Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141L868 + (Forwards Util Transmitting Torus Baffles Insp & Repair Rept for Plant)
- ML19312C255 + (Forwards Util Transmitting Util Jul 1970 Environ Rept.W/O Encl)
- ML20072K895 + (Forwards Util Transmitting Vols 1-3, Independent Design Review of Waterford Steam Electric Station Unit 3 Emergency Feedwater Sys.Sys Design Adequate)
- ML17279A243 + (Forwards Util Transmitting Washington Nuclear Plant-2 Fire Protection Plant Reevaluation, Per Concerns Raised by Region V & Nrr.Results of Reevaluation May Have Significant Impact on Amend 37 to FSAR)
- ML20141K973 + (Forwards Util Transmitting semi-annual Rept 4 for Jan-June 1971)
- ML19312C423 + (Forwards Util Transmitting,Description of Cause & Correction of Damage to Control Rod Drive Mechanisms During Preoperational Testing of Oconee 1. W/O Encl)
- ML20113B278 + (Forwards Util USI A-46 Seismic Evaluation Rept Vols I/V & USNRC USI A-46 Resolution Ssel & Relay Evaluation Rept for April 1996 Vol I of Viii)
- ML20041E245 + (Forwards Util Understanding of Resolution of Issues Raised at NRC 820217 & 18 Security Meeting.Also Forwards List of Attendees.Encls Withheld (Ref 10CFR73.21))
- ML17263A668 + (Forwards Util Update of Status of Generic Ltr 89-10 MOV Test Program at Station)
- ML18046B234 + (Forwards Util Update of TMI Action Item II.K.3.30 (Revised Small Break LOCA Methods) Inadvertently Omitted from Re Action Item Status & Update)
- ML20100J765 + (Forwards Util Updated Operator Licensing Exam Schedule Per Administrative Ltr 96-01)
- ML20134G051 + (Forwards Util Updating Progress on Unit 1 During Jul 1985 for ASLB Info.Related Correspondence)
- ML20126C435 + (Forwards Util Visual Insp Procedure SMI-1-1-1, Preservice Baseline Insp of Low Pressure Turbine, in Response to NRC 800313 Request.Ultrasonic & Visual Insp of Low Pressure Turbines Is Scheduled to Be Completed by 800331)
- ML19309A420 + (Forwards Util W/Addl Info Re Corrective Action Program for Limitorque Valve Operator Switch Problem Described in Bulletin 72-03)
- ML19319B178 + (Forwards Util W/Addl Info on Auxiliary Svc Water Sys in Response to AEC 721031 Request.W/O Encl)
- ML20079N961 + (Forwards Util W/Attachments Constituting Util Application to Expand Spent Fuel Pool.Util 821021 Encl Ltr Corrects Info in Application.W/O Encl.Related Correspondence)
- ML19326C729 + (Forwards Util W/Attachments Re Preoperational Environ Surveillance Program for Radiological Monitoring of Environ at Site.W/O Encl)
- ML19322B204 + (Forwards Util W/Data Sheets for Review.W/O Encl)
- ML19319D310 + (Forwards Util W/Encls Re Preoperational Environ Surveillance Program.W/O Encl)
- ML20133B686 + (Forwards Util W/Investigation Rept Re Alleged Intimidation of Daniel Intl Corp Inspector by Supervisory Employee.Documents Returned Since Requested Exemption from Disclosure Per 10CFR2.790 Cannot Be Assured)
- ML19343D115 + (Forwards Util W/Payment of Review Fees)
- ML19308B144 + (Forwards Util W/Replacement Figures & Util W/Missing Figures 4 & 7.W/o Encl)
- ML19308B175 + (Forwards Util Which Files Request for Issuance of License Authorizing Limited Power operation,1971 Supplemental Environ Rept & Statement Why CPPR-34 & 35 Should Not Be Suspended.W/O Encl)
- ML20207K035 + (Forwards Util Which Transmitted Corrected Pages to SG Replacement Outage Startup Rept.Subject Ltr Was Inadvertently Not Sent to NRC Dcd,As Required by 10CFR50.4)
- ML20083J231 + (Forwards Util Which Transmitted Suppl 2 to Rept of third-party Review of Steam Generator Repair Program.Svc List Encl)
