Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19341A547 + (Joint Response of Intervenors Dellums,Burton & Burton, Friends of the Earth & B Shockley,Proposing Scheduling of Prehearing Conference & Deadlines for Discovery & Testimony. Certificate of Svc Encl.Related Correspondence)
- ML20065P093 + (Joint Response of Intervenors to ASLB 821001 Order.Meaning of Discussion of Probability Should Be Clarified & ASLB Should Immediately Reformulate Contentions on Questions 3 & 4.Certificate of Svc Encl)
- ML19351F150 + (Joint Response of NRC & Applicant to ASLB 801202 Order to Submit Proposed Schedule for Commencement of Hearings on Health & Safety Issues.Lists 30 Issues & Requests 810501 Hearing on 16 Issues.Certificate of Svc Encl)
- ML19263D245 + (Joint Response of NRC & DOJ to ASLB 790209 Order.Urges ASLB to Overrule Objections to Joint Requests 56 & 76.Certificate of Svc Encl)
- ML20052H229 + (Joint Response of Northern CA Power Agency & Cities of Anaheim & Riverside,Ca to Util 820503 Motion for Withdrawal. Cities Will Support Reasonably Conditioned Dismissal If Util Abandons All Const Plans.W/Certificate of Svc)
- ML20323A111 + (Joint Response of the Parties to the Boards Order)
- ML101520226 + (Joint Response of the State of New York, the State of Connecticut, Riverkeeper, and Hudson River Sloop Clearwater to NRC Staffs Motion for Leave to Propose Transcript Corrections and for the Scheduling of a Prehearing Telephone Conference)
- ML19340D203 + (Joint Response to ASLB 801121 Order Requiring Submittal of Environ Contentions & ASLB Questions & Sequence in Which Issues Will Be Heard.Proposed Schedule Is Tentative. Certificate of Svc Encl)
- ML12362A316 + (Joint Response to Board Order Notifying Parties of Amendments to Rules of Practice)
- ML25105A087 + (Joint Response to Board Order Requesting Availability for Prehearing Conference)
- ML20084G110 + (Joint Response to Commission 840430 Order to Vacate Schedule Adopted by 840406 Order & Call for Arguments on 840507 Re Applicability of GDC to Util Proposal for Low Power Operation.Certificate of Svc Encl)
- ML19345G925 + (Joint Response to Licensee 810316 Request for Admissions.All Contentions Admitted Except 1-30,34-45,47 & 51-72. Certificate of Svc Encl)
- ML19345G923 + (Joint Response to Licensee 810316 Second Request for Admissions.All Contentions Admitted Except 2-8,10-13,15-19 & 21-32)
- ML20108B098 + (Joint Response to Lilco Motion to Suppl & Reopen Record on Diesel Generator Engine Block & Crankshaft Contentions.Motion Seeks to Relitigate Issues Under Lower Performance Std.Certificate of Svc Encl)
- ML19345G919 + (Joint Response to NRC 810316 Request for Admissions.All Contentions Admitted Except Listed Matl)
- ML20093L033 + (Joint Rev to Contention 8 & Amend to Basis for Contention 8 Re QA Program.Certificate of Svc Encl)
- ML100261432 + (Joint Scheduling Report)
- ML20128K386 + (Joint Settlement Agreement.* Listed Terms of Agreement Shall Become Effective Upon Approval of Naslp.W/Certificate of Svc)
- ML25188A179 + (Joint Statement from the Commissioners)
- ML19329C849 + (Joint Statement of Aec,Doj & Intervenors Re Contentions & Matters in Controversy.Certificate of Svc Encl)
- ML20098G891 + (Joint Statement of CW Dick & EM Hughes Re Independent Design Insp)
- ML20098G890 + (Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp)
- ML20098G884 + (Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl)
- ML20003D224 + (Joint Statement on Emergency Planning Contentions.Before Restart,Reasonable Progress Towards Emergency & Response Plan Compliance Must Be Shown.W/Certificate of Svc)
- ML20080J773 + (Joint Statement on Suffolk County Contention 11 Re Passive Mechanical Valve Failure.Certificate of Svc Encl)
- ML19261D787 + (Joint Statement to ASLB by Petitioners Oyster Shell Alliance,Save Our Wetlands & NRC Indicating Agreement on Contentions in Proceeding.Parties Unable to Reach Agreement on Contentions 8-14 & 22)
