Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "In Draft Application Revision Notification". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19294A617  + (In Accordance W/Nrc Requests to Improve Valve Engineering, Energy Products Group Intends to Submit a Topical Rept Re Improved Valve Engineering & Based on Governing Criteria of Reg Guide 1.48 & Generic Issues of Reg Review Plan 3.9.3)
  • ML19269B983  + (In Accordance W/Provisions of Pollution Discharge Elimination Sys Permit,Results & Flow Measurements for 78111-781130 Are Enclosed.Also Revises Preprinted Monitoring Rept Form to Reflect Changes)
  • ML19263E120  + (In Accordance w/760421 Application,Matl/Byproduct License 44-14025-01 for VT Marble Co Is Amended in Its Entirety to Authorize Cs-137 in Sealed Source in Weigh Scale to Weigh Product Transported on Conveyor Belt)
  • ML051090201  + (In Accordance with 10 C.F.R. Section 50.71, Enclosed Is the 2004 Annual Report to Stockholders of Wisconsin Electric Power Company, Which Includes Certified Financial Statements)
  • ML19093B018  + (In Accordance with 10.CFR 50.71 (B) the Virginia Electric and Power Company Hereby Forwards Twelve(12) Copies of the 1977 Annual Report)
  • ML14216A462  + (In Accordance with Order 90-09, NPDES No. CA0003751, the Second Quarter 2014 Report on Discharge Monitoring at Diablo Canyon Power Plant Is Provided)
  • ML062060509  + (In Accordance with Order 90-09, NPDES No. CA0003751, Second Quarter 2006 Report on Discharge Monitoring at Diablo Canyon)
  • GO2-11-055, In Accordance with Requirements of 10 CFR 50.75, Reports Status of Decommissioning Funding  + (In Accordance with Requirements of 10 CFR 50.75, Reports Status of Decommissioning Funding)
  • ML19093A966  + (In Accordance with Technical Specifications for Surry Power Unit Nos. 1 & 2, VEPCO Hereby Submits the Annual Operating Report for 1977)
  • ML19093B351  + (In Accordance with Technical Specification 4.14.C.1 for Surry Power Station, Report Describes Occurrence During Difference Between River Water Ambient Temperature Measured at Station High Level Intake & Cooling Water)
  • ML19093B352  + (In Accordance with Technical Specification 4.14.C.1 for Surry Power Station, Report Describes Occurrence During Difference Between River Water Ambient Temperature Measured at Station High Level Intake & Cooling Water)
  • ML12107A304  + (In Accordance with the Board’S September 15, 2010, Memorandum, and Section 2.1203(a), the NRC Staff Is Providing Notice That It Has Updated the Hearing File in the Matter of Pacific Gas and Electric Company, Diablo Canyon Power Plants, Unit)
  • ML19220A748  + (In Addition to Close Monitoring of TMI-2,requests Careful Insp of TMI-1 & Peach Bottom)
  • ML20076A802  + (In Answer to IE Bulletin 79-01,environmentally Qualified stem-mounted Limit Switches W/Appropriate Documentation Can Be Procured.Util Will Replace Switches W/Qualified Switches Prior to Start of Cycle 3 Operation Scheduled for May 1979)
  • ML20238C748  + (In Camera Filing.* Advises That Pages 472-488 of Deposition of Hl Hofmann Taken in Camera on 870820,including Audio Tapes Prepared at Time of Deposition)
  • ML20205F716  + (In Camera Filing.* Informs of in Camera Filing of Intervenor 850405 Exhibit 42-A,ASLB Undated Exhibit 7 & Applicant 860902 Exhibit 126)
  • ML20209H381  + (In Camera Submission in Braidwood.* Informs of Receipt of J Gallo ,Docketed on 870109,containing Info Subj to Protection Under Commission 861107 Protective Order.Ltr Treated as in Camera Filing)
  • 05000335/LER-1979-028-01, In Cold Shutdown During Hurricane,Cable Fell Into Startup Transformer B.Ac Electrical Sys B de-energized & Diesel Generator Failed to Start.Caused by Delay in B Diesel Binding  + (In Cold Shutdown During Hurricane,Cable Fell Into Startup Transformer B.Ac Electrical Sys B de-energized & Diesel Generator Failed to Start.Caused by Delay in B Diesel Binding)
  • ML14273A480  + (In Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility)
  • ML12011A181  + (In Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility)
  • ML14111A300  + (In Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility)
  • ML19269C441  + (In Compliance w/10CFR50.55E,forwards Rept Description of Neutron Suppl Shield, Describing Collar/Saddle Shield & Radiation Analysis Performed to Determine Adequacy of Suppl Shield)
  • ML18142A589  + (In Connection with AEC Hearing to Consider Issuance of a Construction Permit to Rochester Gas & Electric Power Corp. to Construct a Reactor to Be Located on South Shore of Lake Ontario, Wayne County, Ny)
  • ML17276B253  + (In Core Instrumentation Assembly)
  • ML20148N059  + (In Decision ALAB-506,ASLAB Denies TVA Claims That NEPA Did Not Expand NRC Jurisdiction,That NRC Staff Is Overstepping Bounds of Atomic Energy Act of 1954 Section 271 & That TVA, as fed-organized Util Is Excused from NRC Regs)
  • ML25079A007  + (In Draft Application Revision Notification)
  • ML19206B053  + (In Effort to Make Public Participation More Meaningful, Extends Invitation to Meet Informally W/Regulatory Staff Early in Licensing Review Process)
  • ML19282B947  + (In Further Response to Requesting Documents Re Low Population Zones,Forwards Secy 78-111 & Secy Consent Calendar Item 78-624.W/o Encls)
  • ML18230A830  + (In Matter of Application of Carolina Power & Light Company, for Increase in Rates & Charges - Testimony of N. Edward Tucker, Utilities Engineer, Division of Engineering)
  • ML18230A831  + (In Matter of Application of Carolina Power & Light Company, for Increase in Rates & Charges - Testimony of Dennis J. Nightingale, Utility Engineer, Division of Engineering)
  • ML18230A826  + (In Matter of Application of Carolina Power & Light Company, for Authority to Adjust & Increase in Rates & Charges - Testimony of Eugene H. Curtis, Jr., Operations Engineer, Operations Analysis.)