- LIC-95-0147, Forwards Util White Paper Re Findings from Boraflex Insp Conducted by EPRI in 1994 + (Forwards Util White Paper Re Findings from Boraflex Insp Conducted by EPRI in 1994)
- ML19340B381 + (Forwards Util Withdrawal of Application)
- ML19340B382 + (Forwards Util Withdrawal of Application)
- ML20140B467 + (Forwards Util Workers Union of America & Mi State Util Workers Council Response to Order to Show Cause Why Appeal Should Not Be Dismissed.Lj Campbell Affidavit Also Encl)
- ML20140B471 + (Forwards Util Workers Union of America & Mi State Util Workers Council Response to Order to Show Cause Why Appeal Should Not Be Dismissed.Lj Campbell Affidavit Also Encl)
- ML18046A748 + (Forwards Util Workers Union of America & Mi Util Workers Council Reply Supporting Request for Hearing)
- ML18046A749 + (Forwards Util Workers' Union of America & Mi Util Workers Council Reply Supporting Request for Hearing)
- ML20127N994 + (Forwards Util as Change 3 Authorizing Reduction of RHR Svc Water Min Pump Discharge Head Pressure from 550 Ft to 500 Ft at Plant.W/O Encl)
- ML20046C044 + (Forwards Util by Which Application for Proposed Change 166 Has Been Withdrawn)
- ML20087P115 + (Forwards Util cross-examination Plans for Suffolk County Testimony on Contentions 24 & 24.S.W/o Encl.Related Correspondence)
- ML20199C418 + (Forwards Util for Processing)
- ML19344D917 + (Forwards Util in Response to Notice of Violation & Imposition of Civil Penalties,For Review)
- ML20151P006 + (Forwards Util in Response to Questions Arising from 871209 Public Meeting)
- ML19319D012 + (Forwards Util re-evaluation of Moderator Dilution Accident as Suppl to RO-77-52)
- ML20033H262 + (Forwards Util s Forwarding Feb 1990 NPDES Monitoring Repts for Plants.W/O Repts)
- ML20107M052 + (Forwards Util s Forwarding Rev 1 to Summary Evaluation Structural Significance of Basemat NDT Results & NDT Evaluation of Basemat Concrete.Related Correspondence)
- ML20027B755 + (Forwards Util s Re Activities Taken or Underway to Correct Significant Deficiencies for Offsite Emergency Preparedness Identified by FEMA in 820730 Interim Findings)
- ML19317D628 + (Forwards Util s Re Core Flood Line Isolation Valve CF-1 Operating Mechanism Failure,Reactor Bldg Spray Valve Failure & 730306 1A1 Reactor Coolant Pump Oil Fire Incident Rept.W/O Encl)
- ML20195D110 + (Forwards Util s Transmitting Info Requested by Cygna.Related Correspondence)
- ML20234D233 + (Forwards Util s Transmitting Revised Pages to Plant SAR & Addl Info on Proposed Tech Spec Changes Re Pump Room Flood Protection & Vacuum Breakers & Re Vacuum Breaker Interim Surveillance Program.W/O Encls)
- ML20030B803 + (Forwards Util s to NRC Re Addl Info for Radiological Emergency Response Plan.W/O Encl)
- ML18036B248 + (Forwards Util self-assessment of Performance During Period Beginning 920524,in Response to SALP Rept for 910524-930523, Documenting Info Presented to Util at 930322 Meeting. Security Personnel Provided Addl Training During Period)
- ML18036A698 + (Forwards Util self-assessment of Plant Performance During Period Beginning 910523 to Present,For NRC Consideration in Reviewing Unit 2 SALP & Documents Info Presented to NRC at 920417 Meeting in Atlanta,Ga)
- ML19337A634 + (Forwards Util to Marshall Re Matter of Petition for Increase in Levelized Energy Cost Adjustment Charge,Per NRC 790921 Request for Ongoing Info Re Significant Regulatory Developments)
- ML19329E773 + (Forwards Util to AEC Transmitting Rept Per Condition 4 of Memorandum & Order ALAB-106)
- ML19312C353 + (Forwards Util to ASLB Re Jr Harris Five Requests in Opening Statement to Util & Util 670901 Answer to Five Demands.W/O Encl)
- ML20042B673 + (Forwards Util to B Stephens Inadvertently Omitted from)