223A0162015-08-10010 August 2015 Requalification Program Inspection-Indian Point Energy Ctr, Unit 3 IR 05000286/20153012015-06-24024 June 2015 Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report ML15163A2302015-06-0404 June 2015 Draft - Outlines (Folder 2) ML15163A2322015-06-0404 June 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15163A2312015-06-0404 June 2015 Draft Written Exam (Folder 2) ML15163A2292015-06-0404 June 2015 All Comments on Draft NRC-Developed Exam (Operating) (Folder 2) ML15160A4702015-06-0404 June 2015 Final Outlines (Folder 3) ML15160A4642015-06-0404 June 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15160A4562015-06-0404 June 2015 Handouts to Applicants (Folder 3) ML15160A4092015-06-0404 June 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15282A3072015-06-0101 June 2015 Final Qa/Related Forms (Folder 1) ML14308A0522014-10-29029 October 2014 Final Outlines (Folder 3) ML14307B5652014-10-29029 October 2014 Draft Operating Exam (Section a) (Folder 2) ML14307B5212014-10-29029 October 2014 Draft-Outlines (Folder 2) ML14307B3852014-10-29029 October 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14308A2512014-10-29029 October 2014 Final Operating Exam (Section a) (Folder 3) ML14251A2402014-09-0808 September 2014 Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2 2021-01-12
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C7742019-07-30030 July 2019 Requalification Program Inspection ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19029B3192019-01-28028 January 2019 Operator Licensing Operating Test Approval ML18159A3512018-06-0505 June 2018 Final Operating Test (Sections a, B, and C) - JPM C, D, K Corrected (Folder 3) ML18047A1692018-01-0303 January 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18047A1702017-11-0707 November 2017 Handouts to Applicants (Folder 3) ML17297A6432017-10-24024 October 2017 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 3 ML17297A0132017-10-23023 October 2017 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 3 NL-17-080, Operator Licensing Examination Data2017-06-28028 June 2017 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16365A0442016-10-31031 October 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML17206A4422016-10-31031 October 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17206A4452016-10-31031 October 2016 Final Qa/Related Forms (Folder 1) ML17069A2842016-10-31031 October 2016 Final Outlines Update ES-401-2, ES-401-3 ML16365A0422016-10-31031 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16365A0412016-10-31031 October 2016 Final Outlines (Folder 3) ML16365A0432016-10-31031 October 2016 Handouts to Applicants (Folder 3) ML16301A2882016-10-27027 October 2016 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 2 ML16298A0162016-10-20020 October 2016 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 2 ML17047A5972016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Written Exam (Folder 2) ML17047A5982016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Operating Test (Folder 2) ML17047A6002016-09-0101 September 2016 Draft Written Exam (Folder 2) ML17047A6012016-09-0101 September 2016 Draft Operating Exam (Section a, B, and C) (Folder 2) ML17047A5992016-07-18018 July 2016 Draft - Outlines (Folder 2) (Facility Letter Dtd - 07/18/2016) NL-16-073, Operator Licensing Examination Data2016-07-0707 July 2016 Operator Licensing Examination Data ML16119A0012016-04-27027 April 2016 Senior Reactor and Reactor Operator Initial License Examinations-Indian Point Energy Center, Unit 2 ML15223A0162015-08-10010 August 2015 Requalification Program Inspection-Indian Point Energy Ctr, Unit 3 IR 05000286/20153012015-06-24024 June 2015 Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report ML15163A2312015-06-0404 June 2015 Draft Written Exam (Folder 2) ML15163A2322015-06-0404 June 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15160A4562015-06-0404 June 2015 Handouts to Applicants (Folder 3) ML15163A2302015-06-0404 June 2015 Draft - Outlines (Folder 2) ML15163A2292015-06-0404 June 2015 All Comments on Draft NRC-Developed Exam (Operating) (Folder 2) ML15160A4092015-06-0404 June 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15160A4702015-06-0404 June 2015 Final Outlines (Folder 3) ML15160A4642015-06-0404 June 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15282A3072015-06-0101 June 2015 Final Qa/Related Forms (Folder 1) ML14308A0522014-10-29029 October 2014 Final Outlines (Folder 3) ML14307B5652014-10-29029 October 2014 Draft Operating Exam (Section a) (Folder 2) ML14307B5212014-10-29029 October 2014 Draft-Outlines (Folder 2) ML14307B3852014-10-29029 October 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14308A2512014-10-29029 October 2014 Final Operating Exam (Section a) (Folder 3) ML14251A2402014-09-0808 September 2014 Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2 ML14195A0902014-07-14014 July 2014 Requalification Program Inspection-Indian Point Station, Unit 2 IR 05000247/20143012014-03-31031 March 2014 Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report ML14091A6922014-03-31031 March 2014 Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report 2021-01-12
[Table view] |
Text
une 16, 2005
SUBJECT:
INDIAN POINT 2 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION RETAKE REPORT NO.