- ML18225A260 + (Joint Status Report)
- ML18225A259 + (Joint Status Report)
- ML20167A335 + (Joint Status Report)
- ML17024A272 + (Joint Status Report (DC Cir. Case No. 16-1004) 01/23/2017)
- ML16127A386 + (Joint Status Report Regarding Track 2 Schedule Deferral)
- ML25281A308 + (Joint Status Report and Applicants Motion to Dismiss)
- ML25190A645 + (Joint Status Report in Response to Boards Direction During July 2, 2025 Telephonic Conference)
- ML101090515 + (Joint Status Report on Settlement Discussions)
- ML100780305 + (Joint Status Report on Settlement Discussions)
- ML20077S764 + (Joint Status Rept & Motion for Clarification Re Limerick Ecology Action Right to Reply in Writing to Answers of Applicant & NRC Concerning Admissibility of Severe Accident Risk Assessment Contentions.Certificate of Svc Encl)
- ML20246J788 + (Joint Status Rept & Stipulation.* Advises That NRC Depositions of Witnesses Other than Staff Consultant Scheduled for 890906-08 & Licensee Depositions Scheduled for Middle of Oct.W/Certificate of Svc)
- ML20081D949 + (Joint Status Rept Re Matters in ASLB 831013 Scheduling Order.Repts Scheduled for Filing on 831102 Should Be Deferred Until 831122.Contingent Date of 831201 for Conference of Counsel Suggested.Certificate of Svc Encl)
- ML081980525 + (Joint Stipulation)
- ML20247D720 + (Joint Stipulation Calling for Alabama Power Co to Offer to Sell Portion of Units to Alabama Electric Cooperative,Inc)
- ML18046B404 + (Joint Stipulation Giving Consent to Open 620710 Public Hearing Record to Include Stipulation Into Record.Discusses Vallecitos BWR Fuel Irradiation Developments Since 620710. Certificate of Svc Encl)
- ML20126K965 + (Joint Stipulation Re Agreement to Admit QC Inspector Harassment Contention for Litigation.Parties Unable to Agree to Adoption of Protective Order as Sought by Intervenors. Certificate of Svc Encl)
- ML20205N424 + (Joint Stipulation Re Applicant Motion to Strike Basis A.3.* Applicant Withdraws Motion Based on Commonwealth of Ma Atty General Withdrawal of Allegation.Certificate of Svc Encl)
- ML20248F728 + (Joint Stipulation Re Certain Acoustic Locations.* Lists Facts That Applicant & Commonwealth of Ma Atty General Agree On,Per Four Visits to Acoustic Locations That Vehicle & Alert & Notification Sys Vehicle Driven & Level Questioned)
- ML20245E640 + (Joint Stipulation Re City of Newburyport Emergency Planning.* No Record of City Ever Accepting City Emergency Planning Manual Admitted as Applicant Exhibit 48 Exists.W/ Certificate of Svc)
- ML20029A034 + (Joint Stipulation Re Contentions Remanded in ALAB-937 & ALAB-942.* Issues Raised in Contention 47 Basis R Remanded in ALAB-937 & Contention 56 Basis a Remanded in ALAB-942 Resolved.W/Certificate of Svc)
- ML20235N326 + (Joint Stipulation Re Evacuation Time Estimate Issues.* Commonwealth of Ma Atty General Agrees That Intervenors Will Not Appeal Portions of Board Partial Initial Decision.W/ Certificate of Svc)
- ML20236A372 + (Joint Stipulation Re Joint Intervenor (Ji) Contention 60.* Withdraws Ji Contention 60,per Applicant Agreement to Add More Traffic Cones as Required & to Reflectorize All Cones for Night Visibility.W/Certificate of Svc)
- ML20236A363 + (Joint Stipulation Re Joint Intervenor (Ji) Contention 8.* Withdraws Ji Contention 8,per Applicant Agreement to Include Listed Addl Info in Emergency Broadcast Sys Messages to Be Broadcast During Evacuation.W/Certificate of Svc)
- ML20133L821 + (Joint Stipulation Re Settlement of Environ Coalition on Nuclear Power Proposed Contentions)
- ML20235V680 + (Joint Stipulation Re Status of Certain Salisbury Contentions.* Certificate of Svc Encl)
- ML20032D111 + (Joint Stipulation Withdrawing Contentions 7 & 8 in Entirety, Deleting First Two Sentences of Contention 5 & Paragraph (a) of Contention 11.Certificate of Svc Encl)
- ML063260461 + (Joint Stipulation and Motion on Disclosure)