ML19309A420

From kanterella
Jump to navigation Jump to search
Forwards Util W/Addl Info Re Corrective Action Program for Limitorque Valve Operator Switch Problem Described in Bulletin 72-03
ML19309A420
Person / Time
Site: Rancho Seco
Issue date: 02/15/1973
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: James Keppler
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19309A421 List:
References
NUDOCS 8003270864
Download: ML19309A420 (1)


Text

e UNITED STATES V

ATOMIC ENERGY COMMISSION DIRECTOR ATE OF REGULATORY OPEFsATIONS REGION V

'/~ #,

i 2111 BANCROFT WAY M

9 g

BER KELEY. c ALIFO RNI A 94704 vs ens ui-sies

==v m er,,,,,

E315 1973 J. G. Keppler, Chief Reactor Testing and Operations Branch, RO:HQ REGULATORY OPERATIONS BULLETIN 72-3 Attached is a letter received from Sacramento Municipal Utility District containing additional information concerning their corrective action program for the Limitorque valve operator switch problem described in our subject bulletin. The letter is a followup to their initial letter of reply dated December 22, 1972.

As mentioned in our memo of January 19, 1973, we plan to follow SNUD's activities on this matter until corrective action has been completed.

1 Chu G. S. Spencer, Chief Reactor Construction and Operations Branch i

v-l P

., /

4 s

8008270 ((f g

L

%...c

,