ML19309A420
| ML19309A420 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 02/15/1973 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | James Keppler US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19309A421 | List: |
| References | |
| NUDOCS 8003270864 | |
| Download: ML19309A420 (1) | |
Text
e UNITED STATES V
ATOMIC ENERGY COMMISSION DIRECTOR ATE OF REGULATORY OPEFsATIONS REGION V
'/~ #,
i 2111 BANCROFT WAY M
9 g
BER KELEY. c ALIFO RNI A 94704 vs ens ui-sies
==v m er,,,,,
E315 1973 J. G. Keppler, Chief Reactor Testing and Operations Branch, RO:HQ REGULATORY OPERATIONS BULLETIN 72-3 Attached is a letter received from Sacramento Municipal Utility District containing additional information concerning their corrective action program for the Limitorque valve operator switch problem described in our subject bulletin. The letter is a followup to their initial letter of reply dated December 22, 1972.
As mentioned in our memo of January 19, 1973, we plan to follow SNUD's activities on this matter until corrective action has been completed.
1 Chu G. S. Spencer, Chief Reactor Construction and Operations Branch i
v-l P
., /
4 s
8008270 ((f g
L
%...c
,