ML20126C435

From kanterella
Jump to navigation Jump to search
Forwards Util Visual Insp Procedure SMI-1-1-1, Preservice Baseline Insp of Low Pressure Turbine, in Response to NRC 800313 Request.Ultrasonic & Visual Insp of Low Pressure Turbines Is Scheduled to Be Completed by 800331
ML20126C435
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/26/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML20126C439 List:
References
NUDOCS 8004010374
Download: ML20126C435 (1)


Text

.....

a 400 Chestnut Street Tower II March 26, 1980 Director of Nuclear Reactor Regulation Attention:

Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Rubenstein:

In the Matter of the Application of

)

Docket No. 50-327 Tennessee Valley Authority

)

Enclosed is our response to your letter to H. G. Parris dated March 13, 1980, requesting information on the low pressure turbine inspection required by section 9.3 of the Sequoyah unit 1 technical specifications.

The enclosed information consists of the TVA visual inspection procedure for the low pressure turbines (Special Maintenance Instruction SMI-1-1-1) and a description of the Westinghouse ultrasonic inspection program (Enclosure 2).

Ultrasonic and visual inspection of the unit 1 low pressure turbines is scheduled to be completed by March 31, 1980.

If you have any questions, please get in touch with D. L. Lambert at FTS 854-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY

.r s

L.M.Milhs,t, nager Nuclear Regulation and Safety Enclosures Boo /