  • ML18230A827  + (In Matter of Application of Carolina Power & Light Company, or Increase in Rates & Charges - Testimony of Dennis W. Goins, Economist)
  • ML18230A832  + (In Matter of Application of Carolina Power & Light Company, for Increase in Rates & Charges - Testimony of J. Reed Bumgarner, Utilities Engineer, Division of Engineering)
  • ML18230A829  + (In Matter of Application of Carolina Power & Light Company, for Increase in Its Rates & Charges - Testimony of Andrew W. Williams, Chief, Electrical Section, Division of Engineering)
  • ML18230A828  + (In Matter of Application of Carolina Power & Light Company, for Increase in Rates - Testimony of H. Randolph Currin, Jr., Senior Operations Analyst, Operations Analysis Section, Division of .)
  • ML20005G141  + (In Matter of Subpoena of J Corder.* Forwards Motion to Modify Subpoena & for Protective Order for J Corder)
  • 05000368/LER-1982-033-03, In Mode 6,safety Injection Check Valve LSI-13C Stuck in Open Position When Stroked by Hand.Caused by Protruding Valve Disc Stud Interfering W/Body & Holding Disc in Open Position  + (In Mode 6,safety Injection Check Valve LSI-13C Stuck in Open Position When Stroked by Hand.Caused by Protruding Valve Disc Stud Interfering W/Body & Holding Disc in Open Position)
  • ML18178A152  + (In Office Regulatory Audit Plan Regarding Severe Accident Mitigation Alternatives in the Subsequent License Renewal Application Review)
  • ML19276F396  + (In Order to Approve QA Program,Requests Statements That quality-related Activities Will Be Performed W/Specified Equipment & Under Suitable Environ Conditions.Requests Statement That Records Are Identifiable & Retrievable)
  • 05000335/LER-2076-034, In Order to Compensate for Errors Found in NSSS Vendors Strikin II Computer Code, Several Instrumentation and Control Setpoints Were Adjusted  + (In Order to Compensate for Errors Found in NSSS Vendors Strikin II Computer Code, Several Instrumentation and Control Setpoints Were Adjusted)
  • ML19273B310  + (In Order to Complete Guidance for Implementation of Environ Radiation Protection Stds,Requests Data from Onsite Survey,Area Radiation Levels & Environ Monitoring Instruments.Requests Response by 790420)
  • ML17053A576  + (In Order to Complete Guidance for Implementation of 40CFR190 Re Environ Radiation Protection Stds,Requests Data from Onsite Survey,Area Radiation & Environ Monitoring Instruments on Radiation Levels.Requests Response by 790420)
  • ML17173A721  + (In Order to Complete Guidance for Implementation of Environ Radiation Protection Stds,Requests Data from Onsite Survey, Area Radiation Levels & Environ Monitoring Instruments. Requests Response by 790420)
  • ML19273B317  + (In Order to Complete Guidance for Implementation of Environ Radiation Protection Stds,Requests Data from Onsite Survey, Area Radiation Levels & Environ Monitoring Instruments. Requests Response by 790420)
  • ML19273B314  + (In Order to Complete Guidance for Implementation of Environ Radiation Protection Stds,Requests Data from Onsite Survey, Area Radiation Levels & Environ Monitoring Instruments. Requests Response by 790420)
  • ML15223A497  + (In Order to Complete Review of 790202 Submittal Re Increase in Spent Fuel Pool Storage Capacity,Requests Addl Info on Structural Design)
  • ML19274E647  + (In Order to Complete Safety Evaluation of OL Application, Requests Addl Info Re Limiting Transients Using Odyn Code)
  • ML18113A918  + (In Order to Conform W/Std Excess & Loss Policy,Requests Amend to Facility Indemnification Agreement B-45 Re Location of Buildings & Structures)
  • ML19206A360  + (In Order to Expedite Review,Forwards Revised FSAR Pages Which Will Be Submitted W/Fsar Amend 62)
  • ML19199A681  + (In Order to Permit Meaningful Review of Revised Draft of 10CFR50 Re Financial Qualifications,Requires Breakdown of Fuel & non-station Facilities)
  • ML17317B102  + (In Order to Process FSAR Amends 81 & 82 as Class III License Amends,Forwards Addl Licensing Fee.Requests Further Guidance on Proper Classification of OL-related Submittals)