Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000445/FIN-2011002-02 + (Inadequate Fire Drill Evaluation)
- 05000275/FIN-2011003-01 + (Inadequate Fire Hazard Evaluations)
- 05000445/FIN-2008003-01 + (Inadequate Fire Protection Compensatory Actions During Refueling Outage)
- 05000498/FIN-2011003-01 + (Inadequate Fire Protection System Functionality Procedure Results in Failure to Establish Fire Watches)
- ENS 43562 + (Inadequate Fire Protection on Safety Chilled Water System Electrical Cables)
- 05000272/FIN-2017001-02 + (Inadequate Fire Risk Assessment and Management)
- 05000259/FIN-2017002-01 + (Inadequate Fire Risk Evaluation for Postulated Fires Affecting EECW Strainers)
- Information Notice 1992-28, Inadequate Fire Suppression System Testing + (Inadequate Fire Suppression System Testing)
- 05000445/FIN-2008006-03 + (Inadequate Fire Suppression Systems)
- 05000482/FIN-2011003-09 + (Inadequate Fire Watch Defeats Halon Fire Suppression in Vital Switchgear Rooms During Fire)
- 05000416/FIN-2008003-01 + (Inadequate Fireproofing on Fire Barrier Protecting the Safeguards Switchgear Room)
- 05000313/FIN-2014009-01 + (Inadequate Flood Protection for Auxiliary and Emergency Diesel Fuel Storage Buildings)
- 05000285/FIN-2009006-02 + (Inadequate Flood Protection for the Intake Structure)
- 05000368/FIN-2016007-08 + (Inadequate Flow Monitoring of Unit 2 Service Water to Emergency Feedwater Pump Suction Supply)
- 05000528/FIN-2015008-01 + (Inadequate Flow Test Procedure)
- Information Notice 1990-26, Inadequate Flow of Essential Service Water to Room Coolers and Heat Exchangers for Engineered Safety-Feature Systems + (Inadequate Flow of Essential Service Water to Room Coolers and Heat Exchangers for Engineered Safety-Feature Systems)
- 05000282/FIN-2010003-04 + (Inadequate Foreign Material Exclusion Controls Associated with Work on Emergency Diesel Generators)
- 05000250/FIN-2017002-02 + (Inadequate Foreign Materials Exclusion Controls for Thermo-Lag Activities Renders Electrical Equipment Inoperable and Results in a High Energy Arc Flash)
- 05000298/FIN-2009003-02 + (Inadequate Freeze Protection Procedure Results in Loss of Condensate Storage Tank Vent Path)
- 05000440/FIN-2012005-05 + (Inadequate Fuel Handling Building Crane Maintenance Challenges Single-Failure-Proof Compliance)
- 05000259/FIN-2011011-03 + (Inadequate Functional Evaluations Performed to Support Operability of Overthrust Motor Operated Valves)
- 05000482/FIN-2018001-01 + (Inadequate Functionality Assessment Associated with the Emergency Excess Letdown Flowpath)
- 05000443/FIN-2011004-01 + (Inadequate Functionality Assessment for Fire Protection System)
- 05000456/FIN-2013003-05 + (Inadequate Functionality Evaluations for a Degraded Unit 1 BAST Bladder)
- 05000317/FIN-2010005-03 + (Inadequate Functionality Review of 0C Diesel Degraded Condition)
- Information Notice 1991-51, Inadequate Fuse Control Programs + (Inadequate Fuse Control Programs)
- 05000482/FIN-2009003-02 + (Inadequate Fuse Thermography Procedure Resulted in Blown Fuses and Unplanned Reactor Trip)
- 05000387/FIN-2012008-01 + (Inadequate Gain Settings Result in Reactor Scram)
- 05000445/FIN-2012004-02 + (Inadequate Gasket Installation Causes Diesel Jacket Water Leak)
- 05000255/FIN-2008002-03 + (Inadequate General Operating Procedure for Mode Transition (Section 1R20))
- 05000251/FIN-2015002-01 + (Inadequate General Operating Procedure to Prevent Inadvertent AFAS While Performing a Reactor Plant Planned Shutdown)
- 05000293/FIN-2015010-03 + (Inadequate Guidance and Invalid Compensatory Measures for Out-of-Service EAL Instrumentation)
- 05000244/FIN-2013004-03 + (Inadequate Guidance for Workers to Implement a Modification to the Main Generator Digital Protection Relays)
- 05000272/FIN-2013005-03 + (Inadequate HELB Barrier Controls)
- 05000272/FIN-2015002-04 + (Inadequate HRA Controls)
- 05000315/FIN-2014007-03 + (Inadequate Heat Exchanger Inspection Procedure)
- 05000341/FIN-2008005-01 + (Inadequate Heat Exchanger inspection Frequency)
- 05000397/FIN-2017003-01 + (Inadequate High Pressure Core Spray Fill and Vent Procedure)
- 05000458/FIN-2010004-05 + (Inadequate High Pressure Core Spray Pump Room Cooler Bearing Maintenance)
- 05000220/FIN-2011002-01 + (Inadequate Identification And Corrective Actions For Emergency Diesel Generator Temperature Control Valve Degradation)
- 05000286/FIN-2010004-01 + (Inadequate Identification and Correction of a Condition Adverse to Quality to Ensure the Continued Availability of the Safety-Related No. 31 Static Inverter)
- 05000454/FIN-2013007-01 + (Inadequate Identification of Fire Curtain Sprinkler Degradation for an Auxiliary Building Stairwell)
- 05000272/FIN-2008005-04 + (Inadequate Identification of Midloop Level Calibration Error)
- 05000443/FIN-2015002-01 + (Inadequate Identification of Structural Deformation and Impacts on Associated Equipment)
- 05000390/FIN-2016001-02 + (Inadequate Immediate Determination of Operability for the Auxiliary Control Air System Train A)
- 05000390/FIN-2016004-01 + (Inadequate Immediate Determination of Operability for Essential Raw Cooling Water Pumps)
- 05000390/FIN-2016004-02 + (Inadequate Immediate Determination of Operability for Containment Penetration X-65)
- 05000391/FIN-2017001-02 + (Inadequate Immediate Determination of Operability for Essential Raw Cooling Water Flush Valve)
- Information Notice 2007-40, Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees + (Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees)
- 05000354/FIN-2016003-01 + (Inadequate Implementation of Adverse Condition Monitoring Actions for the High Pressure Coolant Injection System)
- Information Notice 2019-03, Inadequate Implementation of Clearance Processes Results in Configuration Control Issues + (Inadequate Implementation of Clearance Processes Results in Configuration Control Issues)