05000247/2005301
Dear Mr. Dacimo:
This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator (SRO) licensing retake written examination conducted by the NRC on April 29, 2005. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
Based on the results of the examination, one Reactor Operator applicant passed the examination. One Senior Reactor Operator applicant failed the examination. On June 7, 2005, final examination results, including individual license numbers, were given during a telephone call between Mr. Stephen Joubert and Mr. Joseph DAntonio.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (Master File - Accession Number ML050700339; RO and SRO Written - Accession Number ML051640286. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. Fred Dacimo 2 Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 50-247 License No. DPR-26
Enclosure:
Initial Examination Report No. 05000247/2005301
REGION I==
Docket No. 50-247 License No. DPR-26 Report No. 05000247/2005301 Licensee: Entergy Nuclear Operations, Inc.
Facility: Indian Point 2 Dates: April 29, 2005 (Written Examination Administration)
May 23, 2005 (Examination Grading)
May 6, 2005 (End of Examination Period)
Examiners: Joseph M. DAntonio, Operations Engineer (Chief Examiner)
Approved by: Richard J. Conte, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
IR 05000247/20005301; April 29, 2005; Indian Point 2; Initial Operator Licensing Examination.
One Reactor Operator out of two applicants passed the examination (one reactor operator and one SRO instant).
The written examinations were administered by the facility. The operating tests were waived by Region 1 since the applicants had passed that portion of their original examinations. There were no inspection findings of significance associated with the examinations.
ii
REPORT DETAILS
REACTOR SAFETY
Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examination
a. Scope
of Review The NRC examination team developed the written and operating initial examination and together with Indian Point 2 training and operations personnel verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. Final resolution of comments and incorporation of test revisions were conducted prior to the administration of the examination.
- A test item analysis was completed on the written examination for feedback into the systems approach to training program.
- Examination security requirements were met.
The written examination was administered by the Indian Point 2 training staff on April 29, 2005.
b. Findings
Grading and Results One of two applicants (one SRO and one RO) passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Examination Administration and Performance No findings of significance were identified.
4OA5 Other (Inadvertent Potential Initial License Exam Security Compromise)
The facility had assigned the examination author to develop three periodic quizzes for the initial license class in addition to the comprehensive audit and actual NRC written examinations. During the development of the written examination, the facility determined by review of industry operating experience that their use of the NRC examination author for exam development other than the NRC and audit examinations was not in compliance with the requirements of NUREG-1021 Operator Licensing Examiner Standards. A review was performed of these examinations by the facility and the NRC and the proposed written examination to determine if a potential exam compromise existed. This review found two duplicate and four similar questions on the proposed written examination vs. the quizzes. These questions were replaced.
The use of the NRC exam developer to develop license class examination materials is a violation of 10 CFR 55.49 because, but if for detection, it would have affected the equitable and consistent administration of the examination. This finding was considered minor in that it did not have any actual safety consequences, the issue was not a precursor to a significant event, if left uncorrected it was not likely to become a more significant event, the issue did not relate to a performance indicator, and the issue was not directly associated with one of the cornerstones objectives. Although this issue constitutes a violation of minor significance that is not subject to enforcement action in accordance with Section IV of the Enforcement Policy, it is being documented because it is associated with an issue of agency wide concern (i.e., NRC exam security, NUREG-1021, Draft Revision 9, ES-501, E.3). The facility placed this issue in its corrective action program (condition report number IP2-2005-1385).
4OA6 Exit Meeting Summary
On June 7, 2005, the NRC provided conclusions and examination results to Indian Point 2 management representatives via telephone. A license number for the one applicant who passed the examination was also provided during this time.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
Robert Heidecker, Senior Instructor, Operator Training
Robert Christman, Supervisor, Operator Training
NRC
Joseph DAntonio, Operations Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
ITEM NUMBER TYPE DESCRIPTION
NONE